Loading…
Loading…
810 results • Best match
Construction of Boys Hostel and Girls Hostel and its services (Package-II) under EPC mode of contract at IIT, Delhi including comprehensive maintenance for five years
Construction of fourlane of Chausa Buxar Bypass from km 45.000 to km 65.915 (Package-2) of NH-319A in the state of Bihar on EPC mode
DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF JOHKASOU MICRO STPs INCLUDING 5 YEARS OPERATION and COMPREHENSIVE MAINTENANCE CAMC AT BGF ACCOMMODATION OF 7 ICPs UNDER LPAI EPC Mode.
Widening to 2 Lane with Paved Shoulder of Raipur-Jassakhera section (Km 0.000 to Km 29.770) of NH-458 on EPC mode in the State of Rajasthan
Improvement to two lane with paved shoulder from Ramnagar to Roseda from (Km 3.500 to Km 43.000) of NH-527E on EPC mode in State of Bihar.
Construction of 6 lane NH-344M - Package 2 (From Karala-Kanjhawala Road Km 15.000 to Nangloi Najafgarh Road Km 28.450) in State of Delhi on EPC mode
Construction of Additional structures including approaches in Vadodara Surat section of NH48 between existing Km. 108.000 to Km. 250.000 in the State of Gujarat on EPC Mode
Additional works (2VUPs, MR-10 junction flyover and underpass) in Six lane Indore-Dewas section of NH-52 in the state of Madhya Pradesh on EPC mode
Construction of ROB at Project Ch. 146.533 of NH-56 (new NH-731) along with its approaches and associated slip roads on EPC Mode in Uttar Pradesh
Construction of Elevated Structure at Raniwara Circle Sanchore town of Gandhav Sanchore Section of NH68 in the state of Rajasthan on EPC mode under NH(O) Scheme
Four laning of Katni-Bypass of NH-7 old from km 359.500 to km 378.500 length 20 km in the State of Madhya Pradesh on EPC Mode
Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode
CS for AE for Upgrad of Yagyi Kalewa sec milepost 40 0 to milepost 115 5 in Myanmar to Two lane with earthen shoulder on EPC Mode.
Construction to 2 lane with paved shoulder realignment/Bypass Balotra to Sanderao via Jalore Section Package-lV (By pass package) on EPC Mode in the State of Rajasthan.
Construction of 6 lane NH-344M Pkg 3 From Nangloi Najafgarh Road Km 28.450 to Dwarka Sector 24 Road Km 38.111 in State of Delhi on EPC mode.
Authority Engineer Services for Construction of VUP at Km 26.100 (Village Khalal) and Upgradation of Ahmedabad Godhra NH-47 from Km 60.000 to Km 105.000 on EPC Mode.
Construction of Additional Structures on Six Lane Gurgaon Jaipur Section of NH48 between Km 42.700 to Km 273.000 in the states of Haryana and Rajasthan on EPC Mode
Upgradation of existing Four Lane Ahmedabad Godhra Highway from Km 60.000 to 105.000 L-45 Km sec of NH-47 in the state of Gujarat on EPC mode
Const. of 6L EC from KM 12.695 to KM 14.100 in Kuwarbav sec of NH166 Descoped work of Ratnagiri Package1 in the state of Maharashtra on EPC Mode
4 laning of Sagar Mohari section of NH 934 from Design Chainage 8.000 to 50.300 under BMP Phase I Economic Corridor category on EPC mode in Madhya Pradesh
Construction of Four laning of Rajauli Bakhtiyarpur section from Km 47.723 to Km 54.405(Package I) of NH31 (New NH20) on EPC mode in the State of Bihar.
Construction of New Building for Integrated Facilities of Office Training Complex for ISTM and Office Accommodation for DoPT at Old JNU Complex New Delhi under EPC Mode 1.
