Loading…
Loading…
2,411 results • Best match
Widening from Single Lane to Intermediat lane Strengthening Impts Impt to Ridg Quality inclg Reconstrtion of Minor Bridgculvert and Reconstruction of Culvert in Government road of Nanguneri H Cand M sub divisionTNV 24
Wdg from 2L to 4L 3Lto 4L and Steg of Erode Dharapuram Road Incl Realignment and Constn of Bridge Wdg of Minor bridge at Km 32by4 Wdg, Constn and reconstn of Culverts Rtg wall providing centre median paver block Junction Impts and inclLA SH83A TPR068
Widng 2lane to 2lane with Paved shoulders and Streng at Km 11.0 to 17.0 19.0 to 23.0 27.0 to 28.8 of Sathy Athani Bhavani Rd SH82. Reconstn of Box Culverts Const of Drains and Const of Minor Bridge at Km 22.4 inlieuofexisting piped causewayCBE 071
Widening from Single lane to Two lane and Strengthening at km 3/6 6/6 of Kalvelipatti-A.Pudupatti road including Reconstruction of Culverts at Km 4/2(ii), 4/6, 5/8, 6/6 and Widening of Minor Bridge at Km 5/10 MDU 076
Wdg 3Lto4L and Stegn at km 5by210by500 of Tirupur Vijayamangalam road incl constn of culvert at km 6by2 Reconstn of culvert at km 9by6 Wdg of Minor bridge at km 8by8 Constn of drain at km 6by06by4 7by88by6 and Providing Center Median TPR 046
Widening, Improvements, urban Improvements, Construction of Retaining wall , Center Median ,Drain works, providing paver block and widening the bridge works in the Government roads of Uthamapalayam Highways Cand M SubDivisionMDU065
Construction of Departure Concourse and utilization of same temporarily as FOB connecting platforms with stairway including Residual Engineering procurement for the project of Major Upgradation Redevelopment of Katpadi Junction Railway Station Vel
Construction of ROB at Km.203 2 of VCC road in lieu of existing LC 187 sub work of Approaches to Limited Use Subway on Three Road side
Wdg from Two Lane to Four Lane and Impts of Virudhachalam - Jayankondam -Madhanathur road at Km 14/8 - 21/0 incl Wdg of Minor bridge at km 19/10 Constn of Drain Constn of Rtg wall Constn of Centre Median and Wdg Reconstn of CulvertsVPM-112
Widening from Four Lane to Six Lane and Strengthening at km 30/0 - 32/5 of Chennai - Mamallapuram Road (via) Thiruporur (Rajiv Gandhi Salai) including widening of minor bridge at km 30/10 and reconstruction of box culvert at km 30/8, 31/8, 31/10 and
Wedg from 2L to 4L and Steg at km 47by2 48by2 50by6 53by0 54by2 55by8 of Erode Karur road incl Wedg of Minor Bridge at Km 48/2, Reconstn of Box Culvert at Km 47/8, Constn of well protective wall at Km 45by 2LS SH84
Wdg from two Lane to four Lane and Impts of Virudhachalam - Jayankondam - Madhanathur road at Km21/0 - 27/6-SH-140 incl Reconst of Minor bridge at km 26/10,Const of Drain,Const of Rtg wall,Const of Centre Median and Wdg of culverts-VPM109
Widening from SL to IL and Strengthening at km 2/6 - 4/0 of Vellanur -Senganthi Road including reconstruction of box culverts at km 2/8 (i), (ii), 3/2 and construction of Box culvert at km 3/8 and reconstruction of Minor Bridge ... TRY 25
Strengthening at Km 2/100-3/200 of Madurai - Thondi road (SH 33) including Widening of Minor bridge at Km 2/10, Widening of approach road, Widening of culvert at km 2/10 (i), (ii), Construction of retaining wall,load bearing drain at km 3/2
surgical isolation or surgical masks, Disinfectant Fluids, Phenolic Type as per IS:1061, toilet cleaners liquid, urinal cubes-Deodorizer Block, floor cleaners, Air Freshener, Alcohol Based Hand Rub/Hand Sanitizer
Widening from IL to Two Lane Strengthening Impnts Impts to Riding Quality Coion of Minor Bri Reconction of box culvert and Construction of Drain of Govt Roads in Palayamkottai H C and M Sub Division TNV 22
C18M26R294 9155013091 ON/OFF POWER SWITCH BOARD, GC8890, 9155013221 AC BOARD ASSEMBLY, 8890 P/N G3450-61820, 9155013231 GE POWER SUPPLY 800W, P/N G3450-80250, 9155013241 CABLE, POWER SWITCH TO FOB HAMESS, 8890
Widening from Two Lane to Two Lane Paved Shoulder and Streng widening from IL to TL and Streng Constn and Widening of Culverts and widening of RCC bridge in the Government roads of Anaimalai H C and M Sub Division CBE 045
Wdg from Two Lane to Four Lane and Stg at Km2/6-3/6 of Vridhachalam Tholudur road (SH-141) incl Wdg of Minor Bridge at Km 3/2, Const of Center Median, Rtg Wall, Drain, Paver Block at Builtup area, Improving Junctions and Buslay bye-VPM-120
Wdng from IL to DL and Strhng at Km2.0to6.0 of Vettaikaranpudur Semanampathi incl reconst of Culvert at Km 2.2 3.4 3.6 3.8 5.2 5.6 5.10 Wdng of Culvert at Km2.8 and Reconstn of Minor Bridge at Km.4.4 incl constn of Protective wall at Km 4.6 CBE 043
Construction of Bridge across Chinnakarai Odai along Dharapuram to Pollachi road to Chinnaputhur road in Dharapuram Block of Tiruppur District under STATE SPECIAL ASSISTANCE/PHASE I/ BRIDGE/2025-26.
