Loading…
Loading…
25,040 results • Best match
Construction of High Level Bridge on Indore- Betul Road (NH-59A) at Kshipra River (km. 20/2) in the State of Madhya Pradesh on EPC Mode.
Construction of 2 ROBs at Katai at Diva Panvel Central Railway track and Bhiwandi Kalyan Shil Phata Highway in the state of Maharashtra on EPC mode
Periodic Renewal work in Km 13 to 18 and 22 to 39 of newly declared NH 731K under EPC mode in the state of Uttar Pradesh
One Time Improvement with white topping in Old NH-547E and Old NH-353J passing through Kalmeshwar Town in the state of Maharashtra on EPC mode
Rehabilitation and Up gradation to Four Lane Road from km 70.500 to km 78.600 of NH 92 under EPC mode in the State of Uttar Pradesh
CONSTR OF RD CHUMATHANG CHUSUL BETWEEN KM 0.00 TO KM 25.00 (NET LENGTH 25.00 KM) NHSL SPECS OF UNDER 111RCC 753BRTF PROJECT HIMANK ON EPC MODE
Selection of Agency for Construction of Material Recovery Facility (Solid Waste Management) and compost pit of 03 No ULB at Ramgarh, Thathri, Lakhanpur on EPC Mode
Selection of Agency for Construction of Material Recovery Facility (Solid Waste Management) at Ghou Manhasan (80x45 ft) Urban Local Bodies in Jammu Division on EPC Mode
Strengthening of NH-2 from 0.000 km to 6.000 km during 2019-20 under NH Division No.I Kohima on EPC mode in the state of Nagaland
Authority Engineer Services for The Consultancy and Supervision of Strengthening, Upgradation and Widening of Nandur Shingote - Kolhar Section in the State of Maharashtra on EPC Mode
Construction Of Two Lane With Paved Shoulders From Km.39.950 To Km. 52.000 on NH367 Bhanapur/ Gaddankeri Section in the State of Karnataka on EPC mode
Construction of Animal Welfare Centre at Bhagthali, Kathua ongoing by way of Construction of Veterinary Dispensary for Animal Welfare Centre at Baghthali Kathua through EPC mode
Construction of High Level Bridge across Kunwari River on Vijaypur Bypass road near Village Laadpura District Sheopur in the state of Madhya Pradesh. on EPC Mode
Strengthening of road from km 10.000 to km 29.500 of Hollongi to Itanagar section of NH 415 on EPC mode in the state of Arunachal Pradesh.
Landslide treatment works at km 19.3 and km 19.8 on Joshimath Malari Road in 21 BRTF area under project Shivalik in Uttarakhand state on EPC mode
Construction Of one Flyover at Km 2.735 and one Major bridge at Km 31.260 on NH 730 In the state of Uttar Pradesh under EPC mode
Construction of External Road Connectivity in Connection with Development of an Extended Port Gate System at Balagarh by Syama Prasad Mookerjee Port Kolkata on EPC Mode
Strengthening and Improvements from Km.48.000 to Km64.000 0f NH 63 New NH 52 Arabail to Idagundi section in the state of Karnataka on EPC mode
Strengthening of road from km 265 80 to 287 50 of NH 209 Chamarajanagara to T N Border under EPC mode in the State of Karnataka
Construction of Underpass at LANGALKANTI from km. 88.690 to km. 89.470 on Panikoili Rimuli section of NH 20 in the state of Odisha on EPC Mode
CONSTRUCTION WORK OF ISHAGARH-KADWAYA-MAHOLI (SH-04)ROAD VIA GAHORA GANESHKHEDA CHHAPRA SHYAMGARH MAMON AND CHAKKCHIMLA ROAD LENGTH 44.298 KM UNDER CRIF ON EPC MODE
Construction of 6L LVUP at Binjhabahal along with approach road in Singhara binjabahal section of of NH 49 in the state of Odisha on EPC Mode
Construction of 6 lane NH-344M-Package 1 (From NH 1 Km-0.700 to Karala-Kanjhawala Road Km 15.000) in State of Delhi on EPC mode
Construction of 2 no of FOBs at Satsang Vihar and Nayapalli on Chandikhole Jagatpur Bhubaneswar of NH 16 in the state of Odisha on EPC Mode
Construction of Balance work of Service Roads and allied works on various packages of NH-161 in the State of Maharashtra on EPC Mode -3rd Call
Design and Construction of 3 Nos VUPs and 10 Nos FOBs on Surat Dahisar Section of NH 48 in the State of Maharashtra on EPC Mode
CS for AE for Supervision of Const. of 07 Nos of Standalone safety struct works at different locations on various NHs in Maharashtra on EPC Mode
One Time Improvement and Maintenance of 4 lane old NH-709B from Km 10.500 to Km 18.050 in the State of Uttar Pradesh on EPC Mode
RFP for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System on Delhi to Agra Section of NH19 on EPC mode
Construction of service road from ch.73.380 to ch.74.210 RHS on Solapur-Vijayapur Road of NH-52 in the state of Karnataka on EPC Mode.
Construction/ Extension of Dudhadhari Elevated Flyover including approaches on Muzaffarnagar -Haridwar Section from Km.206.220 to Km. 208.870 of NH-58 in Uttarakhand on EPC Mode.
Construction of VUP (Ch. Km 149.280) at Pandharkawada Y-Junction on Nagpur to Hyderabad Section of NH-44 in the State of Maharashtra under EPC Mode
Construction of Elevated Corridor at Kherwara Town on Udaipur Ratanpur Shamlaji Section of NH-48 in Udaipur District in the State of Rajasthan on EPC mode.
Construction of VUP, Service road at km.17.325 in village Behram on Phagwara-Rupnagar section of NH-344A in the State of Punjab on EPC Mode
Construction of RCC Drain from Km.23.600 to Km.33.410 on Ghaziabad-Aligarh Section of NH-34 in the State of Uttar Pradesh on EPC Mode
Road Safety Improvement of Critical Junction in Manglaur (km 165.300) on Muzaffarnagar Haridwar Section of NH-334 in the Uttarakhand on EPC Mode under NH(O)
Construction of Major Bridge at Ch. 14.020 (RHS) at Pinjore-Nalagarh section on NH 105(Old NH 21A) in the state of Haryana on EPC Mode
CONSTR OF RD MUDH TSAKA BETWEEN KM 0.00 TO KM 29.00 (NET LENGTH 29.00 KM) NHSL SPECS OF UNDER 112RCC 755BRTF PROJECT HIMANK ON EPC MODE
Widening, Strengthening work of Jainamore (Tilka manjhi chowk) to Phusro (Nirmal mahato chowk) (MDR-077) from 2 lane to 2 lane paved shoulder on EPC mode
Strengthening and Safety Work on Keonchi-Kabirchabutra Road from Km.0.000 To Km 15.535, Of N.H.45 Ext in the State of Chhattisgarh Under EPC mode.
Design Engineering Procurement for Construction of Residential and Non Residential Buildings of 2nd Battalion of Special Security Force at District Gorakhpur UP India on EPC mode
Design Engineering Procurement for Construction of Residential and Non Residential Buildings of Dr Rajendra Prasad National Law University at District Prayagraj UP India on EPC Mode
Construction of Pedestrian High Level Bridge across Kaveri River including approach road from Omkarghat to Bhilat Baba Mandir (Siddhwarkut) at Omkareshwar District- Khandwa in EPC Mode
PR to road from Km 39.0 to 40.2 and 42.3 to 52.0 of Renigunta Kadapa road NH716, in the state of Andhra Pradesh on EPC Mode
Strengthening and Widening of 2 lane with paved shoulders from Km 0.0 to Km 8.380 of NH 63 in the State of Telangana under EPC mode
CONSTRUCTION OF ROAD CHIKIPONGU - PANG BETWEEN KM 0.00 TO KM 22.593 TO NHSL SPECIFICATION UNDER 89RCC/15 BRTF/ PROJECT SEWAK IN NAGALAND STATE UNDER EPC MODE
Contractors All Risk Marine Cargo Workmen Compensation and Professional Liability Insurance for the Project of Provision of Administrative and Logistic Infrastructure Rambilli Visakhapatnam on EPC Mode
Special repair work in km. 1 to 7 (Abadi portion of Hamidpur and Jewar) of NH-334DD in the State of Uttar Pradesh on EPC mode.
Construction of HL Major Bridge across Dahuka River at Km 226.377 (Design Chainage) of NH-57 including approaches in the state of Odisha on EPC mode
Widening to 2 lane with PS from Km 67 to 115 on Kadur Hosadurga section of NH 173 in the State of Karnataka on EPC mode