Loading…
Loading…
8,302 results • Best match
Construction of Nallah/path from Mangat Ram house to Lakkar Bazzar Solan.
Construction of RCC Nallah near Phagli Club Shimla in ward No 11
Construction of Nallah cover near Gyan Dham school ward no 7 Nalagarh
Channelization of Nallah from Kalsi house to Sanjay house in Ward No13
M C Nallah from Loomba Niwas to Kashyap Niwas ward No 5
C/O Shed at Crematorium near Pingal Nallah in Ward No.8
Auction of parking Kotla nallah ward no.11 in Municipal Corporation Solan.
Construction of nallah opp. Shivalaya temple in Kathog, Salogra ward no.4
Channelization of Nallah near Anganbadi below thodo ground in ward no.7
C/o CC Dam in Nalwa basti Nallah in GP Mundla Dhar
Construction of Nallah Man Singh house to Harijan Basti Karsoli, GP Karsoli.
Nallah from Deepak Hotel to Kainthla Niwas at Kachighati ward No 9
Balance work of constriction of 120 mtr span bridge over Solang Nallah
Channelaization of nallah and flooring upto Naroh Vilage in ward no.8
Construction of Parking along side road leading to Anji Nallah under AMRUT
Construction of Sarda Nallah bridge (SH Construction of breast wall near bridge)
Channelization of nallah from Police quarters to Vrindavan colony ward no.11
Construction of Nallah Jagotta house to Ujjagar house in Ward No.11
chanellization of nallah near ho sawarna devi at ward no 05 jawalamukhi
Construction of WHS in Mamuh Nallah in GP Gurchal Nurpur Forest Range
(SH- Earth work, Protection work, Cross Drainage work, Cross Drainage MT V-Shape drain, Road Safety work and dumping Structure work) km 0/0 to 6/190 under NABARD RIDF-XXX
Construction of road from Raising Elevation to drain water and edge wall Ashok Kumar House to Shiv Mandir in Jhikla Moch in GP Sunet Under MLALAD Deposit Work SH Construction of drain and Providing and laying interlocking concrete block pavement at
Re -drilling (Reaming) and washing of drainage holes of Drainage Gallery at Power House CPS-I , Khairi.
SH Formation Cutting and Cross Drainage work km 0/0 to 0/645
Formation cutting and Cross drainage work in Km 0/0 to 0/500
Submersible pump drainage and dewatering
RCC Rain Water Harvesting Structure, 2 Nos. Crate Walls, Providing Fencing 60 mtr on both Banks and Const. of 40 Mtr. Retaining Wall on both Banks
Provn of storm water drains at Mil StnYol
Repair to steel and iron work such as railings, chain link fencing, meshing covering of drains including repair to the drain to be covered with steel covers.
Construction of Nallah leading from Dr Colony to Shandil Niwas near Shakti Vihar in ward No 26 Panthaghati (SH Construction of RCC nallah RD 0 0 to 0 150 mtr
Construction of Nallah leading to Tenzin Hospital to Chauhan Niwas at Shivalik colony in ward no 26 Panthaghati (SH Construction of RCC Nallah RD 0 0 to 0 30 mtr)
C/O road from Dokhri Nallah Rogha Kotgarh via Khobal Nallah Km 0/000 to 2/500 SH C/O PCC R/Wall at Rd 0/000 to 0/020
Beatification of Charan Ganga at Talai in Tehsil Jhandutta Distt Bilaspur HP SH Construction of retaining wall on left bank and Dugh Nallah and Construction of Bathrooms at Dugh Nallah
Prevention of Land Slide disaster for protection of Bairagarh Upper Nallah and Lower Nallah on Tissa Satyas road KM 24/380 to 24/620 and 22/580 to 22/700
Construction of Nallah leading to Satya Niwas to M C Boundary at Devnagar in ward no 29 Vikas Nagar (SH Construction of RCC Nallah RD 0 140 to 0 180)
Prevention of land slide disaster for protection of Bairagarh Upper Nallah and Lower Nallah on Tissa Satyas road KM 24/380 to 24/620 and 22/580 to 22/700
Formation cutting, passing place, retaining walls, cross drainage work, tarring work, side drain, parapets and road furniture etc. Including routing maintenance for five year
(SH Formation cutting, Passing places, R/Walls, Cross drainage work, GSB, WBM-II, WBM-III, Tarring work, Side drain, parapets and cement concrete pavement).
ROFD, Construction Of R.walls, Cross drainage work, Metalling and Tarring, Providing Safety measures and Construction Of V-Shape drain in Km. 7.500 to 10.00
(SH - C/O Passing place, R/Wall, Cross Drainage work, GSB, WBM-II, WBM-III Tarring work, Cement concrete pavement, side drain and parapets)
C/O Earth Work, Protection Work, Cross Drainage work, V-Shape Drain, Road furniture and Dumping Structure in km 0/00 to 4/400.
ROFD, Construction of R.walls, Cross drainage work, Metalling and Tarring, Providing Safety measures and Construction of V-Shave drain in Km. 0.0 to 2.500
SH-C/o ROFD, Protection Work, Cross drainage work, Metalling and Tarring, Panelled concrete Pavement, FDR, Road side drain, Road Furniture and Dumping Structure.
Construction of drain from Rajat building to Guleria house and providing and fixing iron railing at forest road near Bedi house and main forest raod in ward no.10 Solan.
Construction of Drain with RCC Slab from Old SBI Building to Him Corner Shop at Una HP RD 0 mtr to RD 110 mtrs 110 mtrs under MC Una HP
Channelization of Nalla and C/o Ambulance road in Ward No 05, Brij Nagar, Hamirpur Phase 2
Channelization of Nalla and C/o Ambulance road in Ward No 05, Brij Nagar, Hamirpur Phase 1
Construction of Jal Bhandaran Structure at Muratan Nalla under JICA Project in Nachan Forest Division at Gohar
SH Construction of RCC intake at fannar nallah source
C/O road from Dokhari Nallah Rogha Kotgarh via Khobal Nallah Km 0/000 to 2/500 SH Formation Cutting 5/7 mtrs wide road in Km0/000 to 0/555