Hiring 2 Nos of Tata Indica or equivalent vehicle (Ac) for Executive Engineers (BRIDGES) for the use of Inspection purpose for a period of 10 months.
Widening from Two Lane to Four Lane and Strengthening at Km 15 0 18 4 of Madurai Alagarkoil Melur Road including Widening of Minor Bridge at Km 15 2 Reconstruction of Culverts at Km 15 4 16 10 Construction of Retaining Wall at Km 16 525 16 750 16 1
Widening from IL to 2L and Strengthening at km 25by6to 29by6 of Natchikulam Sempatti Road including ReConstruction of Culvert at km 2by2 26 by 8 27 by 6 27 by 10 28 by 2 28 by 4 28 by 10 widening minor bridge at km 26 by 4 SH285 MDU022
Widening from Two Lane to Four Lane and Improvements at Km 7by2 to 14by615 of Erode Outer Ring Road including CD Works Retaining Wall and Centre Median (Excluding ROB of 1.00Km length)
Monthly Basis Cab & Taxi Hiring Services - SUV; 2600 KM x 312 HRS; Outstation
Construction of ROB at Km 373 6 of Nagapattinam Gudalur Mysore in lieu of existing LC No 10 at Railway Km 25 6 7 in between Periyanaickenpalayam and Karamadai Railway stations Balance works
Sub Work Construction of ROB at Km.0/6 of Bretts Road in lieu of existing LC.No.185 at Railway Km.190/400-500 in between Salem Market and Salem Town Railway Stations.
Forming link Road and Construction of Bridge across Buckingham Canal connecting Rajiv Gandhi Salai and ECR Km 0.0 to Km 0.860 including LA for entire link road from OMR to ECR
Wdg from 2L with Paved Shoulder to 4L and Steg at Km 19 164 to 24 4 25 4 to 29 0 and 34 2 to 37 0 of Erode Perundurai Kangayam Road SH 96 Incl Wdg of Minor Bridge Culvert Wdg Reconstn Constn of Culvert Buslay bye and Junction Impts TPR 096
Widening from Single lane to Two lane and Strengthening at km 0/0 3/6 of Kalvelipatti-A.Pudupatti road including Reconstruction of Culverts at Km 0/4, 1/6, 2/8, 2/10, 3/6(i), Widening of Minor bridge at Km 0/10(iii) and Widening of Culvert at Km 0/10
Impts at km 0 0 4 0 of Dhalavaipuram Inamkovilpatti road including Consion of PB along both sides of road at km 0 8 1 6 Recoion of Minor bridge in lieu of piped causeway at km 1 10 2 6 Recontion of Pipe culvert at km 3 8 3 8 TNV85
Widening from Intermediate Lane to Four Lane and Strengthening at km 6/2 - 12/2 of Gummidipoondi-Madarpakkam road including Widening of Minor Bridge at Km 8/2 and Reconstruction of Box culverts at km 6/10, 7/2, 7/4, 7/6, 7/10(i)(ii)(iii), 8/2, 8/4(i)
Hiring 2 Nos of Tata Indica or equivalent vehicle (A/c) for Executive Engineers, Bridges department for the use of inspection purpose for a period of 10 months
Comprehensive Restoration and Conservation of Pallikaranai Marshland by Removal of Impediments, Clearing waterways, Eradicating Aquatic and Terrestrial weeds, Forming Protective Bunds, Construction of Walk paths and Cross bridges
PTFE SHEET 1000X2000X0 dot 5 MM THICK, PTFE SHEET 1000X2000X1 MM THICK, PTFE SHEET 1000X2000X2 MM THICK, PTFE SHEET 1000X2000X3 MM THICK, PTFE SHEET 1000X2000X5 MM THICK, NEOPRENE RUB SHEET 1000X2000X3 MM THICK, NEOPRENE RUB SHEET 1000X2000X5 MM THICK, METALLIC CAF SHEET 2000X1500X2 MM THK, METALLIC CAF SHEET 2000X1500X3 MM THK, METALLIC CAF SHEET 2000X1500X5 MM THK, NON METALLIC CAF SHEET 2000X1500X2 MM TK, NON METALLIC CAF SHEET 2000X1500X3 MM TK, NON METALLIC CAF SHEET 2000X1500X5 MM TK
Construction of Bridge across Athiyuthu river at km 7/55 of Bodi-Valasadurai road to Athiyuthu at Anaikaraipatti panchayat in Bodinaickanur Block of Theni District under NABARD RIDF-XXVII(2021-22)Tranche.
