Loading…
Loading…
25,573 results • Best match
Grid Solar Powered Integrated Micro Irrigation Schemes in the commands of the 11000 L Deewana Distributary Rewari Districts of Haryana on EPC mode under Hybrid Annuity based Model
Design, Supply, Installation, Testing, Commissioning AND Maintenance (1 year Warranty period PLUS 2 years ofComprehensive Annual Maintenance Contract (CAMC)) of Conveyor Belt System at BADARPUR TERMINALon EPC mode
Strengthening of the existing stretch from km 22.500 to km 57.700 26.80 km along with rehabilitation 8.40 km on NH63 in the state of Maharashtra on EPC mode
Up_Gradation to Intermediate lane of NH_301 Kargil_Zanskar Road from Km 98.524 to Km 117.180 in the UT Ladakh (Formerly State of JnK) on EPC mode (under NH(O))
Establishment of New Govt. Nursing College at Jorhat, Assam for the financial year 2022-23 under the Scheme of NEC-reg on Engineering, Procurement (EPC) Mode-1 Basis)
Construction of Major Bridge on NH-8A Extn. NEW NH-41 between Km. 115.2 to Km.115.4 near Village layaja in the state of Gujarat. On EPC Mode
Construction of 45m wide approach road from NH-44 to IMC Rajpura (5.56 Km length) including one number dual carriage way HL Truss bridge (Civil Works) - EPC mode
CS for Supervision of Construction of major Bridge with 4lane configuration on NH 14 over Kangsabati and Shilabati river in Paschim Medinipur of West Bengal on EPC mode
Construction of H. L. Bridge over river Salandi at 9th KM on Chandbali Aradi road in the District of Bhadrak under State Plan through EPC mode of Contract
Construction of Civil Works of 2 no Switchyard of 220 KV for Power House No 1 and Power House No 2 and their allied Works on EPC mode
Strengthening of road from Km 459.930 to Km 465.200 of NH-02 under NH Division in the state of Manipur for the year 2022-23 on EPC Mode
Improvements to RC-12 Sanniyasikuppam road and RC-13 Vadhanur road connecting Moolakulam junction and Thirubuvanai junction in NH45A, Puducherry on EPC mode, under Central Road Infrastructure Fund
Food Processing Plant with Cold Storage Facility at Goladangi Kokrajhar in Assam under BTC Package on EPC Mode-I of contract - Single stage two-part bidding system. TN_57_01R
Reconstruction of Additional Two Lane Bridge across Bhavani river at Km 229/2-4 of NH 209 (in Sathyamangalam town) in the state of Tamilnadu on EPC mode
Widening of existing 2 lane to 4 lane with service road between Km. 329/600 to 334/100 on NH-68 in State of Gujarat under EPC mode
Treatment of 01 nos. of landslide location at ch. 25.630 to 25.745 on NH-507 under EPC mode in the State of Uttarakhand under Annual Plan 2025-26.
PMC work for Construction of 192 Type B Quarters for Police Personnels of P S Chetganj Shivpur Cantt in Police Line Varanasi U P India on EPC Mode
Construction of 6 lane NH-344M Pkg 3 From Nangloi Najafgarh Road Km 28.450 to Dwarka Sector 24 Road Km 38.111 in State of Delhi on EPC mode.
CONSTRUCTION OF PHASE-I SUSTAINABLE UNDERGRADUATE CAMPUS FOR IIMB NEW CAMPUS ON EPC MODE II AT SURVEY NO.47, MAHANTHALINGAPURA VILLAGE, JIGANI HOBLI, ANEKAL TALUK, BENGALURU URBAN DISTRICT
Construction 6 Lane ROB at ROXY along with approaches from Km 234.280 to Km 235.600 on KOIDA RAJMUNDA section NH 520 in the state of Odisha EPC Mode
Widening to Two Lane Paved Shoulders from Km 0.000 Mudigere to Km 26.326 Mugutihalli of NH 173 Mudigere Kadur section in the State of Karnataka on EPC Mode
Widening of existing single/ intermediate lane road to 2 lane road from km 72.40 to km 83.00 on NH-61 in the state of Nagaland on EPC Mode
Design and Construction of a pump house and installation of 2 nos. x 1700 LPS capacity M.F. pumps with allied infrastructures near Bonda Sluice Gate on EPC mode
Reconstruction of HL major bridge across River Tel near Sonepur at Km 51.200 (Design Chainage 51.140 km) of NH-57 in the State of Odisha on EPC mode
Strengthening of NH-702A from Km 0.00 to Km 5.46 and Km 35.00 to Km 40.00 under NH Division Mokokchung on EPC mode in the state of Nagaland
Design, Construction, Fabrication, Erection, Installation, Testing and Commissioning of Two Steel Gangway Structure with Yoke System at Pandu Terminal on EPC mode (one at upstream of Collapsible Jetty)
One Time Improvement of existing town portions of Rari, Lapwaha, Bichhondana, Morena, Lahar and Daboh on NH-552 Extn in the State of Madhya Pradesh on EPC mode
Design, Construction, Fabrication, Erection, Installation, Testing and Commissioning of Two Steel Gangway Structure with Yoke System at Pandu Terminal on EPC mode (one at downstream of Collapsible Jetty)
Dev. of India International Horticultural Market at Ganaur Distt Sonepat i.c Civil works. Dev. of Area and all other realted services complete in all respect on EPC mode.
