Loading…
Loading…
999 results • Best match
Supply Installation Construction maintenance and Pump House OHT Distribution System all Electrical and Mechanical works including construction of Tube well and other Appurtenance Works at Gopalpur Sikhar Water Supply Scheme
Construction of Tube Well Pump House OHT and Laying and jointing of Rising Main and Distribution system of work of Race Course Police Line Water Supply Scheme under SASCI Programme
Construction of Tube Well SITC of pumping plant and other appurtunant Works under KUMBH MELA 2027 Programme at Bajari Wala 01 water supply scheme in Block Bahadrabad of District Haridwar
Construction of Tube Well SITC of pumping plant and other appurtunant Works under KUMBH MELA 2027 Programme at Bajari Wala 02 water supply scheme in Block Bahadrabad of District Haridwar
Custom Bid for Services - Repair and Maintenance of sewerage pump house SPH and tubewells at BHEL Haridwar Township
Custom Bid for Services - Conducting Bore Hole Test For Determination Of SBC Of Soil For Provision Of Single Living JCOs Accommodation Double Storied at 447 Coy ASC Sup Type G at Dehradun and Provn Of Single JCOs Accn Capacity 16 X JCOs For One Inf B..
Survey, construction and development of 01 No. new tubewell
Construction of Tubewell and other associated works at Markham Grant tubewell water supply scheme under JJM programme in Dist. Dehradun
Construction of Tubewell and other associated works at Simlas Grant tubewell water supply scheme under JJM programme in Dist. Dehradun
Construction of Tubewell and other associated works at Khairi Khurd tubewell water supply scheme under JJM programme in Dist. Dehradun
Construction of Tubewell and other associated works at Nagal Bulandawala tubewell water supply scheme under JJM programme in Dist. Dehradun
Supply of M.S plane casing pipe 100X5.0 MM (Bevel end) ERW 6 Meter length as per Table No-3 IS 4270/2001 with steel FE-410 at Central store Tubewell Division Ramnagar of Minor Lift Division Pithoraghar.
Supply of M.S plane casing pipe 150X5.4 MM (Bevel end) ERW 6 Meter length as per Table No-3 IS 4270/2001 with steel FE-410 at Central store Tubewell Division Ramnagar of Minor Lift Division Pithoraghar.
DRILLING AND DEVELOPMENT1 CUSEC TUBEWELL AT JIVANWALA
BORING OF TUBE WELL AND UNDERGROUND SUMP AT SFF ACADEMY CHAKRATA ( SH: C/O RCC SUMP, RUPP ROOM AND DEVELOPMENT OF SITE) Subwork/Packages: BORING OF TUBE AND UNDERGROUND SUMP AT SFF ACADEMY CHAKRATA ( SH: C/0 RCC SUMP, PUMP ROOM AND DEVELOPMENT OF SITE)
Maintenance of faulty borewell in TE Compound Rampura, Sitarganj, BA-Nainital
Installtion of India Mark II Hand Pump and its appurtenant work including supply of all materials labour T and P etc Complete in district Haridwar Block Roorkee Narsan
Installation of India Mark II Hand Pump and its appurtenant works including supply of all materials labour complete at vidhan sabha Khanpur of district Haridwar Under CM announcement
Installation of India Mark II Hand Pump and its appurtenant works including supply of all materials labour T and P etc complete at VikasKhand Bhagwanpur of district Haridwar
Installation of India MarkII Hand Pump and its appurtenant works including supply of all materials labour T and P etc complete at vidhan sabha Manglour of district Haridwar
onstruction maintenance and handing over to maintenance body of Rising Main Pump House OHT Distribution System all Electrical and Mechanical works including construction of Tube well at Hathiyathal Water Supply Scheme
Construction of Tube Well and Pump House SITC of pumping plant and other appurtenant Works under STATE SECTOR Programme at Kripal Nagar water supply scheme in Block Bahadrabad of District Haridwar
PROVISION OF BOREWELL NEAR P 41 AT NHO DEHARDUN UNDER GE CLEMENT TOWN DEHRADUN
Supply of I.S. marked electric resistance welded ERW plain casing pipe bevel ended as per table no3 of IS 4270 2001 with steel grade F E 410 of size 6 mtr length 150 mm nominal bore diameter 5.4 mm thick at Central Store Tubewell Division Haldwani
Supply of I.S. marked electric resistance welded ERW plain casing pipe bevel ended as per table no-3 of IS 4270 2001 with steel grade FE 410 of size 6 mtr length 125 mm nominal bore diameter 7.1 mm thick at Central Store Tubewell Division Haldwani
Construction of Tubewell at Race Course Distt Dehradun
Construction of Tubewell at Mazri Maffi Distt Dehradun
