Loading…
Loading…
1,111 results • Best match
2-lane with Paved shoulder of Ujjain Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH 552G in Madhya Pradesh on EPC mode.
Construction of two lane with paved shoulder of Ghatol Bypass from km 133.250 to km 140.950 of NH-56 (old NH-113) on EPC mode in the State of Rajasthan
Construction of balance works as part 2 two numbers of interchanges of Jaipur Ring Road NH148C from Tonk Road NH52 to Ajmer Road Section NH48 in Rajasthan on EPC mode.
Rectification of Accident Black Spots at Km. 190.720 (Hindoli) Junction and Km. 200.890 (Sathur) Junction with NH 148D on Deoli Kota section in the State of Rajasthan on EPC Mode
Construction of 04 no. of Additional Structures on six lane Gurgaon-Jaipur section of NH-48 between km 42.700 to km 107.100 in the State of Haryana on EPC Mode
6 Laning of de scoped work of Chittorgarh Udaipur section of NH 27 from km. 269.650 to km. 270.900 near Village Vana, in the state of Rajasthan on EPC mode
Construction of High Level Bridge across Reiver Banas between Didyach and Deoli on MDR 182 (SWMDhamoon Kalan Bilopa Ekra Binjari CRB Deoli Sarsop Road) in Sawai Madholpur on EPC Mode
Improvement of Riding Quality of road from Km. 4/500 to Km.11/0 of NH-114 (New NH-125) Jodhpur-Pokran road in the State of Rajasthanon EPC mode.
(ii) 4 lane divided carriageway from km 0.000 Km. 144.200 of NH-15 (New NH-68) to km 21.042 (Km. 160.700 of NH-15 (New NH-68)) Barmer Bypass of NH-15 (New NH-68) on EPC mode in the State of Rajasthan.
CONSTRUCTION OF LIMITED HEIGHT SUBWAY (LHS)/RUB NEAR PROPOSED AT KM 503/0-1 (LC NO-85) ON NH-89 (AJMER NAGAUR SECTION) IN THE STATE OF RAJASTHAN ON EPC MODE
NIT for Rate Contract for Development, Financing, Construction, Equipping, Operation and Maintenance of Canteen and Cafeteria in outer area of RUHS Hospital, Jaipur on PPP-EPC Mode under Build-Operate-Transfer
CONSTRUCTION OF 2L - PS CONFIGURATION KARAULI BYPASS ON NH-23 UNDER ANNUAL PLAN 2024-25 ON EPC MODE IN THE STATE OF RAJASTHAN (JOB NO. NH-23/RJ/2024-25/865)
Widening / Strengthening/ reconstruction / overlay work on Wajawana - Banswara section at Design ch. 242/000 to 264/370 (on selected stretches) on NH-927A in the State of Rajasthan on EPC mode.
Selection of bidder for collection of user fee on Jodhpur-Marwar Junction-Jojawar SH-61 and 61A Length Km 119.095 under RSHDP-II On EPC Mode in the state of Rajasthan
Strengthening of NH-248A Shahpura - Alwar road Section from Km 48/700 to 62/00 on EPC Mode (Total 13.300 Km) in Rajasthan (Job No. NH-48A-RJ-2019-20/741)
Construction of 4-lane major bridge on Ghaghar river including approaches at km. 176/090 of Suratgarh -Sri Ganganagar section of NH-62 in the state of Rajasthan on EPC Mode
Construction of Foot Over Bridges in Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode
Initial improvement works under Tolling Operation and Transfer of Chittorgarh Bypass to Kota Section (from km 891.929 to km 1052.429) of NH 27 in the State of Rajasthan on EPC Mode
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border SH:- Lateral & Axial Road, Barmer Sector, Package-I, including 5 years maintenance (On EPC Mode).
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH :- Lateral road, Jaisalmer South Sector, Package - IV) including 5 years maintenance (On EPC Mode).
Construction of Lateral & Axial roads in the state of Punjab & Rajasthan along the Indo - Pakistan Border. (SH :- Lateral road, Jaisalmer South sector, package-II) including 5 years maintenance (On EPC Mode).
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH :- Lateral road, Jaisalmer North sector, Package-I) including 5 years maintenance (On EPC Mode).
Construction of Lateral and Axial Roads in the state of Punjab and Rajasthan along the Indo -Pakistan Border (SH:Lateral Road, Barmer sector, package-II, including 5 years maintenance on EPC mode).
Widening/Strengthening/Up-gradation to two lane with paved shoulder from existing chainage Chainage 148/170 (Junction with NH-8) to 211/100 (Deval-Dungarpur- Hirata- Varda- Sagwara) Section of NH-927A in the State of Rajasthan on EPC mode.
