Construction of 4.50m Dia Infiltration Well for a depth of 9m below bed level and 2m depth above bed level,80mm Dia,100mm Dia DI Pipe line , 35Sqmm,25 sqmm UG Cable,15.00HP,7.50HP Open well sub Motor,20HP,15.00HP Pannel Boardat Thenpennai River
Loading…