Loading…
Loading…
8,715 results • Best match
Construction of Bridge on SH-14 to Charanmal Amlisonda Road VR-120 Km.0/100 Tal.Sakri Dist.Dhule
Construction of Bridge on Mevas to Ankushvir Khatwani Road Km.0/00 to 1/500 Tal.Akkalkuwa Dist.Nandurbar
Construction of Bridge on Math Belgaum Approach Road SH 71 Km 0/800 Tal vengurla Dist Sindhudurg
MH-3166 Construction of Bridge In Km.- 0/650 Umari - Pipari - Karla - Satoda - Pavnar Road Th. Wardha
Construction of Bridge at Javada Mandana Aslod Dhudkheda Taluka Border MDR-15 Km.27/600 Tal.Shahada Dist.Nandurbar
CONSTRUCTION OF BRIDGE BEHIND SAI ENGINEERING COLLEGE AT LONARA MAHABALA RITHI VILLAGE IN THA. BHADRAVATI (Mining Royalty)
Construction of Bridge on Pimpalwadi Shingave Road near Ramesh Salpure Wasti At Pimpalwadi Tal. Rahata, Dist. Ahmednagar
Construction of Bridge on Chinchpur Ijde Jogewadi Road MDR-47 Km 9/600 Tal Pathardi Dist Ahmednagar.
CONSTRUCTION OF BRIDGE ON KHADKI RIVER PISHOR TO GANESHPUR ROAD SH-214 KM 60/900 TQ. KANNAD
Construction of bridge with approach on Chincholi kale to Rajura Road. Ch. 0/500 in Dist. Amravati
Construction of Bridge on Talodhi Mokasa to Nadi Ghat Rural Road in Submerged Area of Chichdoh Barrage
Construction of Bridge on Birwadi Walan Sandoshi Road SH 102 Km 14/600 Tal Mahad Dist Raigad
Construction of Bridge Approach A/c Kan River on Bodgaon Bhongaon Amode Road ODR-26 Tal.Sakri Dist.Dhule
Construction Of Bridge On Nala Near Rashtramata School On Delhi Road For Municipal Council Sillod, Dist. Aurangabad.
Construction of Bridge in Km 3 600 Gunj Malegaon Mohadi Road MDR 41 Tq Mahagaon Dist Yavatmal
Construction Of Bridge on Bole Toli Tardi Road VR-99 Km 0/00 al-Parola Dist- Jalgaon
Construction of Bridge on Kurlod Botoshi Shelampada Road Major District Road No.12, Taluka- Mokhada, District-Palghar.
Construction of bridge on Nandurghat Fakrabad Dongarewadi road MDR-40 Km. 12/00 Tq. Kaij Dist. Beed
Construction of Bridge cum Bandhara on Gandhari River on VR 164 At Nate Tal. Mahad Dist Raigad
Construction of Bridge on MDR 83 to Dhotane Panzandev Dhaner Road ODR 149 Tal Nandgaon Dist Nashik
Construction of Bridge Across River Mula on Kauthe Kd to Kauthe Bk Road, Tal. Sangamner, Dist. Ahmednagar
Construction of Bridge Cum Bandhara at Hirdamali. and K.T.Weir at Hirdamali Taluka. Goregaon Dist Gondia.(2 Works )
Construction of Bridge On Canal Within Pen Nagarparishad Boundary on Bypass Road (Ring Road At CH 2070)
Construction of Bridge on Kharwad to Mod Road VR-25 Near Village Kharwad Tal. Taloda Dist. Nandurbar
Construction of Bridge on Jinti Phaltan Giravi Road MDR-10 Km 12/600, Tal-Phaltan, Dist-Satara.
CONSTRUCTION OF BRIDGE CUM BANDHARA NO.2 AT ARDHAWAN TQ.ZARI DIST. YAVATMAL AND ALL ITS APPURTENT WORKS
Construction of bridge on the road from Sonya Maruti to Public Toilet in ward no 1 Barshi.
