Loading…
Loading…
8,387 results • Best match
REPAIR/MAINT OF LT OH CONDUCTORS, UG CABLE, LT PANEL, TIMER AND OTHER ALLIED WORKS AT MD/OTM ACCN, GFA, NVL, OVL, 71 MOUNTAIN BDE, CARRIAPPA MARG AND OTHER ADJOINING AREA WEST OF MG ROAD UNDER GE E/M LUCKNOW
Supply of COSMOS TPN phase segregated distribution board 6 way with incoming MCB TPN 63 amps breaking capacity 10KA-1 Nos. , MCB SP & N -32 Amps -06 Nos. , MCB single pole 6-32 Amps breaking capacity
Wall mounting type AC metalic box, CRCA Sheet Steel Plug and Socket Distribution Board, Current Rating - 20 Amp, As per Standard IS 13032, Cable Entry - Top Entry, No of Pins - 2P+E, IP-30, Rated volt
Round the clock operation and maintenance of Permanent Station Lighting System,underground cable laying,motor maintenace work, dry type transformer maintenace work,0.4KV switchgear maintenance work
Round the clock Routine,Preventive maintenance work of LT switchgear at WTP and BOPs under the scope of work of EMD-II, 2X500 MW, DTPS, Anpara
Special M and R of Partition wall, False ceiling and Glazing work in MCB, Switchgear, CW pump house and BTPS service building of ATP Anpara Sonebhadra.
Round the clock Routine/Preventive maintenance work of LT switchgear at WTP, and BOPs under the scope of work of EMD-II, 2X500 MW, DTPS, Anpara
11 KV Feeder Bifurcation and Replacement of Damaged 33 and 11 KV Switchgear under EDD-IIIrd Basti under B.P. 2023-24 head on semi turnkey Basti
Round the clock routine preventive break down Electrical maintenance of 6.6 0.4KV Switchgear motors of Unit No. 7 and related common auxiliaries daily HTPS Kasimpur Aligarh
11 KV Feeder Bifurcation and Replacement of Damaged 33 and 11 KV Switchgear under EDD-IInd Basti under B.P. 2023-24 head on semi turnkey Basti
11 KV Feeder Bifurcation and Replacement of Damaged 33 and 11 KV Switchgear under EDD-IInd Basti under B.P. 2023-24 head on semi turnkey Basti
11 KV Feeder Bifurcation and Replacement of Damaged 33 and 11 KV Switchgear under EDD-Harraiya,Basti under B.P. 2023-24 head on semi turnkey Basti
COMPREHENSIVE MAINTENANCE OF EM INFRASTRUCTURE AND LT DISTRIBUTION NETWORK SWITCHGEAR CIRCUIT BREAKER AND CONNECTED WORK IN TECH AREA OF AF STN BAMRAULI UNDER GE AF BAMRAULI
Custom Bid for Services - HIRING OF EXPERT SERVICES FOR 33KV GAS INSULATED SWITCHGEAR INSTALLED AT GAIL PATA Similar Category Customized AMC/CMC for Pre-owned Products
REPAIRS MAINTENANCE TO INTERNAL ELECTRIFICATION SYSTEM OF 71 RMU 820 SU 14 P AND SU AND PJ ENCLAVE BEGAM BAZAAR AND CERTAIN OTM ACCN OF NORTH CAMP AT AF STN BAMRAULI
REPAIR/MAINT OF AREA LIGHTING SYSTEM INCLUDING ALLIED WORKS IN NORTH CAMP, HAPPY HOME, OFFRS MESS, BEGUM BAZAR, 71 RMU, 820 SU, PJ ENCLAVE AND JCOs MESS AT AF STN BAMRAULI
