Loading…
Loading…
1,265 results • Best match
Ordinary Portland Cement, Fine River Sand, Pulverised sand, Wire Nails, Marine plywood, stone aggregate
Construction of CC drain , CC toe wall cum drain and culvert wherever necessary on the road side from ATR to Lall Pahad Road(Balance Work.
Construction of CC Drains for a length of 60.00 mtr near Kanthari Amman Temple Ch 674.00 mtr at Burmanallah Rural Road under SDIII CDIII APWD, Prothrapur. Sub Work Renovation of foot bridge at Beodnabad
AR and MO Rural Road under SD-I, CD-I, APWD, Rangat during the year 2025-26. SW - Construction of CC drain and footpath near Medical Junction to CMOs Qtr resident in rural road under Medical Section SD-I, CD-I, APWD, Rangat.
1. Construction of CC Road with drain from Shri. Rafique house to Shri. Gopal house at ward No.02 under Gram Panchayat Calicut. 2. Providing of cover slab including parking place road side near Karupuswamy Temple at Calicut W.No.05 under GP Calicut
A/R M/O District Road under Sub Division No.I, NACD, APWD, Mayabunder. SW- Removal of damaged wall and reconstruction of RCC wall and CC drain near house of Shri. Ragunathan Baraik at Ganesh Tikrey under Sub Division No.I, NACD, APWD, Mayabunder.
A/R M/O Rural Road under Sub - Division No. - II, NACD, APWD, Mayabunder during 2023-24.SW-Providing and laying of Hectometer, Kilometer stone and disilting of longitudinal and cross drain of newly improved road under Sub - Division No. -II, Tugapur
CERTAIN REPAIRS TO COMPOUND WALL. GATE, GRILLS, GRATINGS, CHAIN LINK FENCING, DRAIN, PATH AND CERTAIN PETTY REPAIRS TO MD ACCN AT TRV, MT, CSD COMPLEX, SPECTRUM AND LIVING SAILORS ACCN OF COAST GUARD UNDER AGE B/R-II AT GE HADDO PORT BLAIR
1. Repair and Maintenance of CC Road from Y. Tulsamma house to Chandra Sekhar house at W. No. 07 under Gram Panchayat Shore Point. 2. Repair and Maintenance of CC Drain with Slab Cover from Thangaraj house (main road) to Narayanswamy (2nd Call)
Construction of Gabion Structure and RCC retaining wall cum drain 2 mtrs. Height to protect Police Quarters and approach road at Madhupur under CD, APWD, Diglipur Sw- SITC of 02 Nos. 1.0 Ton Air Conditioner at CCTNS Server Room at Police Station, DP
Repair and Maintenance of Footpath at Shashi house to Manna house at WNo.07 under GP Bambooflat-II. Renovation of Footpath from main road to Prabhakar house at W No. 06 under GP Bambooflat-II. Repair and Maintenance of Footpath cum Drain
Providing Cement Concrete pavement adjacent to road sides an Providing RCC Slab covering over existing drain starting from Old CCS to Lord Shiv Temple Island Bakery to Police Quarter, Near the house of Shri. Kedhar to VIP Road and Metali Book Shop t
1) Construction of CC Footpath from CC Road to Rakhu house at Ward No.WG-04 under Gram Panchayat Kanyapuram. 2) Construction of CC Footpath with drain and cover slab from village road to Zainudeen house at Ward No.WG-4 under Gram Panchayat Kanyapuram
Repair and Maintenance of Footpath with Drain,covering Toe wall and hand railing steps from main road White sand fashion boutique shop Shri. Laxmi Narayan house Shri Raja Rao house Shri Dhanaiah house to Shri Guruma house at Sea Shore Road Fisherm
Re Construction of motorable road with side drain covering slab and M S Grill starting from main road to Kali Mandir House of Smti Shajun Devi Smti Deepika Smti kamli Kumari and Shri Kishor Bheem at School Line in Ward No 15
Repair and Maintenance of CC Footpath CC Drain LMV Road Steps Village Roads at various places under Bambooflat-I Gram Panchayat. Repair and Maintenance of CC Footpath main road to Kader house via Narayan house W. No. 8 under GP BambooflatI(Re-Tender)
A/R and M/O State Highway under Mannarghat Sub Division, RCD, APWD, Wimberly Gunj during 2025-26. S.W Construction of CC Shoulder protection and CC drain of State Highway-10 from Mannarghat to Wrightmyo wherever required under RCD, APWD, Wimberly G
A/R M/O Rural Road under Sub - Division No. - II, NACD, APWD, Mayabunder during 2023-24.SW-Providing and laying of Hectometer, Kilometer stone and disilting of longitudinal and cross drain of newly improved road under Sub - Division No. -II, Tugapur
