Loading…
Loading…
192 results • Best match
Demolition of un-reinforced cement concrete drain, Providing, Laying, Jointing and Testing of HDPE pipe from RD 00 to 0/146 for Providing grey water facility for Mohalla Kahiwal Harizan Basti Panjawar in Tehsil Haroli Distt.Una (HP) Under CRF
Dismantling Demolishing Work, Retrofitting work, finishing work and sanitary work (Unit I)
Repair of plaster, distempering, UV fiberglass plastic sheet Demolishing brick Armoury block
Demolition , plaster, brick work, prepainted sheet, steel work etc.
Retrofitting and source level augmentation of various left out habitations under JJM 3rd phase of Jal Shakti sub-Division Swarghat and Bassi in Tehsil Sh. Naina Devi Ji District Bilaspur. JSV Sub-Division Swarghat (SH Demolition of old pump house, C
Construction of FIS Luharda Samardi in Tehsil Sadar District Bilaspur (SH Demolition, repair and removal of slips of existing main channel, Reconstruction of existing damaged main channel and laying of MSERW pipe 400mm dia, C/o Retaining walls from R
Dismantling Demolishing Work, Retrofitting work, finishing work and sanitary work (Unit 1 2)
Demolition and restoration of road at various locations in Ropa
SH- Civil work, water supply, sanitary installation and demolition work
Demolition and restoration of road at various locations in Rasmain
Demolition of PCC work and P/F roof work etc
Estimate for demolition and reconstruction of damaged retaining walls, damaged by washing away of land due to heavy rain at Tower No 134 of 132 kV D/C Transmission Line from Larji to Kangoo under Electrical System Division HPSEBL Bilaspur H P
Sh Dismantling Demolishing Work Retrofitting workfinishing work and sanitary work (Unit I23 and 4)
Installation, construction and demolition of partition wall, panelling, flooring, doors & window
Demolition of existing sedimentation tank and C/O RCC Sedimentation tank
Demolishing of floor, providing PVC florring, ceramic tile steel work, water supply and sanitary installation
Dismantling , Demolishing Work, Retrofitting work, finishing work and sanitary work (Unit I,2,3 and 4)
Removal of slips, demolishing stone rubble masonry and demolishing cement concrete from back side of pump House and entire complex at Zone No.- 8 and Circumfrential Butt Welding in common header and Rising Main. PDNA No.- 5482
Special repair to Bldg No T-13 with toilets and bathrooms at 27/4 Camp and Provn of certain sanctioned works and Demolition of Bldg No. 31C, 32C, T-5 and T-40/B at Yol Cantt under AGE B/R-I of GE (KH) YOL
(Sub Head - Demolishing work painting work roofing WS and SI and Aluminum work etc. under Deposit)
SH Providing and laying spartic ceramic, precast terrazo tile demolition of floor etc
(SH-Providing and fixing prepaitned sheet tile demolition AND minor repair works etc)
Demolition of existing damaged G.S sheet roofing of silt ejactor shed at jateon.
Demolition of lime terracing and CC work tile work, painting and wood work.
Demolition of RCC manhole chamber and Providing and supplying of SFRC Manhole Cover
Construction of PCC work in 1.5.10 RCC work in 1.1.50.3 and Demolishing etc. ) Under DMFT Deposit work.
Demolition and C/o cement concrete pavement from RD 0/435 to 0/454
Demolition of RCC work, floor tiles, steel work, cement concrete and painting etc. DMFT
( SH- Demolition of existing damaged slow sand filter bed units and C/O Water treatment Plant )
Demolition RCC work, Providing and laying RCC work, flooring, Plastering, Distempering and W.S. and S.I. etc.)
SH Demolishing existing boundary wall and Reconstruction of Boundary wall Repainting different Building Blocks Construction of Steel Stair Case etcetera
SH- Construction of new 8.00 mtrs span slab culvert at km. 7/660 and demolishing of old damaged slab culvert
Demolition of damage filter bed and RCC C/Tank, C/O filter bed and RCC C/Tank
Demolition of Non- functional RCC Sedimentation tank and CO New RCC Sedimentation tank of 5000 ltrs capacity
(SW- Demolishing CC and Brick work, P/L Tile flooring, Wire gauge shutter, Distempering, Painting and CC flooring in back side)
Demolition work providing and lay R.C.C 1 1 5 3 painting work Brickwork and Plaster etc) Deposit work
SH Demolition and C/o retaining wall in RR masonry with cement mortar at RD0/675 to 0/701
Demolition of Existing Path Dismantling, Shifting and Relaying of various dia in village Dungi under Jal Shakti Section Kanjian
SH- Demolition of Existing C.C. Pavement and 900MM Dia Hume Pipe Culvert at KM. 3/950) (Under O.F.C. Head)
(SH Jacketing of main storage tank 28500 litr capacity at village Selag and demolition and casting of the foundations)
SH Demolition of Buldged B.Wall Damaged PCC structure parapet wall etc. and C.O B/Wall Parapet wall in sports complex
Demolition/ Dismantling of old unsafe RCC slab and providing roof truss over rain shed at RD 4/950) Under OFC
Construction of R/Wall Path bridge at Gamber Rampur to Katal Kayar link road (SH Demolishing RCC Work P/F Chequered Plate etc.)DC Deposit
Demolition of RCC manhol chamber and Providing and Fixing of SFRC Manhole cover at various location in sewerage section Mandi Town
(SH. Demolition, reconstruction of RCC slab 1st Floor JSV Sub-Division Bassi and white washing/painting of the Sub-Divisional building).
Demolishing of Existing RCC slab Culvert and P/L of new RC slab Culvert in front of HPSEBL SDO Office Chadhiar (Deposit work SDF/2025/767)
Demolishing of brick walls for creating appropriate space along with Sensor Door and Electrical work to set up Back up Joint Control Centre at Dehan (Patti)
Estimate for Demolition and reconstruction of damaged cable trench covers in 220 132KV Substation at Bagga under ES division HPSEBL Bilaspur H.P.
(SH Demolition of boundary wall and C/O new boundary wall at LWSS Billanwali 1 in JSV section Baddi) Job no. 2
(SH Demolition of boundary wall and C O new boundary wall at LWSS Billanwali 1 in JSV section Baddi) Job no. 1