Systems/Equipments (Version 2) - Industry Unit; To replace the reflector plate of the fibrizer and give a satisfactory trial; Buyer, Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged side plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfactor.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Cutting and removing the weak and damaged bottom plate of SRC and IRC and replacing it with the given new 08 10 mm plate and giving a leakproof satisfact.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To make and errect the guide of SRC and IRC as per the given sample and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To make runner boxes of SRC and IRC and give satisfactory trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To do the work of fitting the liner of the given SS plate at the bottom of SRC and IRC and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To fabricate boots using 8 10 mm MS plates provided by SRC and IRC and to conduct a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Carry out strengthening work using the channels and angles provided by SRC and IRC and conduct a satisfactory trial; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To fabricate the weak sloppy plates of the Donali suit fitted on Milo from the given MS plate as per the drawing and give a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the worn out TRPF cover fitted on the mill and making and fitting a new cover using the plate given as per the drawing sample and giving a satis.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; To carry out the work of tipping the teeth of mill rollers and conduct a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; To carry out the work of Chevron cutting as per requirement on mill rollers and give satisfactory trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Work involving the errectation of broken teeth on the mill s pressure chute repair of worn out teeth via hard facing and conducting a satisfactory tria.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; dismantling the old pressure chute errected on the mill completely replacing the corroded section repairing and welding the damaged parts of the SS plate .., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabricate the juice tank for the mill house using the provided 6 8 mm plate and conduct a satisfactory trial run; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the bottom of the supply juice tank errecting a 12 mm plate in its place and conducting a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Manufacturing the bed for the S R C and I R C, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Remove the worn out TRPF headstock side plate errect a 6mm plate in its place and conduct a satisfactory trial; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Fabricating teeth for the hydraulic grab replacing old or damaged teeth with new ones and conducting a satisfactory trial run; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; a Dismantling old columns beam channels etc b Manufacturing and installing new columns beam channels etc; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Removing the old corroded platform and replacing it with a new one; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Installing 16 inch 18 inch manholes with blinds; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Constructing a bed for the pump fitting the pump and motor and conducting a trial run of up to 20 HP; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded pipe lines up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded tees up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting weak corroded nipples up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated cross member up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated band up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak throated flange up to 12 Inch and providing satisfactory leak proof trials; Buyer, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Dismantling fabricating and erecting a weak sloping reducer up to 12 Inch and providing a satisfactory leak proof trial; Buyer
Loading…