Loading…
Loading…
25,858 results • Best match
Consultancy Services for Authoritys Engineer for supervision of Improvement and up-gradation of newly declared NH-227B (84 Kosi Parikrama Marg) PKGII Design Km 29.000 (Sarpur) to Km 47.878/47.800 (Gosaiganj) on (EPC) basis in the State of U.P.
CS for AE for Supervision of Construction of Standalone Flyovers and ROB on stretches of NH 31 NH 31C NH 36 and NH 37 in the state of Assam under BMP (Pkg-1 and Pkg-2) on EPC Basis
Consultancy Services of Authority Engineer for Improvement and Up-gradation of NH-734 section of Moradabad-Kashipur on EPC basis in the state of UP-UK (i) Pkg-I Moradabad Bypass and (ii) Pkg-II Moradabad and Kashipur bypasses
Authority Engineer for Construction Supervision including Implementation of RAP for NH 127B from Km. 0.000 (End point of Dhubri-Phulbari bridge) to Km 63.224 (Goeragre) in the State of Meghalaya on EPC basis through JICA ODA Loan Phase-VII
Construction of various buildings for Central Sanskrit University at Puri i/c Civil, Electrical and Mechanical services on EPC basis. SH-Providing Service of Computer Operator in Office of Assistant Engineer (Elect)-I under EE(E), BBSR, CPWD, Bhubaneswar.
Construction of BOPs Border Out Post at Lakhpatwari, Dafa G 33 G 39 and Vishnubet including Jetties approach Roads Culverts OP towers Dredging and erosion control measures including all civil electrical and mechanical works services on EPC basis Subwork/Packages: Three
Refer SBD for description
Operation, maintenance and monitoring of construction power supply of ETPS Expansion Project for a period of Six months from the date of taken over of site or till the date of award of EPC contract, whichever is earlier.
Widening and Upgradation to 2-lane with paved shoulder of Balance Work of NH- 301 Kargil Zanskar Road from Design km 6.000 to km 30.040 of 24.040 Km length in the Union Territory of Ladakh on EPC mode
EPC
C/o 572-Seater Student EWS Hostel (Phase-1) Including Internal EI, HVAC, Firefighting, Electrical Substation, DG Set, Lift Installation & Development Works on EPC Basis at Vigyan Kunj, IIT Roorkee, Roorkee Uttarakhand. Subwork/Packages: SH: Providing Services of Computer Operator and MTS for IIT Roorkee Project Division-1, Roorkee.
Construction, Fabrication and Installation and Commissioning of Jaggery making plant(Gur Bhatti) On Turnkey Basis
Appointment of EPC contractor for the design as per site conditions erection testing commissioning of Grid Tied Roof top Solar Photo Voltaic (SPV) Power plants on the roof of various Schools and Govt offices in Kattakada Legislative Assembly
Construction of Barrage cum Bridge ISS across river Bheden near village Budharaja in Sambalpur district of state of Odisha including all components of the project on EPC turnKey basis including maintenance for five years
Strengthening of Road from km 36 to 43 Km 51 to 55 and Km 72/2, To 72/4 Total Km 13.40 of NH-12A Extn. Damoh-Heerapur Road in the State of Madhya Pradesh on EPC mode Under NH Division Sagar in the state of Madhya Pradesh
Strengthening and Reconstruction of NH 154 from Km 67/600 to Km 88/225 in the district of Hailakandi in the State of Assam under Annual Plan 0f 2020-21under karimganj NH Division on EPC mode in the State of Assam, Job No 154/AS/2020-21/217
Development to 4/6-lanning of NH-31 New NH-10 with both sides service roads from km 569/258 to km 581/030 End of AH-02 on NH-31 near Shivmandir to Sevoke Army Cantonment in the districts of Darjeeling and Jalpaiguri, West Bengal on EPC Mode
Strengthening and Reconstruction of NH 154 from Km 67/600 to Km 88/225 in the district of Hailakandi in the State of Assam under Annual Plan 0f 2020-21under karimganj NH Division on EPC mode in the State of Assam, Job No 154/AS/2020-21/217.
