Loading…
Loading…
847 live485 closing this weekmost from Department Of Military Affairs and PUBLIC WORKS DEPARTMENT
847 results • Best match
SITC of 1 No new 2TR Split AC Unit in Ayurveda Clinic at MLA Hostel, Thiruvananthapuram
AMC for Cabin Air Conditioners of 500TPH Feeder Breakers and HEMM working at Khairagura OCP, BPA for a period of 3 years
Inviting for Expression of Interest to identify the lead industry partner to setup Commercial Refrigeration and Air Conditioning lab
Periodical Comprehensive Maintenance for 2 years of Room Air Conditioning Machine of WBSAMB Office at 729, Anandapur, Kolkata 700107
Work of routine, preventive, overhauling and breakdown maintenance of Air conditioning systems of 1 x 800 MW Wanakbori TPS
Annual Maintenance Contract of Split Type AC units at F-type Govt. Bungalows/Quarters ( F-02, F-03, F-04, F-05, F-05, F-06, F-07, F-10, F-A1, FA2, F-A3, F-A4, F-B1, F-B2, F-B3, F-B4, F-B5) at Altinho, Panaji - Goa for the period of one year.
Operation and Maintenance of Electrical Installations and Fans in Non - Resindential Building R/M pumpsets Street Lights 11 KV Sub Station and DG Set at Bureau of Immigration campus Mamidipally near RGIA Hyderabad for the year 2026-2027. SH : ... VRF Air Conditioning System ...
Supply of Refrigerant Gas Mafron R-22 and R-134a in Cylinders for Air conditioning plants at GSECL, Wanakbori T.P.S
Replacement of Window type Air Conditioner machines at different O.Ts of Vidyasagar SGH, Behala, South 24 Parganas.
Maintenance Work of Electrical Works, Air Conditioner (AC), RO Plant and Other Accessories in Kallakurichi Municipal Office
Comprehensive Maintenance of Window,Split AC 1.5/2 TR and Water Cooler installed in Kasturba Hospital under CSPZ
Electrical Installation including SITC of Air Conditioning arrangement in the proposed office of HOD/Philosophy, Presidency University, College street Campus, Kolkata.
Urgent change of Air Conditioning machine at Old PICU of Pediatric Surgery Department at CB building under NRSMC and Hospital, Kolkata
As described in BOQ
A&A to E.I. ,Conference Sound System and Air Conditioner Machine in ITI Vinchhiya , Taluka : Vinchhiya , Dist: Rajkot.
Electrical, Air conditioning works along with allied works for renovation of the 13th floor CMO office under Nabanna Electrical Sub Division (PWD).
SUPPLY DELIVERY AND INSTALLATION OF AIR CONDITIONING MACHINE AT THE HALL OF CIVIL DEPARTMENT IN SSU OFFICE BUILDING IN WARD NO.130
SUPPLY, INSTALLATION AND COMMISSIONING OF AIR CONDITIONING SYSTEM AT GOVERNMENT MEDICAL COLLEGE (AYUSH POLYCLINIC & UDYOG BHAVAN PART - II) KABIRDHAM , DISTRICT- KABIRDHAM (C.G.)
SUPPLY, INSTALLATION AND COMMISSIONING OF AIR CONDITIONING SYSTEM AT GOVERNMENT MEDICAL COLLEGE (AYUSH POLYCLINIC & UDYOG BHAVAN PART - I) KABIRDHAM , DISTRICT- KABIRDHAM (C.G.)
Supply of AHU Coil (Chiller Water Cooling Coil) for central Air Conditioner system of 210MW, Unit-6, PTPS, Panipat.
Comprehensive Annual maintenance service of Duct and Packaged air conditioning system of ATIC auditorium and Swami Vivekananda Hall of UBK Pundibari Cooch Behar
A&A to Ro Plant , Outdoor Light Fittings and Air Conditioner Machine in ITI Building at Upleta , Taluka: Upleta , Dist:Rajkot.
Providing Comprensive maintenance of Air Conditioner (As per detail schedule) in P.W.D. (E/M) Sub Division, High Court, BIlaspur (C.G.)
Water Dispenser, Semi Automatic Washing Machine, 1.5 Ton Inverter Split AC, 55 Inch Smart LED TV, 65 Inch Smart LED TV
Supply, Installation, Testing and Commissioning of Air conditioning system at the Bar Association room No. 18, 1st flr, Centenary Building of Honorable Calcutta High Court.
