Loading…
Loading…
2,743 results • Best match
For the work Delta Type earthing of 1x10 MVA, 2x5 MVA and 2x10 MVA Power T/F installed at 33/11 KV S/s Ramleela Ground, Store center and Naktadana under Electricity Distribution Division, Pilibhit.
Work of 33 kv and 11 kv for replacement of PT/CT/VCB and work of guarding/earthing/LA and 11 kv line under business plan 2025-26 in the jurisdiction of EE EDD GOPIGANJ
Work of 33 kv and 11 kv for replacement of PT/VCB and work of control cable/ earthing /isolator and 11 kv line under business plan 2025-26 in the jurisdiction of EE EDD BHADOHI
High Mast lighting system pole, aluminium conductor PVC insulated, Safe Earthing Electrode, LED Flood Light Luminaries with Die Cast Aluminium Housing, TPN of automatic street light cubicle control panel, LED Aviation obstruction light, Rope Light
for stop of leakage of T/F oil Changing al packing of LT/HT Bushing seals and complete filling of T/F oil in t/f and re-earthing of T/F under EDD Deoband
MOULDED C T TERMINAL BLOCK WITH 14 TERMINALS TO DRG. 24993000009 REV-8C, VAR-01 & STYLE NO - 605140., MOULDED EARTHING TERMINAL BLOCK WITH THREE TERMINALS AS PER DRG NO 24993000012 REV-04A ITEM 01 & 02
For Laying of LT PVC cable and Earthing work for Various 25/63/ 100/250 KVA T/F installed at Various places /Villages emanating from 33/11 KV S/S Tota Tanda under EDD Behat
Set of Hex Head Screw & Spring Washer for LHB, set consist: (1) Hex Head Screw for Earthing device of CTRB M8x30mm, Property Class 10.9, conforming to CG- 15070 Alt.1 (LHB Shell with FIAT Bogies)-01 Nos. (2) Hex Head Bolt for Phonic wheel of CTRB M8x35mm (LHB Shell with FIAT Bogies), Property Class 10.9, conforming to CG-15071, Alt.1- 02 Nos. & (3) Spring Washer, type-B nominal size for M-8 Bolt conforming to IS: 3063-1994-03 nos. Make: as per Drawing No. T-0- 2-619,
Set of Kaba Keys as per CLW Spec. No. CLW/ES/3/0049 Alt-E or latest if any for 3 phase locomotive. (1) Red colour for CAB activating. Qty/set- 40 Nos. (2) Blue colour key for pantograph air supply isolating cock. Qty- 10 Nos. (3) Yellow colour for ... for earthing switch ...
5Mtr Octagonal Pole (Q3), Armoured Cable (Q3), DIECAST ALUMINIUM BODY LIGHT 90 WATT LED (Q3), plain or pin type copper cable socket (Q3), Cubical Automatic Control Panel (Q3), Earthing Electrode (Q3), iNSULATOR (Q3), D Clamp (Q3)
Solar System Capacity 735 watt with 27 year warranty, Solar Inverter with 5 year warranty, Battery 200AH, Earthing Kit, Arrester Lighting, LED Lights 50watt, Super structure stainless steel for panels, Solar Installation with accessories and wires
422 Nos. Earthing of Various Capacity Distribution T/F and 11KV/33KV Panel Installed in the work area of Various 33/11KV S/S of EDD BKT, JANKIPURAM and DALIGANJ under jurisdiction of EUDC-PURANIA, Lucknow
For Boring type Earthing of Medium power transformer and other associated work in the area under EUDD Mahanagar against Business Plan 2025-26 Sanction Package no 270 271 272 and 273 SI CE BP 2025 26
Work of MAKING OF DELTA EARTHING OF 132 AND 33 KV L.A. AND OTHER RELATED MISCELLANEOUS WORKS AT 40 MVA, 132/33 KV TRANSFORMER I AND II BAY IN 132 KV SUBSTATION SARILA UNDER ETD HAMIRPUR
SPL REP FOR REPLACMENT OLD DETERIORATED EARTHING SYSTEM AT CERTAIN LOCATIONS, CONVERSION OF 1-PHASE ELECTRIC SUPPLY TO 3-PHASE SUPPLY IN OMQS AND REPLACEMENT OF DBS IN SMQ AREA AFS SARSAWA UNDER GE AF SARSAWA
Business Plan 24-25 (Part-2) Plan Construction of substations in areas fed by 33/11 KV power substation, pipe earthing of distribution transformers, facing of distribution transformers, fire wall between distribution transformers 11 KV line.
