Loading…
Loading…
8,302 results • Best match
Construction of nallah leading to Junga Road from MLA Colony in Roop Colony in ward No.26 Panthaghati (SH Construction of RCC Nallah and Steps RD 0 30 to 0 90mtr)
Channelisation of nallah from Ambadkar Colony to Lower Dhalli RD 0 00 to 0 200 ward No 21 Mashobra SH C O nallah RD 0 00 to 0 050 1st phase
C/o Link road Allowang Nallah to Chamera Nallah in K.M. 0/00 to 1/00 , F/C in 5/7 mtr. wide road at R.D. 0/00 to 0/250
Restoration of rain damages Tarahall to Lal Bagh SH C O R wall and nallah with slab ward No 3 Kaithu RD 0 400 to 0 410 with nallah 0 015
C/o R.C.C.Dam ( PWS ) at Rehad nallah near village Rehad in GP Dharech for the year 2023-24 under APO unit Sainj
Provision of underground drainage to the 84 Pourian side drain and providing pavers to 84-Pourian Street Chowk towards Una Khad W.no. 5 MC Una.
Construction of Link road from Parotha to Sara Km. 0/0 to 7/700 under NABARD Project Formation cutting , Cross Drainage, earthen drain and Parapets
(SH- Construction of 10/11.50 mtrs. wide road, providing cross drainage work, Providing laying GSB, WMM, BM and BC, parapets on both side and drains etc. in km 0/0 to 500).
C/O channelization of nallah/ kuhal at various location in Ward No.11
Channelisation of Nallah at Panjari near Shiv Mandir in ward No 10 Tutikandi
Channelization of Nallah near kuhalwale house near main Mandir ward No 2 Jawalamukhi.
C/o Shakti Nallah to Nanori road km 0/0 to 1/600
Channelization of Nallah near Ghirdhari lal house old Chari road Ward No. 4
Channelization of nallah and flooring up to Naroh Village in ward no 8.
Providing of P.C.C. Wall near water Boudi to Nallah in Ward No.7.
C/O Nallah behind Bus Stand in ward no. 5 of NP Gagret
Channelization of nallah near Geeta Adarsh School in ward no.7 phase I
Construction of WHS in Plota Nallah at Bhol Khas,in Nurpur Forest range
Channelisation of Nallah from Bhuvneshwar house to Krishan thakur House ward no 16.
Channelization of Nallah near Kamla house below ITI in ward no.2 Solan
Channelization of Nallah near Mida house to bina house in ward no 13
Repair of kuhal from Pingal nallah to G.S.S.S. Sakoh in Ward No. 8
Construction of retaining wall along nallah near Bansal Niwas ward No 30 Kangnadhar
Channelization of nallah near Ganga Ram Field at Dhangu II Ward No. 2
Repair /Restoration of retaining wall Nallah at Southern boundary DMR Chambaghat Solan HP.
Restoration of rain damage Concreting of road Sita Nallah to GPS upper patti
Formation cutting, R/wall, Cross Drainage work in Km 10/815 to 11/240
(SH- C/O F/C , Protection work, Cross Drainage work, Cross Drainage MT V-Shape drain, Road Safety work and dumping Structure work) km 0/0 to 2/570 under NABARD RIDF-XXX
Formation cutting, Retaining Structure Cross drainage work Granular Sub-Base, WMM Metalling and Tarring, Shoulders V shape side drain Road side essential parapets Road Signages
ROFD, Protection Work, Cross Drainage work, M.T.Works, Panel Concrete, V-Shape Drain, Parapet, Crash Barrier, Road safety, Kilometer stone and dumping site under PMGSY III
SH C/O ROFD, Protection work, Cross Drainage work, M/T, Road side Drain, Crash Barrier, Parapets, Road furniture, Dumping site Package No.HP-06-177.
SH ROFD, Protection work, M/T, Cross Drainage work, Road side Drain, Crash Barrier, Parapets, Road furniture, Bio Engineering, Dumping site Package No.HP-06-174.
SH- CC and RCC drain.
MED GEEMED HEALTHCARE Abdominal Drainage Kit 18FG Size, MED GEEMED HEALTHCARE Abdominal Drainage Kit 18FG Size Catheter
MED GEEMED HEALTHCARE Abdominal Drainage Kit 22FG Size, MED GEEMED HEALTHCARE Abdominal Drainage Kit 22FG Size Catheter
C/O CC Head Wall at Place Choul Nallah in Jhabola Gram Panchyat under APO Berthin during 2021-22.
F/C C/O wire crates/gabion walls, R/walls B/wall P/L M/T CC pavement C/o road side parapets Providing and erecting W metal beam crash barriers C/O v-shape and u-shape drain X-drainage work and C/o 15.25mtr. span RCC T-Beam bridge i/c five year maint
Construction of Check Dam in Chor Nallah
Formation cutting, C/o passing place, Side Drain, Parapets, Cross Drainage, Metaling andTarring work and five year maintenance under PMGSY-IV Package No HP-09-793.
SH C/o Gabion wall protection work for Galahi Nallah at Galahi in Distt. Bilaspur HP
SH C/o Gabion wall protection wrok on Galah Nallah near Bum in distt. Bilaspur HP
Channelisation of nallah from Sisodia Building Naval Cottage to PWD road adjoining to Shiv Mandir Panthaghati in ward No 26 (SH Construction of RCC nallah RD 0 0 to 0 40 mtr)
Restoration of rain damaged nallah path from Sunny Cottage to below Sharma Niwas in ward No 22 Shanti Vihar SH C O RCC nallah and path Rd 0 00 to 0 045
Flood Protection work at vulnerable points on Right Bank of Karpet Nallah Left Bank of Miyar Nallah to mitigate flood disaster in Kerpet Chhaling GP Chimret, Distt. Lahaul Spiti HP Under SDMF
Construction of road from Dokhari Nallah Rogha Kotgarh via Khobar Nallah Km 0/000 to 2/000 SH Formation Cutting 5/7 mtrs wide road in Km 1/000 to 1/255
Balance work of C/O Pucca nallah ( drainge0 and slab from jaspal Singh house to mata ka mandir village rajpura G.P rajpura (SH C/O Pucca nallah G.P rajpura) under DMFT- PMKKKY
Construction of drain No.1 from Telephone Exchange to Main Gate and Drain No.4 from Zoo Boundary to drain No.1
CHANELIZATION OF NALA FROM GURUDWARA TARUWALA PAONTA SAHIB H.P.
(SH- Providing renewal coat at RD 0/0 to 6/0 and 600mtr pucca drain)
C/o P.C. C Head (PWS) Minor Irrigation scheme at Madhana Nallah, Providing and laying , jointing of HDPE pipe nallah to near village Madhana in GP Madhana for the year 2023-24 under APO unit Nerwa