PROVISION OF TRANSFORMER STAND BY DG SET HT/LT CABLES LT PANELS AND ALLIED WORKS FOR PSA OXYGEN GENERATION PLANTS AND OXYGEN AS PIPELINE FOR ACUTE COVID 19 CARE UNDER PARA 35 OF DWP 2020 IN VARIOUS WARDS OF COMD HOSP CC UNDER GE E/M LUCKNOW
CONVERSION OF LT OVER HEAD LINES INTO U/G CABLES INCLUDING REPLACEMENT OF LT PANELS AND ALLIED WORKS AT 416 ENGR BDE, RVC ORs LINE, 19 ENGR REGT, DOGRA FARM FAMILY QTR, FAFA ACCN AND OLD SF QTR NEAR UMRAO SINGH ENCLAVE UNDER GE (U) MEERUT CANTT
RECTIFIER LOT -1 WITH QT, RECTIFIER LOT -1, RECTIFIER LOT -2, RECTIFIER LOT -3, RECTIFIER LOT -4, 9KW AC-DC POWER SUPPLY LOT -1, 9KW AC-DC POWER SUPPLY LOT -2, 9KW AC-DC POWER SUPPLY LOT -3, 9KW AC-DC POWER SUPPLY LOT -4, POWER TRAIN ASSEMBLY LOT -1, ... 4, CONTROL PANEL PCB ... -1, CONTROL PANEL PCB ... -2, CONTROL PANEL PCB ... -3, CONTROL PANEL PCB ... -4, CONTROL PANEL BIAS ... -1, CONTROL PANEL BIAS ... -2, CONTROL PANEL BIAS ... -3, CONTROL PANEL BIAS ... -4, CONTROL PANEL SIGNAL ... -1, CONTROL PANEL SIGNAL ... -2, CONTROL PANEL SIGNAL ... -3, CONTROL PANEL SIGNAL ... -4, MCCB SYSTEM ... -1, MCCB SYSTEM ... -2, MCCB SYSTEM ... -3, MCCB SYSTEM ...
Increasing Capacity of Varius Typ of T/F, Installation of Extra 63Kva, 100Kva, 250Kva, 400Kva T/F, Replacement of 11 KV I/C and O/G VCB, 33KV VCB and Control Pannel in the Area of EDD-I/II, Lalitpur Under Business Plan 2023-24
For Shifting of 33 KV and 11 KV VCB Panels of Newly Constructed Control Room Building and Installation of Bus Coupler and 11 KV VCB for Sub-Station Transformer at 33/11 KV Sub-Station Nauchandi, Meerut in the Area of EUDD-III, Meerut.
QUANTUM OF WORKS INVOLVED IN REPLACEMENT OF OLD JARJAR,BATTERY CHARGER SET, REPLACEMENT OF OLD,JARJAR 11 KV VCB. PROVIDING OF NEW 11 KV VCB AND REPLACEMENT OF OLD,JARJAR CONTROL CABLE AT DIFF. 33/11 KV SUB STATION UNDER THE SPECIAL BUSINESS PLAN
Strengthening Work of 33 KV Line, Strengthening Work of 11 KV Line, Strengthening and Protection of 33 11 KV Sub-stations, 11 KV VCB Work, 33 KV VCB Work, Switch Yard Work 11 0.4 KV Distribution Transformer Plinth Fencing Earthing Work BP 2026-27
IOH replacement kit for Single Bottle VCB type 22CB as per Schneider Electric part No. MFR 38246 (excluding IOH kit for Parker make regulator) as per CLW Letter no. CLW-ELDD/3229(VCB) Dt. 14.03.2024, consisting of 24 items as per attached Annexure-A
240405_HRC CONTROL FUSE 63A, 240405_NEUTRAL LINK 100A-160A, 240405_NEUTRAL LINK 200A-400A, 240405_NEUTRAL LINK 20A, 240405_NEUTRAL LINK 32A- 63A, 240405_POSITION LIMIT SWITCH1600A, 240405_POSITION LIMIT SWITCH2000A, 240405_POWER FUSES HRC FUSE 100A, 240405_POWER FUSES HRC FUSE 125A, 240405_POWER FUSES HRC FUSE 160A, 240405_POWER FUSES HRC FUSE 16A, 240405_POWER FUSES HRC FUSE 200A, 240405_POWER FUSES HRC FUSE 20A, 240405_POWER FUSES HRC FUSE 25A, 240405_POWER FUSES HRC FUSE 315A, 240405_POWER FUSES HRC FUSE 32A, 240405_POWER FUSES