5Mtr Octagonal Pole (Q3), Armoured Cable (Q3), DIECAST ALUMINIUM BODY LIGHT 90 WATT LED (Q3), plain or pin type copper cable socket (Q3), Cubical Automatic Control Panel (Q3), Earthing Electrode (Q3), iNSULATOR (Q3), D Clamp (Q3)
5Mtr Octagonal Pole (Q3), Armoured Cable (Q3), DIECAST ALUMINIUM BODY LIGHT 90 WATT LED (Q3), plain or pin type copper cable socket (Q3), Cubical Automatic Control Panel (Q3), Earthing Electrode (Q3), iNSULATOR (Q3), D Clamp (Q3)
Shifting, loading, unloading, safe carriage of MS Round Bar and MS Flat 75x10mm and Mesh Earthing of 132/33KV LA and Painting work of various structures installed at 132KV S/S Salayakhurd under ETD-III, Prayagraj
Under the Business Plan Scheme 2026-27, work related to earthing of power/distribution transformers, replacement of worn out lines, installation of poles in long spans, installation of protection on distribution transformers, construction of 11 KV
5Mtr Octagonal Pole (Q3), Armoured Cable (Q3), DIECAST ALUMINIUM BODY LIGHT 90 WATT LED (Q3), plain or pin type copper cable socket (Q3), Cubical Automatic Control Panel (Q3), Earthing Electrode (Q3), iNSULATOR (Q3), D Clamp (Q3)
Safe Carriage of 36KV VCB, Dismantling of Defective 36KV VCB of 33KV SPC Feeder, Erection of New 36KV VCB, Making of Jumpers for 36KV VCB by ACSR P.C., Cable Termination and Earthing of New 36KV VCB
Cartage and Installaion of 11 KV VCB, Reparing and overhauling of Incoming and outgoing feeders and Earthing of all indoor equipments at 33/11 KV Sub-Station Ram ki Paidi Under Electricity Distribution Division Ist, Ayodhya
Repairing and overhauling of steel channel, cable trench cover, cable stand, Replacement of earthing strip, provision of LED light in the room of Power TF No 1 at 33 avam 11 KV sub station Jawahar Bhawan
Custom Bid for Services - ELECTRICAL SERVICE SECOND SHIFTS KILLED, Custom Bid for Services - THERMOGRAPHY TEST OF FEADERELEC LT HT, Custom Bid for Services - TESTING OF TRANSFORMER, Custom Bid for Services - TRANSFORMER OIL TESTING, Custom Bid for ... OF EARTH PIT REPAINTING, ...
7Mtr GI Octagonal Pole (Q3), Armoured Cable (Q3), DIECAST ALUMINIUM BODY LIGHT 90 WATT LED (Q3), plain or pin type copper cable socket (Q3), Cubical Automatic Control Panel (Q3), Earthing Electrode (Q3), iNSULATOR (Q3), D Clamp (Q3)
For Earthing of DT, Repalcement of LT Lead of DT and Laying of LT Armoured Aluminium Service Cable size 2x6 sq mm at Various Places under System Strengthening works in Municipal area scheme under EDD-II, Bareilly
7Mtr GI Octagonal Pole (Q3), Armoured Cable (Q3), plain or pin type copper cable socket (Q3), DIECAST ALUMINIUM BODY LIGHT 90 WATT LED (Q3), Cubical Automatic Control Panel (Q3), Earthing Electrode (Q3), iNSULATOR (Q3), D Clamp (Q3)
The installation of new 33 KV VCB 11 KV Incoming Outgoing VCB and strengthening of 11 KV HT LT lines earthing work its related other works at various places under EDD-Puranpur in Business Plan 2025-26.