Construction of Tubewell at Khairi Mansingh Distt Dehradun
Providing Labour For operating tubewell At Ramnagar Block
SITC of Iron Removal Unit (rating 5-10 lpm) on India Mark-II Handpumps as per concept relevant to IS 12918/1990 and as per departmental drawing and design
Construction of Laldhang Water Supply Scheme of Haridwar Including Supply Installation testing and commissioning of Rising Main Distribution System Construction of Pump House Clear Water Reservoir Drilling Development of Tube well all
Construction of Gaziwali Water Supply Scheme of Haridwar Including Supply Installation testing and commissioning of Rising Main Distribution System Construction of Pump House Clear Water Reservoir Drilling Development of Tube well all
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections boring of tube well installation of pumping plants in Tejjupur Block Bhagwanpur water supply scheme
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections construction of boundary wall boring of tube well in Fakkarhedi (Block- Lasar) water supply scheme
Construction of Raheempur Water Supply Scheme of Haridwar Including Supply Installation testing and commissioning of Rising Main Distribution System Construction of Pump House Clear Water Reservoir Drilling Development of Tube well all
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections boring of tube well installation of pumping plants in Alawalpur Block Laksar water supply scheme
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections construction of boundary wall boring of tube well in Kalalhatti (Block-Laksar) water supply scheme
Construction of Kangari Water Supply Scheme of Haridwar Including Supply Installation testing and commissioning of Rising Main Distribution System Construction of Pump House Clear Water Reservoir Drilling Development of Tube well all
Supply Of HANDPUMP BODY COMPLETE AS PER DEMAND, Supply Of GI PIPE 32 MM S PER DEMAND, Supply Of CONNECTING ROD AS PER DEMAND, Supply Of SOCKET AS PER DEMAND, Supply Of LOWER VALVE AS PER DEMAND, Supply Of UPPER VALVE AS PER DEMAND, Supply Of HANDPUMP CLYINDER AS PER DEMAND, Supply Of CLYINDER LEATHER WASHER AS PER DEMAND, Supply Of EXCEL AS PER DEMAND, Supply Of BEARING AS PER DEMAND, Supply Of CHAIN AS PER DEMAND, Supply Of HANDLE AS PER DEMAND BOQ Title BOQ ITEM LIST
Installation of India Mark II Hand Pump and its appurtenant works including supply of all materials labour T and P etc complete at vidhan sabha Jhabreda of district Haridwar
Installation of India Mark II Hand Pump and its appurtenant works including supply of all materials labour T and P etc complete at vidhan sabha Jwalapur of district Haridwar
Rate Contract for the INSTALLATION OF 3 HP SUBMERSIBLE MOTOR PUMP SET IN INDIA MARK II HAND PUMP AND STRENGTHENING OF DISTRIBUTION NETWORK AT SAHASPUR VIDHANSABHA W/S SCHEME.
Construction of Shiv Nagar Water Supply Scheme of Haridwar Including Supply Installation testing and commissioning of Rising Main Distribution System Construction of Pump House Clear Water Reservoir Drilling Development of Tube well all
Construction of Peeli PadawWater Supply Scheme of Haridwar Including Supply Installation testing and commissioning of Rising Main Distribution System Construction of Pump House Clear Water Reservoir Drilling Development of Tube well all
Custom Bid for Services - Repair and Maintenance of GRV Motors Shaft Bushes Tubewells for FCX WW in HEEP Factory area
PROVN OF DI PIPE FOR EXTERNAL WATER SUPPLY RING MAIN SYSTEM FROM TUBE WELL 1 3 5 TO BOOSTER PUMP HOUSE AND BOOSTER PUMP HOUSE TO OHT FOR AOR OF GE CLEMENT TOWN
Supply Installation Construction maintenance and handing over to maintenance body of Rising Main Pump House OHT Distribution System all Electrical and Mechanical works including construction of Tube well at Madabela Water Supply Scheme
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections boring of tube well installation of pumping plants in Akbarpur Kalso Block Bhagwanpur water supply scheme
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections boring of tube well installation of pumping plants in Ibrahimpur Masahi Block Bhagwanpur water supply scheme
Supply and Laying and Jointing of pipe line and construction of OHT Pump House providing household connections boring of tube well installation of pumping plants in Bhagtanpur Abidpur Block Bahadrabad water supply scheme