Strengthening of Ambikapur Ramanujganj Garwa Road N.H 343 from Km. 58/8 to 59/8 and Km. 61/6 to 65/10 (Intermediate Lane) and from Km. 59/10 to 61/4 and Km. 66/2 to 81/6 (2 Lane) in the state of Chhattisgarh on EPC mode
Slope Stabilization Works Km 6.00 on Road TCC Maza 04 Kms Galensinia Bridge Km 6.00,Km 31.00 on Rd TCC Taksing,Reddi Zigs and Km 22.10 on D T Rd including preparation of design Its Proof Check from IIT under 23 TF under P ANK of A.P. EPC Mode
CONSULTANCY SERVICES FOR AE OF THE WORK OF WIDENING AND STRENGTHENING TO 2 LANE WITH PS FROM EX CH 56_720 TO 100_820 AND DESIGN CH 62_600 TO 106_360 (TOTAL LENGTH is 43_760 KM) SBU NH 1 ON THE UT OF JAMMU AND KASHMIR UNDER BEACON BRO ON EPC MODE.
CS for AE for Const. of 6lane elevated flyover inclu. reconst rehab of exist pavement Km 406.100 to Km411.150 L5.05 Km at Gobindpur and Km 426.230 to Km 430.500 L4.27 Km at Nirsa in the Barwa Adda Panagarh sec NH19 in WB on EPC Mode under NH O
CONSTRUCTION OF 2 LANE ROB AT RAILWAY CROSSING NO C 28A ON ABOHAR FAZILKA RAIL SECTION AT KM 39 3 4 NH 07 AT KM 12.560 ON FAZILKA BORDER IN THE STATE OF PUNJAB ON EPC MODE JOB NO NH 07PB 2021 22 549 DATED 16 12 2021
SSI, DESIGN, DRAWING AND CONST 70 MTR SPAN MAJ PMT HURI BR STEELSUPER STRUCTURE WITH FOOT PATH THROUGH TYPE OVER OPEN FOUNDATION) KUMEY RIVER INCLU APPROACH RD KM 64.250 ON ROAD H-S-H (HURI AXIS) UNDER 85 RCC, 756TF, P ANK IN A P THROUGH EPC MODE
Consultancy Services for preparation of Detailed Project Report for Widening to 2-lane with paved shoulders and Strengthening from Km. 8/0 to 25/0 of Sironcha to Mahadevpur Section of NH-353C in the State of Telangana under Annual Plan 2021-22 on EPC Mode...
Improvement to 2 lane with paved shoulder of NH-40 section from Km 81.740 to Km 93.490 Improvement to 4 lane section of NH-44 from design Km 0.000 to Km 0.930, total length 11.600 Km in the state of Meghalaya on EPC mode under JICA Loan Assistance
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF (FS) AND (DPR) ON EPC MODE FOR CONST RD TAPA-HUSH-DILLE GG (NEW ALIGNT) KM 0.00 TO 58.00 (NET LENGTH 58.00 KM) GREEN FIELD ALIGNT TO NHSL SPECIFICATIONS IN THE AOR OF 85 RCC UNDER 756 TF P ANK IN A.P
CONSULTANCY SERVICES FOR AUHORITY ENGINEER PMC FOR SUPERVISION OF Construction of 1 ROB AND 3 Flyovers of N H No 730 at the section from Km 133.230 to Km 134.330, Km 134.550 to Km 135.650, Km 136.200 to Km 137.800 under EPC mode in the State of UP
ENGAGING TECH CONSULT FOR PREP OF (FS) (DPR) ON EPC MODE FOR CONSTRUCTION OF RD NACHO-BANGTE-NEYING (NEW ALIGNMENT) AT KM 0.00 TO KM 57.00 (NET LENGTH 57.00 KM) GREEN FIELD ALIGNT TO NHSL SPECIFICATIONS IN THE AOR OF 77 RCC UNDER 23 TF P ANK IN A.P
Widening and Strengthening to four lane of Gorantla Hindupur section of NH 716G from km 120 300 Design Chainage to km 153 880 Design Chainage Package 03 under NH O under Annual Plan 2022 23 on EPC mode in the State of Andhra Pradesh A P 2022 23
Strengt and Rectification of accident prone loc for Rd Safety at km 24.2, 25,25.5 of Reddy zig and River Training wrks at km 27.2 on rd TCC under 128RCC/23TF under (P) Ank in Upper Subansiri Distt of A. P through EPC mode (Job No. 106/102/Ark)