R and M of Diesel Engine water pumps at Baratang for Period from July 2021 to September 2021. SW - Supplying installation testing and commissioning of 01 No. 79 HP 6R 1080 Kirloskar Diesel Engine designed to run at 1500 RPM at Shankar Nallah Pump hou
Engaging of Workers on as and when required basis for sanitation work DD collection of garbage from HH commercial and other establishments, loading unloading of wastes to cluster, cleaning of footpaths, drains, CSCs, segregation shed
Supply of manpower for Cutting and Clearing of Bushes/Jungle/drains, Sweeping, door to door collection, loading/unloading and handling all kinds of waste, disposal of dead animals under the jurisdiction of Swadesh Nagar Gram Panchayat
Construction of village road from Krishnapuri School to Nayadera village for a length of 4.03 Km including 01 No. RCC Bridge, 30 Nos. RCC Box type culverts, RCC Retaining wall cum drain by CD, DP, N And M A Dist under CRF during 16-17 Balance work
CERTAIN REPAIRS TO COMPOUND WALL GATE/ GRILL GRATING AND CHAIN LINK FENCING DRAIN, PATH AND CERTAIN PETTY REPAIRS IN MD ACCN AT TRV, MT, CSD COMPLEX, SPECTRUM AN INLIVING SAILOR ACCN OF COAST GUARD UNDER AGE B/R-II AT GE HADDO PORT BLAIR
Widening of footpath side drain with covering slab and M S Jalli and construction of RCC retaining wall and hand railing starting from Shri Chinna Rao Pan Shop Shri Appan house Shri Appal Swamy house to Shri Jai Ram Kerketta Japan Road at Dairy Farm
CERTAIN REPAIRS TO COMPOUND WALL GATE/ GRILL GRATING AND CHAIN LINK FENCING DRAIN, PATH AND CERTAIN PETTY REPAIRS IN MD ACCN AT TRV, MT, CSD COMPLEX, SPECTRUM AN INLIVING SAILOR ACCN OF COAST GUARD UNDER AGE B/R-II AT GE HADDO PORT BLAIR
Re-surfacing of black top road with side drain and covering starting from old Police Station Satellite Colony connecting Austinabad main road via Andal Basti Road Prothrapur in Ward No. 20 under SD-III, CD-II, APWD, Prothrapur for a length of 1015 Mt
A R and M O Rural Roads under Sub Division-II under CD, APWD, Diglipur during 2025-2026. Sw - Construction of RCC Toe wall cum drain in PMGSY-II Road Code AN03DGP05 Stretch Kishorinagar to Paschimsagar Package No. AN0305 Ch 4.100 Km to 4.500 Km
Construction of 1.00 x 1.00 metre Box Culvert and drain with Sluice gate infront of Peerless Beach Resort at Carbyns Cove, Port Blair under EE, SAD, APWD, Port Blair in lieu of Proposed link road connecting to Japan road to Shiv Mandir road at Da
1) Construction of CC Footpath from CC Road to Rakhu house at Ward No.WG-04 under Gram Panchayat Kanyapuram. 2)Construction of CC Footpath with drain and cover slab from village road to Zainudeen house at Ward No.WG-04 under GP Kanyapuram (Re-Tender)
Construction of Protection Wall along the existing road from ATR to Abdul Kader at Ograbraj, Renovation of CC Road from ATR to P.K. Hamsa house at Ograbraj Renovation of CC Drain alongwith the existing CC Road from Zulmat Ali house to Panni Diggi GP
Maintenance of SH and Clearance of road side berms, cross drain cutting in lieu of Engaging unskilled workers for attend day to day maintenance of rural road for a period of 12 Months at Swaraj Dweep during the year 2025-2026 under CD-I, A.P.W.D.,
Engagement of Labours for Cutting and Cleaning of Bushes/Jungle, Cleaning of drains, Sweeping, door to door collection, Segregation of waste collected, loading/unloading and handling all kinds of waste under the jurisdiction of GP Swadesh Nagar
Construction of CC Footpath with both side drain for a length of 43 Mtrs with 03 Mtr width starting from Shri. Ram Baran Ram House to Shri. Dhakan Uraon House at Birsa Nagar Attamphad Ward No. 18, Port Blair under MPLAD Scheme under CD-I, A.P.W.D., P
A/R M/O Rural Road under Sub Division No.II, Tugapur under NACD, APWD, Mayabunder during 2025-26.SW-Construction of Retaining wall/Toe wall cum drain wherever necessary at road from NH near Webi School to NH near Petrol Pump via DC Bungalow at Deopu
SPL REPAIR TO SEWAGE LINE, MANHOLE, SEPTIC TANK AND OTHER CONNECTED WORKS NEAR BLDG NO P-87, P-126, P-214 AND P-125 AT AJAY BAUGH LANE 1 AND PROVN OF MASONRY WALL AND DRAIN NEAR GATE TO NCS UNDER GE MINNIE BAY PORT BLAIR
AR and Mo rural road under SD-II, CD, APWD, Diglipur during 2026-27. SW- Co RCC drain in between 0.00 to 0.30 km in rural road from Kalyani Howlader house to Binod Howlader house Bappi Saha Road under Madhupur Section, SD-II, CD, APWD, Diglipur.