HRC FUSE 63A, 240405_POWER FUSES HRC FUSE 6A, 240405_POWER FUSES HRC FUSE 80A, 240405_SPRING CHARGED SWITCH1600A, 240405_SPRING CHARGED SWITCH2000A, 240405_SPRING CHARGING MOTOR1600A, 240405_SPRING CHARGING MOTOR2000A, 240405_START PUSH BUTTON GREEN, 240405_STOP PUSH BUTTON RED, 240405_OVERLOAD RELAY 0.63-1.0A, 240405_OVERLOAD RELAY 1.0-1.6A, 240405_OVERLOAD RELAY 1.6-2.5A, 240405_OVERLOAD RELAY 10-13A, 240405_OVERLOAD RELAY 13-18A, 240405_OVERLOAD RELAY 18- 25A, 240405_OVERLOAD RELAY 2.5 - 4.0A, 240405_OVERLOAD RELAY 23-32A, 240405_OVERLOAD RELAY 28-40A, 240405_OVERLOAD RELAY 38-50A, 240405_OVERLOAD RELAY 4.0-6.0A, 240405_OVERLOAD RELAY 48-57A, 240405_OVERLOAD RELAY 65-105A, 240405_OVERLOAD RELAY 66-80A, 240405_OVERLOAD RELAY 7-10A, 240405_TP POWER contactor AC 16A, 240405_TP POWER contactor 32A, 240405_TP POWER contactor 50A, 240405_TP POWER contactor 63A, 240405_TP POWER contactor 80A, 240405_TP POWER contactor 115A, 240405_TP POWER contactor 185A, 240405_TP POWER contactor 400A, 240405_TP POWER contactor 25A, 240405_TRIPING COIL 1600A, 240405_TRIPING COIL 2000A-4000A 240405_ AIR BREAK SWITCHES (TP) 100A Make-C&S, 240405_ AIR BREAK SWITCHES (TP) 125A Make-C&S, 240405_ AIR BREAK SWITCHES (TP) 160A Make-C&S, 240405_ AIR BREAK SWITCHES (TP) 250A Make-C&S, 240405_ AIR BREAK SWITCHES (TP) 32A Make-C&S, 240405_ AIR BREAK SWITCHES (TP) 400A Make-C&S, 240405_ AIR BREAK SWITCHES (TP) 63A Make-C&S, 240405_ AIR BREAK SWITCHES (TP) 200A Make-C&S, 240405_ CONTACT SWITCH 1600A Make- C & S, 240405_2WAY FIN SUPPT INSLTR for chd Make- C&S, 240405_3WAY FIN SUPPT INSLTR for chd Make- C&S, 240405_ROUND SUPPT INSLTR for chd Make-C & S, 240405_ CLOSING COIL1600 A for chd plant Make-C&S, 240405_ CLOSING COIL 2000 A for chd plant Make-C&S, 240405_ COIL 4P POWER contactor 125A Make-C&S, 240405_ COIL 4P POWER contactor 16A Make-C&S, 240405_ COIL 4P POWER contactor 32A Make-C&S, 240405_ COIL 4P POWER contactor 60A Make-C&S, 240405_ COIL 4P POWER contactor 80A Make-C&S, 240405_ COIL 4P POWER contactor 115A Make-C&S, 240405_ COIL 4P POWER contactor 185A Make-C&S, 240405_ COIL 4P POWER contactor 265A Make-C&S, 240405_ COIL 4P POWER contactor 400A Make-C&S, 240405_ COIL 4P POWER contactor 50A Make-C&S, 240405_ COIL 4P POWER contactor 63A Make-C&S, 240405_DP AIRBREAK SWITCH
5a - Scope of Supply, 100000000012 Supplying of materials for in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level -Refer Annexure 5a - Scope of Supply, 100000000013 Shifting loading unloading placing Installation testing and commissioning of above mentioned Panel This includes foundation Civil Work-Refer Annexure 5b-Scope of Erection, 100000000014 Shifting loading unloading placing Installation testing and commissioning of above mentioned- Refer Annexure 5b-Scope of Erection, 100000000015 Making end