4 laning of Hisar to Dabwali Sec of NH-10 from Km 170.000 to Km 227.000 with paved shoulder in the State of Haryana on EPC Mode. Pkg-I-Construction of service road from Km. 217.900 to Km 218.300 BHS at Hanspur Chowk on Fatehabad bypass 2nd Call
Special repair of Bed Protection work of Major Bridge on Ghaggar River at Ch.175.854 On Yamunanagar-Panchkula section of old NH-73 (New NH-07) from Km. 157.192 to km.176.400 on EPC mode under NHDP Phase-III in the State of Haryana (Pkg-3) (2nd Call)
Const. of LVUP at Ch.286.680 with Sr.Road on NH18 at Phuldungri and VUP at Ch.332.518 in front of Baharagora Bus Stand on NH18 and Flyover at Ch.218.957 with Sr.Road at merging point of NH-43 and NH-32 (New NH-18) in Jharkhand on EPC Mode
Construction of 6 Lane Grade Separated structures along with SR ITC Junction in Kurnool Town Kambalapadu Junction Dhone Dhone Exit Dhone and SR from Km 204.800 to Km 205.800 Both Sides RHS Both Sides on NH 44 old NH 07 in the State of AP on EPC mode
Strengthening of Service Road near Kapashi village from km 11.400 to km 12.740 and Patur Bypass stretch from km 26.430 to km 27.890 on NH-161 and near Paras Phata from 271.200 to km 272.200 on NH-53 in the state of Maharashtra on EPC mode (2nd Call)
CS for AE for Supervision of Development of 6-lane access controlled in Delhi and UP portion of Delhi-Saharanpur Highway from Akshardham NH-9 Junction to EPE Junction (Ch.0.000 to Ch.31.600) in Delhi and UP on EPC mode under EC in phase-1 of BMP
AE Ser for Const. of Flyover for LT Recti. of 4 MoRTH Identified BS at Jolhupur junc at Km.1534.215 Chaura Bakra Mandi at Km1544.300 Patel Chowk junc at Km1556.285 n Premium Factory Kota junc at Km1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
CS of 2L VUP at Mukundpur junc 4L VUP at Lahra Mod junc 4L VUP at Eglas Chauraha junc 4L VUP at Kota Kapura junc 4lane VUP at Poiya junc and 4L of Malupur Tiraha as part of Rectification of MORTH identified BS in UP on EPC Mode
Permanent Rectification of Black Spot TN-02-246, TN-02-387, TN-02-533 and TN-02-266 by constructing a LVUP at Km 209 475 (Nallikalpatti Junction) in the project of Thumbipadi - Salem - Namakkal section of NH 44 in the state of Tamil Nadu on EPC Mode
CS for AE for SC of four laning of NH-965 G from (a)Patas-Vasunde Phata-Baramati and Baramati Length 41.369 km (Package-I) (b)km 41.369 to km 83.500 (Package-II) and (c)km 83.500 to km 130.202 (Package-III) in Maharashtra under BMP on EPC mode
Construction of (i) VUP at Rajupalem Cross Road at Km.1185.665 (Black spot ID AP-(03)-169-BS) (ii) LVUP at Jonnathali cross road at km 1191.787 (Black spot ID AP-(03)-170-BS) on Chilakaluripeta-Nellore Section of NH-16 in the State of AP on EPC Mode.
CS for AE for Development of 6 lane GF (Pkg-IIA) starts from Ch.23.325-ch.32.090 around Kanpur city (8.765 kms) and Development of 6L GF (Pkg-IIB) starts from Design Start from Ch.32.090-Ch.51.200 around Kanpur city (19.110 kms) in UP on EPC mode