Construction of New 2-lane Major Bridge Including Approaches Over Brahmaputra Between Majuli on North Bank and Jorhat on South Bank in the State of Assam on EPC mode
Additional Works on Six Lane Jaipur Kishangarh Ajmer Beawar section of NH 48 NH 448 and NH-58 (Old NH-8) in the states of Rajasthan on EPC Mode
Two Laning with paved shoulder from km. 0.000 to km. 45.878 of Aurad-Bidar Section of NH-161A under Bharatmala Pariyojna in the state of Karnataka on EPC mode
Construction of Four lane Nagpur-Katol Section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra under NH (O) on EPC Mode
Construction of 4-Laning of Puruliya Bypass section from Km 84.030 to Km. 94.345 of NH-32 (length 10.315 km.) in the state of West Bengal on EPC Mode.
Six laning of Kagal Satara section of NH48 (old NH4)Package I from km 592.240 to km 658.000 in Maharashtra to be executed on EPC mode under Bharatmala Pariyojana
Balance Works for Four Laning of Vikravandi to Sethiyathope Section (from Km 0.0 to Km 65.96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC Mode
Construction of flyover at Rau circle at Km 12.600 (from design km 11.700 to Km 12.920) in Indore Dewas stretch in the state of Madhya Pradesh on EPC mode
Remodelling of Kailash Nagar Drain from RD 0m (Outfall point at Trunk Drain - 1) to RD 1482 m (Outfall point at MCD Pumping station Kailash Nagar) through EPC mode basis.
Construction of 6-lane Flyover at Ainthapali junction and a 2-Lane ROB (LHS) on NH-53 (Old NH-6) in Sambalpur on EPC mode in the State of Odisha
Construction 4 lane ROB in Lieu of LC no. 9 between Piska More to Palma Section at Km.14.370 of NH-23 on EPC mode in the State of Jharkhand
Balance 11.96 km. stretch between Km.66.000 to Km.77.960 on NH-12(New NH-45) in Nauradehi Wildlife Sanctuary in the State of Madhya Pradesh on EPC Mode Basis
Construction of balance works as part 2 two numbers of interchanges of Jaipur Ring Road NH148C from Tonk Road NH52 to Ajmer Road Section NH48 in Rajasthan on EPC mode.
Strengthening and improvement of Gorakhpur Kasia UP/Bihar Border Sec of NH27 from Ch. Km330.002 to Km 366.117 (TL 36.115 Km)on EPC Mode in the state of Uttar Pradesh
Construction of 04 no. of Additional Structures on six lane Gurgaon-Jaipur section of NH-48 between km 42.700 to km 107.100 in the State of Haryana on EPC Mode
Construction of Mitigation Measure structures on CH-MH Border to Wainganga Bridge Section of NH-6 (New NH-53) in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode
Six Laning of Paravoor (Design Ch. 417.000) - Kottunkulangara (Design Ch.454.500) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana
Six Laning of Thuravoor (Design Ch.378.612)-Paravoor (Design Ch.417.000) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana
Balance work for Const. of 8L access controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section)in Gujarat on EPC mode Pkg VIII
Construction of 4-lane Elevated Section and at-grade improvements at Begusarai town section of NH31 from design Chainage 221.047 to 225.302 in the State of Bihar on EPC Mode
Four Laning of Akola to Medshi from Km 0.000 to Km 47.700 (Design Chainage) of NH161 including Bypasses at Patur and Medshi in the State of Maharashtra on EPC mode
Widening of existing two lane to four lane of Suratgarh-Sri Ganganagar section from Km. 175.000 to Km. 250.900 of NH-62 in the State of Rajasthan on EPC mode.
Redevelopment of GPRA Colony at Sarojini Nagar, New Delhi - SH Construction of Type VI Qtr (998 Nos), Community Hall-7, including allied works on Design, Engineering, Procurement and Construction (EPC) basis including Operation and Maintenance for five years (PKG - IXB)
Rehabilitation and Upgradation to 2LPS configuration of Koyyuru to Chaprathipalem section of NH-516E in the State of Andhra under GNHCP with the loan assistance of World Bank on EPC mode.
Rehabilitation and Upgradation to 2L configuration of Hamirpur-Karnohal Section of NH - 70 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode
Construction of 2 lane Greenfield highway from km 134.737 to Km 163.253 Sagar Link Road Berkhedi Sagar Stage 1 under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode.
Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli-Prayagraj section of NH-30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd)
Construction of Foot Over Bridges in Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode