Loading…
Loading…
25,038 results • Best match
Strengthening work from Km 149.000 to Km171.000 on NH-87 Extn.(New NH-109) in the state of Uttarakhand under NH(O) on EPC mode
PROVN OF STANDALONE STRUCTURE FOR PATIENT WAITING AREA WITH ANCILLIARY SERVICES AT AH RR ON EPC MODE UNDER GE E/M RR HOSPITAL, DELHI CANTT
Deep drilling, development and stabilization of 200 mm dia tubewells (on EPC Mode) upto 100 mtrs BGL or beyond by using ODEX Method of Drilling
CONSTRUCTION OF INTERNAL ROADS ESTATE PUBLIC HEALTH SERVICES AND CAMPUS LIGHTING INTERIM AIRPORT TERMINAL AT HALWARA IAF STATION EPC MODE DISTT LUDHIANA PUNJAB BALANCE WORK
Construction of H.L. Bridge with approach road over river Brahmani on Silling to Talapada in the District of Angul under State Plan on EPC Mode
Deep drilling, development and stabilization of 200 mm dia tubewells (on EPC Mode) upto 130 mtrs BGL or beyond by using ODEX Method of Drilling
Notice Inviting Bids for Empanelment of Authority Engineer for Project Management for construction of building works more than 50 crores under UPPWD on EPC Mode
Strengthening to NH 326 From Km253.700 to Km 281.700 Laxmipur To Kakriguma for the year 2019 20 in the state of Odisha on EPC mode
SLOPE PROTECTION AT SUBHAIGADHERA NALLA SITE AT EXISTING CHAINAGE KM 20.05 ON JOSHIMATH MALARI ROAD NH 107B THROUGH EPC MODE IN THE STATE OF UTTARAKHAND
PMC work for Construction of Residential and Non-Residential Buildings Of 05Th Vahini Of UP Special Security Forces At Saharanpur UP India on EPC Mode
Construction of 2-lane road Railway under Bridge (RUB) connecting Mahalgaon to Harishankarpuram in Gwalior city in the State of Madhya Pradesh on EPC mode.
Setting Up of Inspection and Certification Center including Operations for 2 Years and Annual Maintenance Contract for 5 Years in Leh, Ladakh on EPC Mode
Consultancy Services for Authority Engineer for Supervision of Fly-overs/RUBs/ROBs in the state of Madhya Pradesh on EPC Mode under MPRDC (2nd Call)
Strengthening of road in Km. 176.200 to 197.200 (Section Vikramgad to Manor) section of NH-160A Sinnar - Ghoti - Trimbakeshwar - Jawhar - Palghar Road under EPC mode
Construction of Foot Over Bridge near Eat Street, Parking Lot-II, Necklace Road with O&M of two years in Hyderabad City on EPC Mode
EXECUTION OF 03 NOS INDIVIDUAL MEGA PWS TO NANDAPUR, DASMANTPUR AND NARAYANPATNA BLOCKS OF KORAPUT DISTRICT INCLUDING FIVE YEARS OPERATION AND MAINTENANCE IN EPC MODE
STRENGTHEING WORK FROM KM 55.550 TO KM 89.000 (length 33.450 km) ON NH 87 EXT (NEW 109) IN THE STATE OF UTTRAKHAND UNDER EPC MODE
Engagement of user fee collection agency on the basis of CB through etender for Ujara Fee Plaza in the state of MP on EPC mode
PMC work for Construction of Dental Department and Apex Centre for Womens Health Building at King George Medical University Lucknow UP India on EPC Mode
Construction of Access Controlled Expressway Connector to Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg from Jalna to Nanded on EPC Mode for PACKAGE JNE 06
Construction of 6 Lane stand alone bridge at Ib river at Kanaktora Jharsuguda Section of NH 49 on EPC Mode in the State of Odisha.
CREATION OF PERMANENT INFRASTRUCTURE FOR CENTRE FOR UNITED NATION PEACE KEEPING CUNPK AT NEW DELHI ON EPC MODE UNDER GE P EAST DELHI CANTT-10
Reconstruction of 06 nos. submersible/narrow/distressed bridges on Jabalpur Dindori section of NH 45 Ext. in the State of Madhya Pradesh on EPC Mode.