Replacement of Old Split and Floor Standing Type AC Machine installed at Ejlash of the District Judge, Paschim Medinipur - SITC Air Conditioning System. (1st ReTender)
Replacement of very old Air Conditioning Machines with allied EI work installed at various departments OT rooms of Burdwan Dental College and Hospital, Purba Bardhaman.
Electrical Work for Vertical extension of ANM (R) Traning School at 3rd Floor within the premises of Vidyasagar S.G. Hospital, Behala-SITC of Air Conditioning Machines.
SITC of 2nos 2TR Hi-Wall Split AC machine at Right Front Room of HQ Finance, G Block, 3rd floor of Unnayan Bhavan.
Tentage Service Lumpsum Based - Fair, Parties, Corporate Functions, Exhibitions, Concerts, Outdoor Gatherings, Social Gatherings; Floorings, Lighting, Air Conditioning, Tent Rentals, Theme Based Installation, Decoration, Furniture & Equipment Rentals..
SITC of new Air conditioning machines at the room no. 224 at 2nd floor, A block, department of tourism, WB govt. at New Secretariat Building, Kolkata-700001.
Supply and Installation of Tower type Split Air Conditioners with all necessary accessories - for utilisation at various locations of PJHES(Revulapally(V), Jogulamba Gadwal (Dist.)) and LJHES(Atmakur(V),Wanaparthy(Dist.))
Providing Additional AC Units, plug sets, Camera, Cat-6 cables and Incoming LTUG cable in Pre-Fabricated Workshop Building in Government Polytechnic college,Trichy-22
Dismantling and Re-installation of Air Conditioner Machines on as when required basis at different building at Burdwan Medical College and Hospital, Purba Bardhaman.
Annual Comprehensive Maintenance and Servicing of 2 X 40 Tr. With one stand by Central Air- Conditioning Plant Installed at Centenary Building, High Court, Kolkata. (For 12 Months).
Tentage Service Lumpsum Based - Fair; Floorings, Lighting, Air Conditioning, Tent Rentals, Theme Based Installation, Decoration, Furniture & Equipment Rentals, Climate Control, Power Supply, Logistics & Delivery, Maintenance & Support, Safety Measure..
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - SH: Attending Periodical Maintenance with minor spares for 7 TR HPAC units at MSC Velampeta, Visakhapatnam
Comprehensive Annual Maintenance Contract for 320 Nos Split Air Conditioning Systems installed in various wards, Departments and Offices of SVRRGGH, Tirupati for the Year 2026-2027 (2nd Call)
Est. No.SR/MESD/MS/1048 /2026-27 Providing addition,alterations and repairs to Air Conditioning system at Room No 237, 241, 720, 721, 723, Annex Building, Mantralaya, Mumbai.
Annual Maintenance of Electrical Installation, Air-conditioning, Stage Light, Stage Craft, Sound System and maintenance materials for Rabindra Bhaban, Chinsurah, Hooghly----- Annual comprehensive maintenance of all sound systems.
Supplying, Installation, Testing and commissioning of AV systems in Class Rooms No 508 & 509 at 5th floor, SATMET building, along with provision of stage lighting, motorized stage curtain, AV system, Projector/Display system, air conditioning system and allied facilities at vrishti Sabhaghar including renovation, modification and upgradation of associated civil, electrical and other allied works of existing class room No. 508 & 509 and Vrishti Sabhaghar at Mausam Bhawan Lodhi Road New Delhi (SH: E&M and Civil works)
Annual Comprehensive Maintenance of 2.0/1.8/1.5 Ton capacity Split type Air Conditioner machines installed at CMOH Office Asansol in the dist. of Paschim Bardhaman
Replacement of the existing AC/centralized heating system with a modern VRF (Variable Refrigerant Flow) centralized air-conditioning system at Embassy of India, Via Sicilia 136-138, Rome, Italy
As per the tender document
Comprehensive Annual Maintenance Contract for the existing Ductable Air Conditioning System installed at the Modular Operation Theatres and Emergency Department SVRRGG Hospital, Tirupati for the Year 2026-2027 (2nd Call).
Annual Maintenance of Electrical Installation, Air-conditioning, Stage Light, Stage Craft, Sound System and maintenance materials for Rabindra Bhaban, Chinsurah, Hooghly-------- Annual comprehensive maintenance of stage light and stage craft.
Comprehensive Annual Maintenance and Servicing of Window Split and Ceiling Suspended Type Room Air Conditioner under Assembly House Electrical Section PWD (For 12 Months) PHASE - I
SITC of Air-Conditioning machines at Ministerial Chamber along with Secretariate setup in respect of Minister-in-charge of Parliamentary Affairs Department located at Main Block, 2nd floor of Writers Buildings.