7Mtr GI Octagonal Pole (Q3), DIECAST ALUMINIUM BODY LIGHT 90 WATT LED (Q3), Armoured Cable (Q3), plain or pin type copper cable socket (Q3), Cubical Automatic Control Panel (Q3), Earthing Electrode (Q3), iNSULATOR (Q3), D Clamp (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220KV SS NEHTAUR 132 KV SS NAJIBABAD AND NAGINA AND DHAMPUR; WORK OF EARTHING OF LIGHTENING ARRESTER OF POWER TF REPLACEMENT OF 145 KV CTS; Service Provider
Strenthening of LT/ 11 KV Line and replacement of Damage Conductor with Arial Bunch Conductor, Making Plinth, Earthing, Fencing of 250 KVA T/F at Vill Gantholi under Business Plan in jurisdiction of E.D.D.-IV, Goverdhan, Mathura
Maintenance of 11 KV/LT Line and Various Capacity Transformers, Plastic Shielding of Poles, Guarding, Earthing at Goverdhan Town due to uninterrupted power supply on the Occasion of Mudiya Puno Mela 2019 Under E.D.D.-IV, Goverdhan, Mathura
The increasing capacity of over loaded distribution transformers from 10 KVA to 25 KVA, installation of new many capacity distribution transformers and strengthening of 11 KV HT LT lines, earthing work its related other works under EDD-PBT
Maintenance of 11 KV/LT Line and Various Capacity Transformers, Plastic Shielding of Poles, Repairing of Guarding, Numbering, Earthing at the area of Choti Parikrma (Radhakund/Kusum Sarovar) due to uninterrupted power supply on the Occasion of Mudiya
Laying of Additional LT Circuit, Pipe Type Earthing Construction of New Plinth and Installation of Tailless Fuse Unit of different capacity Transformers installed in the different places of work area Engineering Collage and Vikas Nagar Sub Division u
REPAIR MAINT TO VARIOUS TYPE STORAGE TYPE WATER HEATERS AND REPAIR MAINT OF EARTHING WORK SOLAR WATER HEATING SYSTEM FIRE ALARM SYSTEM ELECTRICK OVER HEAD CRANE CHIMNEY UPS OF VARIOUS CAPACITY SENSOR GATE AND INCLUDING EM APPLIANCES INSTAL
Replacement of Damaged PCC Pole, Jurjar Conductor and Resagging of loose conductor, Strentheing of Tilted pole in Different Places and Borewell type earthing for Neutral of Transformer and base body of transformerof in EDSD-IInd under EDD-IIND
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Measurement of Tower Foot Earthing Resistance Surge Impedance of EHV Line Towers of 400 KV S/C Manth-Muradnagar Line; Transmission Line under E400 kv sub; Service Provi..
Maintenance of 11 KV/LT Line and Various Capacity Transformers, Plastic Shielding of Poles, Guarding, Earthing at Choti Parikrma (Radhakund) due to uninterrupted power supply on the Occasion of Mudiya Puno Mela 2019 Under E.D.D.-IV, Goverdhan, Mathur
Maintenance of 11 KV/LT Line and Various Capacity Transformers, Plastic Shielding of Poles, Guarding, Earthing at Badi Parikrma (Anyour, Jatipura) due to uninterrupted power supply on the Occasion of Mudiya Puno Mela 2019 Under E.D.D.-IV, Goverdhan,
Custom Bid for Services - Electrical Assistance, Custom Bid for Services - Transformer filteration, Custom Bid for Services - ACB Servicing HY, Custom Bid for Services - VCB Servicing HY, Custom Bid for Services - Thermography Half Yrly, Custom Bid ... - Earthing Wire ... - Earthing Clamps, ...
Custom Bid for Services - Electrical Assistance, Custom Bid for Services - Transformer filteration, Custom Bid for Services - ACB Servicing HY, Custom Bid for Services - VCB Servicing HY, Custom Bid for Services - Thermography Half Yrly, Custom Bid ... - Earthing Wire ... - Earthing Clamps, ...
Miscellaneous Electrical Maintenance works such as Erection Repair of Pole Plinth Stay wire Laying Guarding of HT LT Line Conductor Transformer Building Earthing TPMO LA Fuse Unit Installation LT Panel Busbar Brick Soling etc. works of CEMD ATP Anpar
Maintenance of 11 KV/LT Line and Various Capacity Transformers, Plastic Shielding of Poles, Guarding, Nmbering, Earthing at Badi Parikrma (Anyour, Jatipura) due to uninterrupted power supply on the Occasion of Mudiya Puno Mela 2022 Under E.D.D.-IV, G
The installation of new 100 KVA distribution transformer, installation of new 33 KV VCB and strengthening of 11 KV HT LT lines, earthing work its related other works at various places under EDD-Bisalpur in Business Plan 2025-26.
Maintenance of 11 KV/LT Line and Various Capacity Transformers, Plastic Shielding of Poles, Repairing of Guarding, Numbering, Earthing at Goverdhan Town due to uninterrupted power supply on the Occasion of Mudiya Puno Mela 2022 Under E.D.D.-IV, Gover
Work of Earthing of distribution Transformers at various site Under Business Plan Scheme 2023-24 on Semi Turnkey Basis in the Area of EE, EUDD-IV, EUDD-VII, EUDD-X Ghaziabad. Under the jurisdiction of SE, EUDC-III, Ghaziabad.
Replacing all the packing of the converter and seals of LT and HT bushing and to replenish the oil Quantity of the converter and to re-install the earthing system of the converter in the area of EDD Deoband
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Tracing the DC earthing leakage of the 220 KV S S Meetai with the help of DC earth latest equipment skilled technicians and experienced engineers for proper checking of ..