Construction of Elevated Road along Railway Road and Bus Stand Road with 10 years of DLP and Maintenance on EPC Mode under Smart City Mission
Consultancy Services for Authoritys Engineer for Supervision of Construction of 2LPS Configuration Gangapur City Bypass on NH23 on EPC mode in the State of Rajasthan
Improvement and Upgradation of NH-727A from Km 88.670 (Rampur bujurg) UP Border to Km 92.992 (Mairwa) Siwan for the year 2024_25 on EPC Mode.
Rehabilitation of NH 01 with ILCB between Km 95.00 to Km 100.841 under 122 RCC Project Beacon in UT Jammu and Kashmir on EPC Mode
CONSTRUCTION OF VUP ON NH62 AT KM 4 915 END OF ROHAT BYPASS ON JODHPUR PALI SECTION IN THE STATE OF RAJASTHAN ON EPC MODE
Construction of Twin 2-Lane (4-Lane) ROB at Km 406 of NH-730 and approaches under EPC mode in the State of Uttar Pradesh
Construction of four lane Bypass to Jeypore town on NH-26 in the state of Odisha on EPC Mode under Annual plan of 2021-22
Selection of Agency for Construction of Material Recovery Facility (Solid Waste Management) at Watergam (100x45 ft) Urban Local Bodies in Jammu Division on EPC Mode
Design Engineering and Procurement of Construction of Transit Hostel 04 Towers of G Plus 12 in Police Line Gonda Uttar Pradesh INDIA on EPC Mode
Construction of additional 2 lane ROB near Hangarahalli from Km 79.830 to Km 80.650 on NH 373 in the State of Karnataka on EPC mode
IRQP work from km 0.00 to 9.300 of NH 133 on EPC mode in state of Bihar (Job No.- NH-133/BR/2023-24/81)
Widening/Development of Existing NH 85 from Km 0.000 to km 124.636 section of NH 85 to 2L/2L with PS section on EPC Mode
Rehabilitation and Strengthening work of Ayodhya-Gorakhpur Section (km. 142.810 to km 252.860) of NH-28 in the state of Uttar Pradesh on EPC mode
Design and Construction of Bridge Over River Jehlum at Mehrajpora Sopore District Baramulla (Balance Work) (Complete Job) on EPC MODE (ENGINEERING PROCUREMEN AND CONSTRUCTION MODE)
Construction of Additional Structures in Kerala/Tamil Nadu Border Kanyakumari section (From Km 43.300 to Km. 96.714) of NH47 in Tamil Nadu on EPC Mode
Construction of Bhandara Gadchiroli Access Controlled Super Communication Expressway in the State of Maharashtra on EPC Mode for Package BG 01 Sawarkheda Gadegaon Expressway link
Construction of Entry-Exit Ramps at ROB km 9.996 on Jind Bypass for rectification of MoRTH Blackspot on EPC Mode in the State of Haryana.
Construction of 4 Nos of Standalone safety structures-works at different locations on various NHs in the State of Maharashtra on EPC Mode 2ND CALL
PROVN OF EFFLUENT TREATMENT PLANT (ETP) / SEWAGE TREATMENT PLANT (STP) AT AH (R R) UNDER GE (U) WATER SUPPLY DELHI CANTT-10 ON EPC MODE
Periodical Renewal from km 0.0 to 10.975 Sangareddy Bypass on Sangareddy Nanded Akola road of NH 161 in the state of Telangana on EPC Mode
Periodical renewal work from km. 0.165 to 17.756 on NH-11 21 Agra-Jaipur-Bikaner road Under EPC mode in the State of Uttar Pradesh.
Construction of 4- Lane Chapra- Manjhi By-Pass Connecting NH-19 and NH-85 on EPC mode in the state of Bihar (Length-7.155 Km)
Periodic Renewals work from Km 577/0 to Km 583/0 of Hubli Krishnapatnam road NH67 in the state of Andhra Pradesh on EPC Mode
Periodical Renewal work in Km. 215.000 to 281.000 Km. 285 of N.H.-76 (New N.H-35) in the State of Uttar Pradesh under EPC Mode
PR from Km 545/150 to 563/400 of NH67 of Hubli Krishnapatnam road in the state of Andhra Pradesh on EPC Mode (2nd Call).
Construction of Bridges at 8th Km of NH-220 for the year 2020-21 in the state of Jharkhand on EPC mode Under NH(O)
Construction of Amethi Bypass (Part-II) at km 30.050 of NH-931 (Design Length-8.178 km) on EPC mode in the state of Uttar Pradesh