Loading…
Loading…
25,858 results • Best match
Construction of 84 no. T-III, 28 Nos. T-IV and 28 Nos. T-V quarters including IEI and Fans fire fighting fire alarm system and Development work at AIIMS Raebareli on EPC basis SH-Providing safety grill to Old well near T-III block.
KTPP-Stage-II(1x600MW)-Execution of balance Electrical & Mechanical works of 1MLD (1000Cum/day) capacity Sewage Treatment Plant (STP) including Design, Supply, Construction, erection, testing and commissioning etc., complete on EPC basis at Kakatiya Thermal Power Plant, Chelpur(V), Ghanpur(M), Jayashankar(Bhupalpally) Dist., Telangana.
Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase A in the state of West Bengal (Package IV B) 2ndCall
Widening and strengthening of existing carriageway to two lane configu.in the stretch from Km.0.000 to Km.13.000 (excluding rigid pavement portion from Km. 3.100to5.100)and C/O Major Bridge at river Aami on NH-328A in the state of U.P. on EPC Basis
Improvement and Upgrade of NH734 sec of Moradabad Thakurdwara Kashipur including Moradabad and Kashipur bypasses on EPC basis in UP and UKD PKG-I Moradabad Bypass Length 33.724 km Start from Ch.0.00 Km.144.381 of NH24 and ends at Ch.33.724 Km.167.790
Construction of Flyover at Mandi Gobindgarh at Design km 0.350 existing km 260.800 including resurfacing of existing Service Road at location of flyover at km 260.800 on Jalandhar Panipat Section of NH 44 old NH 01 in the State of Punjab on EPC basis
Engagement of user fee agency CB at Paraghat Toll Plaza Km 138.500 of NH200 (New NH49) Vill Paraghat Bilaspur District of Chhattisgarh under the work Rehab and upgrade of NH200 (New NH49)to 2/4 lane with paved shoulder on EPC basis in Chhattisgarh
C/o Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH: Providing office support staff for different activities for smooth running of Jammu Project Zone at CPWD office Satwari and attached Division site office Jagti, Jammu during 2025-26
Contingency of the work- Construction of various buildings for Central Sanskrit University at Puri i/c Civil, Electrical and Mechanical services on EPC basis. SH- Providing and running inspection vehicle on hiring basis for O/o the Assistant Engineer (E)-I, BBSR, CPWD, Bhubaneswar.
C/o Main campus of Indian Institute of Technology, Jammu in Phase-1C on EPC basis. SH: Providing office support staff for different activities for smooth running of Jammu Project Zone at CPWD office Satwari and Attached Division site office Jagti, Jammu during 2025-26
Planning, Design and Construction of Income Tax Office Building at Sector-29, Gurugram (Haryana) including all Civil & MEP Services, Horticulture and Development works on EPC Basis. (SH: Providing the services of Office Attendant in the office of Sub-division CPWD Faridabad, Haryana.) (Chargeable to contingency)
Supply and installation of HP Slim Desktop Computer including Quickheal antivirus, 600 VA UPS FOXIN or equivalent, EPSON Scanner V39, D-Link 8 Port Networking Switch, Cannon Copier, Printer Media size maximum A3/A4 on turn-key basis
Loss Reduction Transmission works under KASARGODE district - Reconductoring of 33 kV Mulleria - Badiyadkka Single circuit line from 110 kV Substation, Mulleria to 33 kV Substation, Badiyadkka using Covered conductor on Turn Key contract basis
Construction of SAS Based 2x160MVA, 220/132kV GIS Substation Mawana, Meerut on Turn-key Basis
Carrying out part / part incomplete works pertaining to Mini India comprising of Balance work of Monuments, Pathways, Food Kiosk, Souvenir shops, Development of Plaza, Gate Plaza-01, 10 Nos. Toilet, Testing Commissioning of 200 KLD STP (4 Nos.), 2 ... on EPC Basis
Reconductoring of 7Nos of 11KV lines for a distance of 49.33 RKm in Ankola sub Division of Karwar Division on total turn key and lumpsum basis.
Reconductoring of 7 Nos of 11KV lines for a distance of 28.45 RKm in Bailhongal subdivision of Bailhongal Division on total turn key and lumpsum basis.
Reconductoring of 11Nos of 11KV lines for a distance of 49.10 RKm in Karwar Sub Division of Karwar Division on total turn key and lumpsum basis
Reconductoring Of 07 Nos Of 11kv Lines For A Distance Of 29.89rkm In Ramdurg Division On Total Turn Key And Lumpsum Basis.-(reserved For Sc Category)
Reconductoring of 5Nos of 11kV lines for a distance of 19.90RKm in Khanapur Sub Division of Belagavi-Rural Division on total turn key and lumpsum basis.
Reconductoring of 5 Nos of 11KV lines for a distance of 25.03RKm in Honnavar sub Division of Honavar Division on total turn key and lumpsum basis.
