Loading…
Loading…
4,211 results • Latest
Maintenance kit for PEAPV with switch consisting 07 items (513706000 ,525702000A,525701000A,525801000,511702000)
supply of fresh mutton
Providing Power wiring in Government Industrial Training Institute Pinangwan in Distt. Nuh.
Replacement of 02 No. Lifts installed in Mini Secretriate at Rewari in Distt Rewari ( Pdg. Granite stone and Repairing of lift well only)
Provision of Repair,Repainting of Toilet Module and Non-AC Area work for LHB coaches at RCNK/SNP
HEW 83 Providing, Installation, Testing and Commissioning (PITC) of 50 KVA Diesel Generator (DG) Set (Crompton/Kirloskar or Equivalent Approved Make) with 1 (One) Year Free Comprehensive Maintenance For Sewerage Disposal System in Sector-2, Palwal.
EXTRUDED FLAT MOULDING Drawing No.:- CC-43334, alt.(nil) (2000 mm length.) [ Warranty Period: 30 Months after the date of delivery
4 Pole Contactor LS 4SK4.00, operational current 100 Amp, Coil Voltage 110V AC/DC, Aux Contact HS8K11 (2 nos.) & Aux Contact HS7k10 (1 nos.), AC-3, rated voltage 750 V, with RC unit suitable for Net-1 & Net-2 of LHB EOG Non AC coaches confirming to item no. 33 & 34 of Bill of Material (BOM) of RCF specification no. EDTS-355 (Rev-1) with amendment no. 1 to 6 or latest. [ WarrantyPeriod: 30 Months after the date of delivery ]
Annual and special repair of electrical works in the campus at SWH Jhajjar.
GE(SOUTH) AMB 36 2026 2027 COMPREHENSIVE REPAIRS TO OTM ACCN OF ZONE II V AND ZONE-VI AT AGE B R I (SOUTH) UNDER GE (SOUTH) AMBALA CANTT