Construction of Bridge on road From Washi Golegaon Isrup Khanapur road at ch 9/250 Block Washi
CONSTRUCTION OF BRIDGE AT CH 25M ON TAIL CHANNEL OF M.I. PROJECT OTAV TAL KANKAVLI DIST SINDHUDURG
Construction of Bridge On owaliye Danoli Devasu Road VR 19 at 0/500 Tal-Sawantwadi Dist- Sindhudurg
E Tend No. 34 Construction of Bridge and deepening of Nala at Shahanur Sankul in Narnala Range
Construction of Bridge on Chowkul Ghonsatwadi Road VR 48 at Km 0/550 Tal Sawantwadi Dist Sindhudurg
CONSTRUCTION OF BRIDGE ON KONDHI APPROACH ROAD TQ.KELAPUR V.R.106 TOTAL LENGTH 2.00 KM IN 0/700
CONSTRUCTION OF BRIDGE CUM VIDARBH TYPE WEIR NO. 2 AT MAUJE IMAMPUR TALUKA CHANDUR BAZAR , DISTRICT AMRAVATI
CONSTRUCTION OF BRIDGE OVER NALA, NEAR BARAMATI WATER TREATMENT PLANT, FOR BARAMATI MUNICIPAL COUNCIL, BARAMATI, DIST. - PUNE.
Construction of Bridge on VR 86 Belura to Nimkhed at Km.2/00 Tq.Nandura Dist.Buldhana. Under Nabard
Construction of Bridge on Kuruswade Sutare Amali ODR-24 on Kan River Near Sutare Village Tal.Sakri Dist.Dhule
CONSTRUCTION OF BRIDGE CUM BANDHARA NO.1 AT ARDHAWAN TQ.ZARI DIST. YAVATMAL AND ALL ITS APPURTENT WORKS
Construction Of Bridge Approaches on Sonori Jalanapur Ridhpur Road ODR16 at Ch 5/300 Tq Chandur Baza
Manufacturing, transportation and Erection of 16 m long foot bridge - 2 Nos on Neera Deoghar Right Bank Canal at km 58 and 59 Ch. No. 57/450 and Ch.No. 58/380 including spare,transport and labour
Restoring Embankment Due to Heavy Rainfall at ch 41120 to 41310 m and Construction of Foot Bridge at ch 41670 m Of Banda Branch Canal in km 42 Of Tillari Irrigation Project Tal Dodamarg Dist Sindhudurg.
Construction of Submersible Bridge across Harna River at Km.0/200 on Musti Arli Road O.D.R.83 Near Village Musti Tal-South Solapur.Dist-Solapur (With Contractors Own Design and Drawings).
Construction of submersible bridge with approaches in km 7/600 on MDR-79 from NH-753 E to Bhadgani Pimpalkhuta bk.Belura joining to SH-277 road tq.Malkapur and Nandura dist.Buldana.
Repair of Bridge on road Panhala Vagbil Vathar Hathanangle Ichalkaranji Shiradwad Shivnawadi to State Broder SH -192 Km. 63/100 (Panchganga new Bridge)
Repair of Bridge on Road Panhala Waghbil Vathar Hatkangale Ichalkaranji Shiradwad Shivnakwadi to State Border SH 192 Km. 63/700 (Panchganga Old Bridge)
Repair of bridge on road Panhala Vagbil Vathar Hathkanagle Ichalkaranji Shirwad Shivnakwadi to State Border SH -192 Km. 63/700 (Panchganga old Bridge)
FDR to Wai Jambhali Washivali Vasole Akoshi Vaygaon Balkvadi Phata Ulumb Jor Dhangarwada Katratwasti Road MDR-24 Km 5/100 and 5/250 (Construction of Minor Bridge With Approach road at Damaged C.D.Work) Tal.Wai. Dist.Satara.
Consultancy Services for Detailed Project Report Preparation for Widening of Existing ROB in Udgir City Portion stretch Length 0.710 km of NH 50 and Widening of Existing ROB in Udgir City Portion stretch Length 0.600 km of NH 63 in state of Maharasht
Appointment of contractor for Pre-FOB activities and Custom Clearance at JNPT for M/s Finchaa Sugar Factory, Ethiopia.
Appointment of contractor for Pre-FOB activities and Custom Clearance at JNPT for M/s Mombasa Cement ltd, Kenya.