Loading…
Loading…
8,720 results • Best match
Instrumentation of track bridge continuing LWR based on Rail Structure Interaction (RSI) analysis of track bridges No. 333 DN of Mumbai Division of western Railway
Providing earthwork to 2R, 3R, 4R and 5R Subminors, CC lining, repairs to road bridges and outlets of DY 45 of Palkhed Left Bank Canal
Construction of Bridge on Ghanegaon Lakhane Bendrepada Kandhane Jalku Manke Sayane Khu. Road to N.H. 3 Connected to MDR-157, Ch. 20/00, Tal. Malegaon, Dist. Nashik (Jalku Village)
CONSTRUCTION OF BRIDGE IN KM. 1/800 ON A)KOLONA TO GHODEGAON ROAD BRIDGE IN KM. 6/700 ON B) VIJAYGOPAL SAWANGI (Y) TO NANDGAON ROAD ROAD AND CONSTROCTION
Construction of Bridge on Ghanegaon Lakhane Bendrepada Kandhane Jalku Manke Sayane Khu. Road to N.H. 3 Connected to MDR-157, Ch. 9/00, Tal. Malegaon, Dist. Nashik (Jalku Village)
Construction Of Bridge at K.M. 9/400 With Improvement of Road On NH-3 To Lonwade Dasane Vajirkhede Malegaon Camp Road MDR-137, Tal. Malegaon, Dist. Nashik (Near Canal)
CONSTRUCTION OF BRIDGE ON BHADBHIDI GHOT REGADI KASANSUR GATTA KOTHI DODHUR HINDUR AREWADA BHAMRAGAD TO KAWANDE STATE BORDER ROAD S.H.380 IN CH. NO. 117.800 TQ. BHAMRAGAD DIST. GADCHIROLI.
Palkhed Left Bank Canal Dy. No- 9 and 12 Earthwork, repairs to structure, Lining, Dy 5 to 12 road bridges repairs and executing other allied works
Construction of Approaches for Railway Over Bridge (ROB) on Gujrat Satate Border Sawalade Shanimandal Chhadwel Satana Chandwad Lasalgaon Vinchur Sawalivihir Road SH.07 (Near Lasalgaon) at Km. 192/170 Tal. Niphad Dist. Nashik
Carrying out Detailed Survey and Preperation of DPR for Construction of Approaches to Halwal ROB including Viaduct on Wagade Halwal Shrirwal Kalsuli Road in KM 0/200 MDR-26 Tal-Kankavali, Dist- Sindhudurg.
Cleaning of soil/rubbish/slush from Ulwe Recourse Channel near the bridges on Amra Marg and bridge for EHVT line across URC at Vahal under NMIA Project.
TAPERED RUBBER PLUGS MINIMUM DIAMETER 20 MM, MAXIMUM DIAMETER 28MM AND LENGTH 30 MM. MOC: NATURAL RUB, TAPERED RUBBER PLUGS MINIMUM DIAMETER 8MM, MAXIMUM DIAMETER 20MM AND LENGTH 30 MM. THE PLUG SHOULD B
Improvement to SH-26 Chaukatpade Jeur Sakuri (Ni) Road to MDR-83 (MDR-134) K.M. 04/500 to 11/00 and Construction of Bridge at 05/600, Tal. Malegaon, Dist. Nashik.
Improvements to MSH-3 Pohali Dhondabe Nagshewadi Khadki Wanjulpada Shinde (Digar) MDR-7 Km. 0/00 to 17/00 including drainage work and miscellaneous bridge work, Tal. Surgana, Dist. Nashik
Construction of ROB in lieu of L.C. No. 55A in the section between Vangaon and Dahanu Road stations in connection with Quadrupling of Virar Dahanu Road Project in Mumbai Central Division of Western Railway.