termination with brass compression gland and aluminium lugs for 3point5C X 70sqmm size of PVC insulated -Refer Annexure 5b - Scope of Erection, 100000000016 Making end terminations of 3point5Core 300 sqmm size of cables -Refer Annexure 5b - Scope of Erection, 100000000017 Installation Testing and commissioning of Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories -Refer Annexure 5b - Scope of Erection, 100000000018 InstallationTesting and commissioning of 25 mm X 5 mm copper strip -Refer Annexure 5b - Scope of Erection, 100000000019 Installation Testing and commissioning of Earthing with GI earth plate 600 mm X 600 mm X 6 mm thick including accessories-Refer Annexure 5b - Scope of Erection, 100000000020 Installation Testing and commissioning of 25 mm X 5 mm GI strip-Refer Annexure 5b - Scope of Erection, 100000000021 Laying of one number PVC insulated and PVC sheathed XLPE power cable Above 35sqmm and upto 95 sqmm-Refer Annexure 5b - Scope of Erection, 100000000022 Laying of one number PVC insulated and PVC sheathed XLPE power cable Above 185 sqmm and upto 400 sqmm-Refer Annexure 5b - Scope of Erection, 100000000023 Laying of one number PVC insulated and PVC sheathed XLPE power cable Above 185 sqmm and upto 400 sqmm -Refer Annexure 5b - Scope of Erection, 100000000024 Laying and fixing of one number XLPE or PVC insulated and PVC sheathed or XLPE power cable -Refer Annexure 5b - Scope of Erection, 100000000025 Mouling through the existing roads in any kind of soil-laying of HDPE pipe 90mm pipes for cables etc-Refer Annexure 5b-Scope of Erection, 100000000026 Excavation of the cable trenches in hard rock not exceeding 1point5 metres in width and lift upto 1point5 metres including -Refer Annexure 5b - Scope of Erection, 100000000027 Mixing Laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level -Refer Annexure 5b - Scope of Erection, 100000000028 Laying of 90 mm dia OD 90 mm and ID 76 mm nominal size HDPE pipe ISI marked along with all accessories -Refer Annexure 5b - Scope of Erection
CARRIAGE AND ERECTION OF 33 KV VCB AND 33 KV PT AT 132 KV S/S MUHMDABAD UNDER ETD MAU
Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3), MCB - Miniature Circuit - Breakers for A.C. Operation as per IS/IEC 60898 (Part 1) (Q2), Isolator switch (Q3), XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), Compression cable lugs (Q3)
Unbranded 800 A 4 Pole 60 KA Molded Case Circuit Breakers, Unbranded 800 A 4 Pole 60 KA Molded Case Circuit Breakers (Mccb)
INDO ASAIN 630A 4 Pole 50 KA Molded Case Circuit Breakers, INDO ASAIN 630A 4 Pole 50 KA Molded Case Circuit Breakers (Mccb)
INDO ASAIN 160A 3 Pole 16 KA Molded Case Circuit Breakers, INDO ASAIN 160A 3 Pole 16 KA Molded Case Circuit Breakers (Mccb)
INDO ASAIN 400A 4 Pole 50 KA Molded Case Circuit Breakers, INDO ASAIN 400A 4 Pole 50 KA Molded Case Circuit Breakers (Mccb)