Purchase of Real time pcr lab with accessories on turn key basis
Construction of VUP at Km. 173 130 RICCO Junction for permanent rectification of blackspot ID RJ 06 33 on Nagaur Bikaner section NH 62 in the state of Rajasthan on EPC Mode
PMC SERVICE OF WORK CONSTRUCTION OF PROPOSED 2 LANE ELEVATED ROAD ON LATIYA NALA IN SAWAIMADHOPUR FROM RAJ BAGH TO SH-30 (GOPALJI TEMPLE) IN THE STATE OF RAJASTHAN ON EPC MODE
CONSTRUCTION OF 2L PS CONFIGURATION GANGAPUR CITY BYPASS ON NH-23 UNDER ANNUAL PLAN 2024-25 ON EPC MODE IN THE STATE OF RAJASTHAN (JOB NO. NH-23/RJ/2024-25/866)
Construction of 4 Lane ROB on Bhatinda- Suratgarh Railway Section (LC No. C-85, Km 125/2-3) on Hanumangarh Suratgarh Road (SH-94) on EPC Mode in The State of Rajasthan
Constr. of Additional Structures of 12 Nos Grade Separator VUP LVUP CUP on Rajasthan Border Fatehpur Salasar Sec of NH-52 and NH-58 on EPC Mode in the State of Rajasthan
Construction of Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
2-lane with Paved shoulder of Ujjain-Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH-552G in the state of Madhya Pradesh on EPC mode
Construction of Six lane access-controlled Highway from Km 0.000 to Km 40.080 (Paniyala to Mator Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH:- Axial road, Jaisalmer South Sector, Package - V(A)) including 5 years maintenance (On EPC Mode).
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH:- Axial road, Jaisalmer South Sector, Package - V(B)) including 5 years mainntenance (On EPC Mode).
Construction of Lateral and Axial Roads in the state of Punjab and Rajasthan along the Indo-Pakistan Border (SH: Lateral Road, Barmer sector, package-III, including 5 years maintenance on EPC mode).
Periodical renewal work and incident management services IMS from Km 180 500 End of Nagaur Bypass to Km 267 500 Netra Village of NH 62 in the state of Rajasthan on EPC mode
Engagement of user fee agency on the basis of EQ through etender for 8Lane Delhi Vadodara Expressway from km 0.000 to km228.748 on NH No. NE4 in Haryana and Rajasthan on EPC Mode
Construction of RE Wall in the approaches of LVUPs from Km 171.706 to Km 172.097 of NH62 in Suratgarh town on EPC mode under Annual Plan 2023 24 in the state of Rajasthan
Construction of Eight Lane access-controlled Expressway from Rajasthan MP Border to Jodmi village of Mandsaur district section of Delhi-Vadodara Greenfield Alignment under BMP in the State of MP on EPC mode
Rectification of MoRTH identified blackspots at 05 locations at Nindar Mod,Bhojlawa, Hadota, Udaipuria and Manda Mode on Jaipur Reengus Sikar section of NH 52 in the state of Rajasthan on EPC Mode
Engagement of user fee collection agency on the basis of CB through etender for Chhoti Villor FP at km 8.400 for Sanchore- Dhnera Deesa section in the state of Rajasthan on EPC mode
Four Lanning of Karwar (Km. 281.980 of NH 62 Nagaur road) to Dangiyavas section Package-II (design length 30.093 km) of Jodhpur ring road in Rajasthan on EPC Mode under NHDP Phase-VII
Construction of Eight Lane access controlled Expressway starting near Start of RoB (Ch.214.260-247.310) section of Delhi-Vadodara Green field Alignment on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH:- Lateral & Axial road, Jaisalmer North Sector, package - II) including 5 years maintenance (On EPC Mode-I).
Construction of balance work of ROB at km 30.00 of NH162E Pali Nadol section crossing Falna Marwar Railway section at LC no C67 near Somesar in the State of Rajasthan on EPC mode
Supply and Installation of IT and electronic equipment for ASTI on turn key
Supply of Turn-key solution for Centre of Excellence in Industry 4.0 Technologies
Construction of VUP at Km 114.000 134.000 AND LVUP at Km 114.800 129.490 172.280 of NH58 Beawar Gomti section in the state of Rajasthan on EPC mode in Road Safety Annual plan 2022 23
Construction of lateral and Axial Roads in the of Punjab and Rajasthan along the Indo-Pakistan Border (SH: Lateral and Axial Roads, Jaisalmer North Sector,Package-III including 5 years maintenance on EPC mode)