ZPBEED/WD2/DPDC/173/2025-26
Request for Proposal for Detailed Engineering Design and Project Management Consultancy for Construction of foot over bridges and pedestrian underpasses along Metro Line 4 4A and 9 Packge2
Request for Proposal for Detailed Engineering Design and Project Management Consultancy for Construction of foot over bridges and pedestrian underpasses along Metro Line 4 4A and 9 Packge1
Improvement of Virgaon Vatar Vinchure Talvade Bhavade Road, MDR-188, Km. 0/00 to 23/500 Road Widening, Construction of Bridge and Constructing Protection Wall at Various Places, Tal. Satana, Dist. Nashik
FDR to NH 65 DD Rajewadi Junction to Varandha Ghat from Km 60 to 81 600 Removal land slides and repairing to Flood Damage Bridges Dust Raigad 2nd Call
Flood Damage Repairs to NH 166F Mahad Raigad Fort Hirkaniwadi connector 950m Jijaumatl Samadhi connector 1213mTotal Length 25.609km removal land slides and repairing to flood damage Bridges and Road
Electrical Work For : (A) Construction of cover shed Improvement of drainage system, Cross drainage and Repairing of Approach road along with cover shed at LHS TT-19 under the jurisdiction of ADEN/TMR. (B) Proposed construction of cover shed with ... at RUB -TT-06 ...
Construction and vertical extension of RUBs approach walls, drains along the RUB, landscaping, finishing and painting, gratings by structural steel and Hume pipes laying as directed in the SS1 section by the Engineer, Employer and additionally direct
Handling, Transport and Other Mining Services - Percentage quote based - Dust suppression through truck mounted mobile water tanker with pump enabled mechanical water spraying arrangement from Starting point of RUB to TRS of SILO MKD III under Umrer ..
Construction of Station Buildings, service Buildings, Platforms, FOBs, Quarters, extension of FOBs, platforms, earthwork for formation and bridges for Railway track in connection with quadrupling of Virar Dahanu Road section
CSMT- Yard remodeling of CSMT Yard in connection with extension of PF 4&5 for 15 car Suburban Trains. (IRPSM ID: 01.02.19.25.3.51.020) (UMBRELLA WORK) (a)Platform work for extension work related of 4 & 5 for accommodating 15 ICF PF suburban CSMT. ... New FOB work ...
Repair and reconditioning of Emergency Gate 01 No and its hoist, Service Gate 02 No. and its hoist, Fabrication Erection of CRCA Cabin 01 No for Emergency Gate Hoist, approach bridge repair and reconditioning at Haranbari Dam Nashik
Improvement to Palsan Mhaismal Fata to Barhe Modhalpada to Peth Taluka Border SH-23 Km. 52/500 to 54/600 including Drainage Work and Miscellaneous Bridge Works, Tal. Surgana, Dist. Nashik (Actual Working Ch. Km. 54/600 to 57/600)
Custom Bid for Services - Hiring of services for transportation, custom clearance and liasoning work for dispatch of various classified ammunition and its component upto Vishakhapatnam Port for onward shipping to various countries on FOB Basis Similar Category Handling and Transport on Lumpsum Basis
(1) Signal & Telecom work in connection with construction of ROB in lieu of: a) Manned LC No. GJ-13 at Km 1018/2-3 between GONDIA-BALAGHAT section, b) Manned LC No. TT-20 at Km 1075/3 on TMR-TRDI line, c) manned LC No. TT-26 at Km 1071/12 on TMR-TRDI ... of ROB in ...
(1) Signal & Telecom work in connection with construction of ROB in lieu of: a) Manned LC No. GJ-13 at Km 1018/2-3 between GONDIA-BALAGHAT section, b) Manned LC No. TT-20 at Km 1075/3 on TMR-TRDI line, c) manned LC No. TT-26 at Km 1071/12 on TMR-TRDI ... of ROB in ...
Plain Copier Paper, Index card files, Folders-file cover, Diaries-printed-plain- register, Ball Point Pen, Gel Pen, Cleaning Duster, floor cleaners, toilet cleaners liquid, Antiseptic/Antimicrobial Hand Wash, Alcohol Based Hand Rub/Hand Sanitizer, Envelopes, Customised Envelopes
Empanelment of Project Management Consultancy for Preparation of Detailed Project Report, Estimates, Design and Supervision for Road, Buildings, Bridges, Garden, Landscape, Electrical Works and Other Development Works for Kalwan Nagarpanchayat Kalwan
Construction of Bridge at Ch31/380 on Mahiravani (SH.37) to Gangavarhe Sawargaon Goverdhan Chandshi Matori Dari Manoli Wadgaon Dabhadgaon Naikwadi Pardhipada Ladchi Road MDR.176 Km. 19/800 to 33/700 Tal. Dist. Nashik.