Reconductoring of 13 Nos of 11KV lines for a distance of 38.66Km in Gadag Division on total turn key and lumpsum basis.-(Reserved for CAT-I)
Reconductoring of 15 Nos of 11KV lines for a distance of 19.17RKm in Ron Division on total turn key and lumpsum basis.-(Reserved for SC Category)
Reconductoring of 5 Nos of 11KV lines for a distance of 21.24Km in Tikota sub Division of Vijayapur Division on total turn key and lumpsum basis.
Reconductoring of 6 Nos of 11KV lines for a distance of 27.25RKm in Mudalagi Sub Division of Ghataprabha Division on total turn key and lumpsum basis.
Reconductoring Of 10 Nos Of 11kv Lines For A Distance Of 23.49rkm In Bailhongal Division On Total Turn Key And Lumpsum Basis.-(reserved For St Category)
Reconductoring of 3 Nos of 11KV lines for a distance of 25.40RKm in Haveri Sub Division of Haveri Division on total turn key and lumpsum basis.
Reconductoring of 5 Nos of 11KV lines for a distance of 21.09RKms in Naad Section Of Indi subdivision in Indi Division on total turn key basis.
Reconductoring of 14 Nos of 11KV lines for a distance of 11.63 RKm in Dharwad CSD1 of Dharwad Division on total turn key and lumpsum basis.
Construction of 22 nos of 11kV link lines for a distance of 75.54 Rkm from various sub stations in Haveri division on total turn key basis.
Construction of Effluent Treatment Plant as Liquid Waste Treatment and Disposal Plant in Sivasagar Civil Hospital at Sivasagar District under NHM, Assam on Turn Key Basis
11 KV/LT Lines Reinforcement Work under Additional Business Plan 2023-24 (339 Crore) in the area of EDD-III, Mathura on Semi Turn-Key Basis
Work for shifting of lines and other associated work during road widening of PGSY-3 on Semi Turn Key Basis under jurisdiction of EDD-khaga Fatehpur
Appointment of specialized agencies for Site finalization, and Commissioning of turn -key Integrated Biogas Systems, including comprehensive maintenance and operations for a period of two years.
Various electric work against Business Plan 2023-24 for quality power supply in Aligarh Rural on Semi Turn-key Basis under the area EDD-II Aligarh.
Supply, erection and commissioning of LT ACB 800 Amp. for 160 KVA to 400 KVA DTRs under EDSD, Selaqui under EDD, Mohanpur on Turn Key Basis.
Various electric work against Business Plan 2023-24 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDD-4 Aligarh
On Turn Key Basis Construction of Dudiyan Ghat Tank (Without canal) on local nalla, as per details in scope of work but not limited to that.
Work for shifting of lines and other associated work during road widening of PGSY-3 on Semi Turn Key Basis under jurisdiction of EDD-I Fatehpur
Turn Key Project including Cathlab with various equipment and pharmacy furniture for Matoshree Indirabai Baburao Sarnaik Hospital, Nalpada of public health department, Thane Municipal Corporation, Thane.
27-PROVISION FOR MAKING COMPLETE FHTC OF HANDPUMP SCHEME VILLAGE KESHUVILAS , GP-LAXMIHEDA, UNDER JJM, TEHSIL- BIJOLIYA, DISTT- BHILWARA ON SINGLE POINT RESPONSIBILITY TURN KEY BASIS
For G-20 Meeting the work of Repairing damaged and arranging and securing electrical installations, transformers and painting of eclectic poles etc.(Semi Turn-Key Basis)
CONSTRUCTION OF 1X5 MVA 33/11 KV SUBSTATION, 33 KV LINE AND 11 KV LINE FOR NEAR DEGREE COLLAGE CHANDAULI, DIST.- CHANDAULI ON SEMI TURN-KEY
Work for shifting of lines and other associated work during road widening of PGSY-3 on Semi Turn Key Basis under jurisdiction of EDD-II Fatehpur
DYUTHI SPECIAL PACKAGE No. 02 - ECONDUCTORING AND CONVERSION OF LT BARE OH LINE USING LT ABC 70 sq.mm ON TURN KEY BASIS UNDER LECTRICAL CIRCLE, TIRUR
Providing laying of Rising main , distribution system , installation of pumping machinery, and construction of civil structure complete job of WSS Chambitrar ( On turn key basis) (NRDWP)
Shifting of 11 KV and LT Line in Semi Turn-Key basic from Gandhi Chauk to Kasia Bus Stand in Jama Yojana under EDD Kasia, Kushinagar
For the work of operation and Annual Maintenance and repairing of all equipments of Automatic Meter Test Lab Gailana Road, DVVNL Agra on Turn Key Basis
District wise Implementation of LED Street Lighting System in 3 (three) Village of each Gram Panchayat (GP) of Puri District in Odisha on Turn-Key basis
District wise Implementation of LED Street Lighting System in 1 (one) Village of each Gram Panchayat (GP) of Jajpur District in Odisha on Turn-Key basis.