INDO ASAIN 250A 3 Pole 25 KA Molded Case Circuit Breakers, INDO ASAIN 250A 3 Pole 25 KA Molded Case Circuit Breakers (Mccb)
INDO ASAIN 400A 3 Pole 35 KA Molded Case Circuit Breakers, INDO ASAIN 400A 3 Pole 35 KA Molded Case Circuit Breakers (Mccb)
INDO ASAIN 400A 3 Pole 35 KA Molded Case Circuit Breakers, INDO ASAIN 400A 3 Pole 35 KA Molded Case Circuit Breakers (Mccb)
benlo bentec 160A 3 Pole 10 KA Molded Case Circuit Breakers, benlo bentec 160A 3 Pole 10 KA Molded Case Circuit Breakers (Mccb)
Unbranded 1250 A 4 Pole 50 KA Molded Case Circuit Breakers, Unbranded 1250 A 4 Pole 50 KA Molded Case Circuit Breakers (Mccb)
INDO ASAIN 160A 4 Pole 25 KA Molded Case Circuit Breakers, INDO ASAIN 160A 4 Pole 25 KA Molded Case Circuit Breakers (Mccb)
Schneider electric 400A 4 Pole 35 KA Molded Case Circuit Breakers, Schneider electric 400A 4 Pole 35 KA Molded Case Circuit Breakers (Mccb)
Supply of LTDB with MCCB for 400 KVA T/Fs related to Business Plan works under Tindwari/Baberu Sub-Stations under EDD, Banda
REPAIR / MAINT OF LT DISTRIBUTION NETWORK SYSTEM, VARIOUS SIZE CABLES, BUSBAR, PANELS, MCCB AND OTHER ALLIED WORK AT 24 ED AF STN MANAURI
400 Amps MCCB ,3 pole 415 Volt ,50 Hzs,Breaking Capacity 80 KA. Conforming to IS Specification No.13947(P-2) IEC; 947.
3 Pole 400Amp capacity 35 KA MCCB rated voltage 440 volt 50 Hz Make L&T ,L&T ,Siemens ABB with test certificate
Supply of MCCB 150 A, 2/3 Pole , 240 Volt AC, (Type -C) , 50 kA conforms to IEC 60947-2, Miniature Circuit Breakers
Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2), Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), Isolator Switch (Switch Disconnector) Conforming To IS/IEC 60947 (Part 3) (Q3) (3 (3 ))
Manufacture and Supply of 11 KV Automatic Voltage Regulator Transformer of 16 MVA Capacity to supply constant voltage of 11 KV to switchgear (VCB Type) panel
PROVIDING E AND M WORK SERVICES AT HAF GZB SH CHANGE OF OVERHEAD POWER LINE INTO UNDER GROUND AT SMQ AND MISC ELECTRICAL PANEL WORK AT CNCO OFFICES MESS AND WIRING REWIRING AMF PANEL ETC
Custom Bid for Services - HIRING OF ELECTRICIANS THROUGH CLASS A CONTRACTOR FOR OPERATION WORK OF ELECTRICAL PANEL ROOM AND EQUIPMENT CUM DG SET OPERATION AT BPCL SHAHJAHANPUR DEPOT Similar Category Manpower Outsourcing Services - Minimum wage
CA NO.CWE BLY/GE (E)/93 OF 2025- 2026REPAIR/MAINT OF HT DISTRIBUTION SYSTEM AND ITS CONNECTED WKS OF EAST AREA, REPAIR/MAINT OF DISTRIBUTION TRANSFORMER, CONTROL PANEL AND CONNECTED WKS OF EAST AREA, REPAIR /MAINT/REPLACEMENT OF HT CABLE
Work of increasing the capacity of power transformer under EDD-I, Mau and EDD-II, Mau and work of installation/repair of CT, PT, LA, Bus Isolator, Line Isolator, Control Panel under EDD-II, Mau in 20 cr per district plan