3054-2419
Construction of Bridge on MDR-33 Pimpalkhuta to Haralkhed Road at ch.0/510 2.On NH-548C to Somthana Road at ch. 1/120 and On SH-274 to Borala Road at ch. 5/100
Construction of Bridge Across Parsul River on MDR-54 to Kharipada Phulenagar Umrane Connecting to SH-20 Road MDR-130 at Km. 14/00 in Umrane Village along with Outer approach Road, Tal. Deola, Dist. Nashik
CONSTRUCTION OF L.S.B IN KM. 1/915 ACROSS JELKHAS NALLA ON MAHARAJGUDA TO JANGUDEVI ROAD (VR-52 ) IN TALUKA JIWATI DISTRICT CHANDRAPUR
CONSTRUCTION OF L.S.B. IN KM. 4/585 ON NAGRALA - RAIPUR - KHADKI ROAD ( V.R. - 4 ) IN TA. JIWATI AND DISTT. CHANDRAPUR (2ND CALL)
Construction of Bridge No. 106 and 114 A in the existing operational lines in the Section between the stations Saphale and Kelve Road on Mumbai suburban section of Western Railway by box pushing technique with relieving girders.
CONSTRUCTION OF L.S.B.IN KM.1/285 ACROSS JELKHAS NALLA ON MDR-14 (GUDSHELA ) TO JODHANGHAT ROAD ( V.R. - 44 ) IN TA. JIWATI DISTT. CHANDRAPUR
CONSTRUCTION OF L.S.B. IN KM. 0/100 ON WADIGUDA APPROCH ROAD ACROSS LAMDI NALLA ( V.R. - 26 ) IN TA. JIWATI AND DISTT. CHANDRAPUR (2ND CALL)
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Outstation 24*7
1) Shegaon - Proposed extension of High Level platform No 3 (Up side) from 16 coaches to 24 coaches Shegaon railway station.(PID: 01.01.53.25.3.50.036). 2) Provision of Divyangjan Amenities at Achegaon, Bodwad, Varangaon & khamkhed in the ... COP, FOB , ...
Construction of Station Buildings, service Buildings, Platforms, FOBs, Quarters, extension of FOBs, platforms, earthwork for formation and bridges for Railway track in connection with quadrupling of Virar Dahanu Road section of balance 2 Lots
100268192 ITEM 10 M0513813023 GASKET, RJ: SI RBR, 4KSC, 248X220X33MM, 100268192 ITEM 20 M0513813020 GASKET, RJ: SI RBR, 5KSC, 298X270X33, 250NB, 100268192 ITEM 30 M0513813021 GASKET, RJ: SI RBR, 5KSC, 348X322X33, 300NB, 100268192 ITEM 40 ... SILICON RUB ,
KAGAL HATKANANGALE and 5 STAR INDUSTRIAL AREA M and R to water supply scheme Removing 150 mm dia CI pipeline passing through G Block for construction of bridge on Dudhganga Canal and laying temporary 160 mm dia HDPE pipe
1. Extension of Barrel Length of BR NO 231/2,231/3,231/4 and 232/1(04 no brige)on Yavat on PA-DD)section under ADEN DD in connection with the work of Yevat: Construction of extended loop in UP & DN direction at Yavat station between Pune - Daund ... of bridges ) ...
Construction of Bridge on MDR-02 (Wagholi kh.) to Adoli road . At Ch. 3/840 and Ch. 9/130 Tq. Washim and MDR-06 ( Mutha) to Shirpur ( MDR-05) Road At Ch. 0/293 and Ch. 2/075 Tq. Malegaon
200132138 Supply, Erection, installation commissioning and Testing andstamping of 2 no of 100MT weigh bridges including Civil Works withprovision of 02 Year Comprehensive maintenance contract at Fly ash siloarea and Ash dyke area of NTPC Mouda