Loading…
Loading…
1,175 results • Best match
providing SOP to IPH Handpump at village Koon in GP Parnoo by providing 3-phase LT Line extension from existing 100 KVA SStn.,Khata Ser in E section Navgaon under Electrical Sub-Division, HPSEBL,Darlaghat
Sub Head Drilling Lowering and Development of 125 metrs. Deep Tube Well at Village Bhateki Pariyarian)
Drilling , lowering assembley and devlopment of tube well 80 meter deep at Govt. Primery School Batan
SH Drilling , lowering of assembly and development of 1 No. 175mm dia borewell 90 mtrs deep at I.T.I Mehatpur in Tehsil Distt Una HP ( Deposit work)
SH. Replacement of submersible pumping set at energized hand pump at Swahan Nr. Dispensary.
Sub Head Construction of Pump house Laying jointing Testing GMS pipe in Rising Main and distribution system, Providing erection of pumping machinery with allied accessories Construction of Boundary wall around the pump house and Providing and Instal
SH Supply and Errection of pumping machinery and rising main near samala and bauthinala and 20000 ltr cap RCC storage tank
under Jal Shakti Section Mangwal Sub. Division Gangath) For One Year
Drilling Lowering and Assembling Development of 01 No Bore Well 200 mm dia 60 mtr deep (LIS Complex Rampur Banjaran) under JJM
Sub Head Drillling lowering of assembly and development of Tubewell 1 Bhud Nichla 2 Bhoopnagar 3 Bhatoli Kalan 4 Karuwana and Gullarwala 150 mtrs depth and 5 Malkumajra 6 Bhud Upperla 7 Jhandewali Kharuni 8 Malkumajra Gharat 125 mtrs depth
Providing Errection mono submersible pump set 7.5 HP with allied accessories.
Sub Head Annual Repair and maintenance of pumping machinery for three years
Repair of submersible and centrifugal pumping machinery
PROVN OF BOREWELL AND PUMPING ALONGWITH WATER STORAGE FACILITY AT JHAKRI IN THE AREA OF AGE EM (WE) POOH UNDER GE 863 EWS
SH Providing, supplying and fixing of Submersible pumping machinery with its allied accessories for 2 Nos. Borewell, 1 No. at Near Sissu Halipad and 1 No. at Atal Tunnel North Portal
Drilling , Lowering of assembly and development of 190 mtrs deep tubewell at Ispur (Lawana Majra) in Tehsil Haroli Distt. Una (under CRF)
Drilling , Lowering of assembly and development of 140 mtrs deep tubewell at village upper Arniala in Tehsil and Distt. Una under PMKKKY
sub head development of sources drilling lowering and development of 1 no tube well 140 mtrs deep
Drilling, lowering of assembly and development of 150 mtrs. deep tube well near Gaushala at village Chatara
Drilling Lowering, assembling and development of Mini Tube well 80 Meter Deep on Hobbar road at Chowari)
Providing Water Supply scheme for the proposed Admin. Block at Village Punjwana from proposed BDP site in tehsil Haroli Distt. Una (H.P) (SH Drilling, lowering and development of 2 Nos. Tubewells 130 mtrs deep each at Lower Haroli)
(SH. Energization of hand pump near small bridge in village Jandori under GP Rour Jaman).
Providing, laying and jointing of pipe line,P I bore well, P E of submersible pump C O filter bed cum sed. Tank
Improvement of path from old amb road upto NP boundary via tubewell no.48 in ward no.1 of NP Gagret Distt.Una H.P
Drilling lowering of assembly development of TubeWell 80 mtrs depth Rotary Rig at village Parduni GPParduni Tehsil Paonta Sahib District Sirmour HP
Pumping Machinery Rising Main RCC Water storage tanks distribution pipes
Laying Jointing of HDPE Pipe in distribution system
Supplying of 50 HP Submersible Pumping set and P/F new Starter 50 HP). (Under PDNA)
Replacement of submersible pumping machinery without allied accessories.
Sub Head Annual Repair and maintenance of pumping machinery for three years (Job-II)
Sub Head Auunal Repair and maintenance of pumping machinery for three years.
Sub Head Outsourcing of deployment of 30 Nos Multi Purposed worker for running and Operation of pumping machinery and distribution system
Sub Head Annual Repair and maintenance of pumping machinery for three years (Job-I)
Providing Errection mono Submersible Pump set 15HP
Providing LWSS to village Lehri Sarail through tubewellin Tehsil Ghumarwin Distt Bilaspur Under SCSP Demand No 32 SH Providing and Installation of Borewell 200mm dia JOB No 1
Augmentation and Improvement of LWSS Dabhota in Tehsil Nalagarh District Solan HP Sub Head Drilling lowering and assembly of Tubewell 150 mtrs depth
Construction of WSS Khad in Tehsil Haroli Distt. Una (SH Drilling , Lowering of assembly and development of 170 mtrs deep tubewell ) under CRF
Tender for Prov. SOP to LWSS for Shallow Tube well Scheme at Kotri Chandpur UES Girinagar UESD Dhaulakuan
Tender for SOP to Irrigation Tube-Well IPH Scheme at Upper Bhangani in E/S Bhangani UESD Puruwala
Tender for SOP to Irrigation Tube-Well IPH Scheme Bharoli at Puruwala in E/S Puruwala UESD Puruwala
AR an MO WSS to Rajeev Gandhi Govt Engg. College Nagrota BagwanSH_Drilling and Lowering of Mini Tube Well
sub head drilling lowering and development of mini tube well at source of LWSS Lahat Kotlu Phase 1st)
Sub Head Drilling lowering of assembly and development of 140 mtrs deep Tubewell, 2 Nos. at Thoda and Joghon 125 Mtrs deep Tubewel at Baroona 160 mtrs deep Tubewell at Jagatpur
Supply, Errection and Commissioning of Solar Pumping Machinery in Bore Well near Misserwala Panchayat Ghar and near house of Sh. Yamin Master Majra PHC
(SH Establishment of source by drilling 200 mm dia bore well on the left bank of Ghambrolla Khad near existing intake chamber) (under PDNA)
(SH- C/O wire crate embankment from RD 17 to 32 at near pump house neol Noutod and protection of bore well )Under PDNA
Construction of irrigation tubewells for left out area of various villages of Haroli constituency in Distt. Una HP (SH Drilling , lowering of assembly and development of 125 mtrs deep T/well at Dharampur and 250 mtrs deep T/well at Rora)
Tender for New 3 Ph and 1 Ph LT line for 4 No. Agricultural TubeWells from exist. 11/0.4 kV,63 kVA Substation AT 11 at village Athwan in (E) section Koharchhan(U) ESD HPSEBL Mubarikpur. (T.S. NO. 52/2023-24)
Construction of irrigation tubewells for left out area of various villages of Haroli constituency in Distt. Una HP (SH Drilling , lowering of assembly and development of 150 mtrs deep T/well at Saloh and 300 mtrs deep T/well at Baliwal)
Drilling lowering of assembly development of TubeWell 80 mtrs depth Rotary Rig at village Toka Nagla GP Kundiyon Tehsil Paonta Sahib District Sirmour HP