Lake Front Development Along Northern Foreshore Road NFR of Dal Lake from Nishat to Naseem Bagh PHC, including Pedestrian Walkway, Cycle Track and Viewing Decks, etc.-EPC Mode
Construction of major bridge across papagni river including approaches at km. 153/2 of Renigunta Kadapa Muddanur Road NH716 in the State of Andhra Pradesh on EPC Mode
Construction of Underpass at SALAPADA along with approaches from km. 37.920 to km 38.772 on Panikoili Rimuli of NH 20 in the state of Odisha on EPC Mode
Reconstruction of 3L Damaged Major Bridge on RHS at Km 79.614 on Chandikhole Bhadrak Section of NH 16 in the state of Odisha on EPC Mode 2ND CALL
Rectification of Street lighting of Bengaluru Nelamangala Section from km.10.000 to km. 29.500 of NH 4 New NH 48 in the State of Karnataka under EPC Mode
Improvement from Ch. 228.200 (Rishikesh Geetanagar Chowk) to Ch. 235.250 (Shivpuri, Brahmpuri) of NH-07 on EPC mode in the state of Uttarakhand under Annual Plan 2025-26
Authority Engineer Services for Construction of VUP at Km 26.100 (Village Khalal) and Upgradation of Ahmedabad Godhra NH-47 from Km 60.000 to Km 105.000 on EPC Mode.
Construction of VUP along with additional exit entry ramp at Shastri Colony Ambala Cantt at km 198.300 on NH 44 in the State of Haryana on EPC mode
CS for AE for Supervision of 6Laning of Thuravoor Km.379.100 Paravoor Km.417.000 Kottukulangara Km.454.500 section of New NH66 in Kerala on EPC Mode under BMP
Construction of flyover at km 233.110 on Dogal Kalan to Punjab-Haryana Border Section on NH-71 (new NH-52) in the State of Punjab on EPC Mode
Construction of Flyover at Parimpora Junction and Shalteng Junction on Srinagar Bypass (NH 44) in the UT of J and K under Road Safety Works on EPC mode
Consultancy Services for Authoritys Engineer for Supervision of Development and Maintenance of Inter Modal Station at Ajni Railway Station Nagpur in the State of Maharashtra on EPC mode.
Construction of Two Viaducts at Km 88.440 (LHS) and Km 103.320 (LHS) at Parwanoo Solan section of NH 05 in the State of Himachal Pradesh on EPC Mode.
Construction of Additional Structures on Six Lane Gurgaon Jaipur Section of NH48 between Km 42.700 to Km 273.000 in the states of Haryana and Rajasthan on EPC Mode
Design and Construction of Standalone flyover at Rasalpur Junction on Indore-Dewas section of NH-52 under Road safety improvement in the State of MP on EPC Mode
Upgradation of existing Four Lane Ahmedabad Godhra Highway from Km 60.000 to 105.000 L-45 Km sec of NH-47 in the state of Gujarat on EPC mode
6laning of Aurangabad to Bihar Jharkhand Border (Chordaha)Section of NH2 from km. 180.000 to km. 209.827 (PKGI) in the State of Bihar under Bharatmala on EPC Mode.
Const. of 6L EC from KM 12.695 to KM 14.100 in Kuwarbav sec of NH166 Descoped work of Ratnagiri Package1 in the state of Maharashtra on EPC Mode
Construction of VUP at km 26.100 (near village Khalal, taluka Kathlal District Kheda) of Ahmedabad-Godhra section of NH-47 in the state of Gujarat on EPC Mode
4 laning of Sagar Mohari section of NH 934 from Design Chainage 8.000 to 50.300 under BMP Phase I Economic Corridor category on EPC mode in Madhya Pradesh
Construction of 50 Bedded Ayush Hospital at Junglighat, under SD-I, PBND, APWD, Port Blair. Phase-II i/c IEI in EPC mode-I Design and Build Basis