CERTAIN REPAIRS TO COMPOUND WALL, GATE / GRILL GRATING AND CHAIN LINK FENCING, DRAIN, PATH AND CERTAIN PETTY REPAIRS IN MD ACCN AT TRV, MT POOL, CSD COMPLEX, SPECTRUM AND INLIVING SAILOR ACCN AT COAST GUARD OF AGE B/R-I UNDER GE HADDO, SRI VIJAYA PUR
Bottle Gourd, Snake Gourd, Leafy Vegetables Poi Muli Marsa Nali, Kundru, Plaintain Curry, Cabbage, Cauliflower, Ladys finger, Tapoica, Red Pumpkin, White Pumpkin, Lobia, Brinjal, Jamikand, Guniya, Papaya, Beet Root, Ridge Gourd, Bitter Gourd, Tomatoes, Onion
REPAIRS AND MAINT OF FENCING COMPOUND WALL FOOT PATH GUARD WALL DRAIN ETC AT INHS DHANVANTARI MNS MESS HQ 34 WEU IDSC AND OTM ACCN AND DAY TO DAY B/R MAINT AT ASHWINI NAGAR, JAYANT PARK, INHS DHANVANTARI AND OTHER ALLIED WORKS UNDER GE MINNIE BAY POR
Repair and Improvement of Rural Road from SH 9 towards Sai Baba temple Near Rama Rao House including CC Toe wall cum drain Saucer drain etc at Rajiv Nagar under RCD Wimberly Gunj
Construction of CC Drain 165 mtrs. Length near Motorable Road at Nayashar Nursery Camp
REPAIR TO PCC FLOORING / CHEQUERED TILE PATH, CULVERT / DRAIN ETC AT AF STN CARNICOBAR
Construction of approach path and drain from entrance of DCF(WP) office to Library Room
Construction of Toilet Block and CC Drain for IRBn Barrack at Police Complex, Campbell Bay.
Construction and laying of kilometer stone I c road marking and painting in parapet wall of culvert and bridges in rural road from Kalighat Harimandir Junction to Jagannathdera for a length of 8.45 km under SD-III, CD, APWD., Diglipur
Upkeep and maintenance of Raj Niwas. Sub work - Laying of chequerred tiles ,covering tiles and covering the drain and cable duct with drain cover behind Annexe Guest House Raj Niwas in anticipation of VVIP visit during February 2021
Tower AC 3 Ton, Tower AC 2 Ton, Stabilizer 5 KVA, Out Door Stand, Drain Pipe
Construction of 01 No. Bus Shed with attached store, washing ramp including spray nozzle, overhead water tank, drainage, raising floor of Bus Terminus and replacement of existing floor tiles and extension of sunshed at Rangat. SW - Providing IEI
C o footpath and coaltar road upto seashore and cc footpath within Kakana village Kamorta SW C o CC footpath 03 m wide for a length of 1048 m and 1.20 m wide for a length of 857 m i c 04 nos 1x1 m RCC box culvert and toe wall cum drain 5th call
GEAR BOX DUST BOOT, BOTTOM PLATE GASKET, BOTH SIDE DOOR TANK BIDING, PORT SEAL, TROOP COMPARTMENT SEAL, DVR COPULA SEAL, GEAR BOX DRAIN PLUG SEAL, DOOR TANK FILLING CAP SEAL, BOTH SIDE LMG FIRING PORT SEAL, EJECTOR TRAY WATE DRAIN SEAL