POTENTIOMETER, ITEM NUMBER: WDDD35D-4 FOB SHANGHAI SAJ CODE NO: 50-952671, OUTLET CONTROL VALVE FOR F35 DYNAMOMETER. MAKE: SAJ, SAJ CODE: 939705, DIO CARD FOR DDCV CONTROLLER CODE NO. 978049, DCU CARD FOR DDC CONTROLLER CODE NO. 978048
Construction of ROB at km 23/6 of Srivilliputhur Sivakasi- Virudhunagar - Aruppukottai Thiruchuli Narikudi Parthibanoor Road(SH42) In Lieu of Existing LC 424 at Railway Km 559/700-800 in Between Sivakasi and Thiruthangal Railway
Construction of ROB at Km 40 8 of Sankari Mecheri road via Edapadi SH 220 at Railway Km 23 800 900 in lieu of existing LC No 18 in between Omalur and Mecheri Railway stations
Construction of ROB at Km 373 6 of Nagapattinam Gudalur Mysore in lieu of existing LC No 10 at Railway Km 25 6 7 in between Periyanaickenpalayam and Karamadai Railway stations Sub Work Junction Improvement
Signal and Telecommunication arrangement in connection with Sr.DEN/S/MDU jurisdiction:- (1) Construction of 7 Nos of New RCB bridges in TEN-TCN section (2)Pro.rebuilding of exg 4 RCC slab / RCC box bridge no. T18 UP, 1692A, 1693 UP & 81 into 25t loading standard (3) Pro.rebuilding of exg 6 RCC slab / RCC box bridge No. 1677 DN, 1678 DN, 1679 DN, 1681 DN, 1682 DN, 1689 up into 25t loading standard in MEJ-TEN section
(19 UG Stations,13 Elevated Stations,Koyambedu Depot and Admin),Ph-1Extn(2 UG stations,6 Elev Stns and Wimco Nagar Depot),All Viaduct/Tunnel ,Adjacent Roads/Streets,Nearby Important Catchment area,SR Railway Stations,Subways/FOB,bus Stands/Stops etc
Replacing of Damaged AC pipes by Railway over Bridge Construction of Storm Water drain on both sides and road widening work to HDPE Pipes at Kattur Road side
Replacing of Damaged AC pipes by Railway over Bridge Construction of Storm Water drain on both sides and road widening work to HDPE Pipes at Minjur Road side
Construction Of Box Culvert for the work of Construction of ROB at Km 0.6 of Thaneerpandal road in lieu of existing LC 6 at Railway Km 6.15 to 17 in between Singanallur to Peelamedu Railway Stations
BT work PCC RCC Retaining wall Road Furniture
Providing Approach Road and Construction of Box Culverts in Construction of Bridge Across Noyyal River Connecting Km 3 by 2 of Tirupur Vijayamangalam Road and Km 1 by 2 of Tirupur Kangeyam Road SH 172
Construction of ROB at Km 1/4 of Tiruppur Somanur road to Chikkanna College road in lieu of existing Arch Bridge No.29 at Railway km 445/19-21 in between Tiruppur and Vanjipalayam Railway Stations Balance works
Preparation of Detailed Project Report for the work of Construction of ROB at Km 57 of Abandoned NH 210 road SHU in lieu of existing LC No 385 at Railway Km 463 between Pudukkottai and Namanasamudram Railway stations