Repair and Restoration of collecting Pipe line 4 (Four) nos 100 mm dia. from river bed Tube Well to CWR in river Sali for the flood damaged under Beliatore Water Supply Scheme under Bankura Sadar Sub -Division of Bankura division P.H.E. Dte.
Loading…