Loading…
Loading…
25,575 results • Best match
Construction of Major Bridge on Wardha River at Ch.28 362.50 on Talegaon Warud Gonapur road section of NH 347A on EPC Mode in the state of Maharashtra.(2nd Call)
Design Engineering and Procurement for Construction of Medical College Building Library Hostels etc in Government Institute of Medical Sciences Greater Noida District Gautam Buddha Nagar Uttar Pradesh on EPC mode
Construction of High Level Bridge across Reiver Banas between Didyach and Deoli on MDR 182 (SWMDhamoon Kalan Bilopa Ekra Binjari CRB Deoli Sarsop Road) in Sawai Madholpur on EPC Mode
Development of India International Horticulture Market IIHM at Ganaur District Sonepat Haryana including Civil Works Development of Area and all other related services complete in all respect on EPC mode.
Construction of road from km 130.125 to km 156.095 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Design and Construction of Bridge, Approach Road and Protection work River Kathina in Village Gahiya of Development Block Mitauli in Assembly Constituency Kasta of District Lakhimpur Kheri on EPC Mode.
Strengthening work from Km 37.00 to 40.450 including Junction Improvements of NH-72A ( New No. 307) in the State of Uttarakhand under NH (0) Annual Plan 2021-22 EPC mode
Construction of 65 Meter Span Steel Truss Girder Bridge at Km 1 of NH-707A under Annual plan 2021-22 N.H.(O) in the state of Uttarakhand (Under EPC mode)
Strengthening of selected stretches (18.80 km) to the road from Km 0/0 to 40/2 of Puttur Uthkottai road NH716A in the state of Andhra Pradesh on EPC Mode
Improvement of Riding Quality of road from Km. 4/500 to Km.11/0 of NH-114 (New NH-125) Jodhpur-Pokran road in the State of Rajasthanon EPC mode.
Implementation of Smart Water Management System for Tezpur 24 x 7 Water Supply Project Phase I under Amrut 2 in Assam including 5 years Operation and Maintenance on EPC Mode
Periodic Renewal of the stretch from Km 9.9 to Km 18.8 on Hyderabad Srisailam section of NH765 in the state of Telangana for the year 2021 22 on EPC mode
Construction of Simariya Bypass (2-Lane with paved shoulder) from Bansandi village at Km 99.620 to near Banhe village at Km 103.350 in the state of Jharkhand under EPC mode
Construction Reconstruction of 4 lane ROB in Jadcherla Town in km 17.000 to km 18.000 of Jadcherla Kalwakurthy section of NH 167 in the State of Telangana on EPC mode
Rectification of Black Spot Silda Nalla at km 75/470 to 76/290 km on NH-353 Black Spot ID No.OD 0319 on EPC Mode in the State of Odisha
Construction of road from km 168.000 to km 183.400 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Widening to four 548B from Km 80 Near Murgundi to Km 140.2 near Chikkodi excludimg length from Km 118.45 to Km 128.45 in the State of Karnataka on EPC mode
Improvement of Aurangabad Palashi Anjandoh road with CC road (two lane unpaved shoulder) MDR-17, km 1/500 to 22/00 Tq. Aurangabad Dist. Aurangabad on EPC mode (2nd Call)
Construction of road from km 43.65 to km 85.60 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Balance work for Const. of 8L access controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section)in Gujarat on EPC mode Pkg VIII
Rehabilitation and Up-gradation of Jintur- Shirad Shahapur Section Km 258.300 to Km 306.300 of NH-752 I to two LPS configuration on EPC Mode in the State of Maharashtra.
Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh
RFP FOR Construction of Major Bridge across Bankot Creek between Kolmandla District Raigad to Veshvi on Revas Reddi Coastal Highway in Ratnagiri District on EPC Mode in state of Maharashtra
Design Engineering and Procurement for Construction of 300 bedded Advance Pediatric Center Phase 1 of 500 bedded Advance Pediatric Center in SGPGI Campus in Lucknow UP India on EPC mode
Widening to two lane with paved shoulder from Km10.000 to Km 37.420 of NH-218 in the State of Jharkhand under EPC mode (Total Length of the project 27.420 Km).
Periodic repair of Jonai-Pasighat-Raneghat section of NH-515 (old NH-52) from Km. 522.00 to Km. 536.00 (14.00 Km) in the state of Arunachal Pradesh on EPC mode.
Construction of 4L PS Sri Muktsar Sahib bypass from existing Km 269.960 of NH-354 to existing km 39.280 of NH 754 on EPC mode in the state of Punjab
Construction of Trumpet Interchange at Km 665.650 of NH-16 excluding already constructed overpass for providing connectivity to Bhogapuram International Airport in the State of Andhra Pradesh on EPC Mode
Construction of office building for Indian Accounts and Audit Department at Siddaiah Road, Bangalore. SH: Design, supply, Assembly, Installation, Testing and commissioning of mechanized car Parking system in EPC mode.
Construction of 02 nos. Type-IV Quarters, 01 No. Type- III Quarter and 04 Nos. Type-II Quarters for Forest Department at Leh, UT of Ladakh on EPC Mode Basis.
Construction and Commissioning of Common Facility Integrated Production Center for Groundnut Processing (Basic Infrastructure & Core Facility as per RFP technical documents) at Hindupur, Sri Satya Sai District on EPC Mode
Construction of 4-lane Elevated Section and at-grade improvements at Begusarai town section of NH31 from design Chainage 221.047 to 225.302 in the State of Bihar on EPC Mode
One time Improvement from km 27.800 to km 41.300 of NH- 522 (Old NH-100) in the State of Jharkhand on EPC mode (Job No.NH 522 JHR 2023 24 341).
Four Laning of Akola to Medshi from Km 0.000 to Km 47.700 (Design Chainage) of NH161 including Bypasses at Patur and Medshi in the State of Maharashtra on EPC mode
Widening of existing two lane to four lane of Suratgarh-Sri Ganganagar section from Km. 175.000 to Km. 250.900 of NH-62 in the State of Rajasthan on EPC mode.
Construction of road from km 0.000 to km 43.65 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 85.60 to km 168.00 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 78.38 of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 160.75 to km 209.90 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 55.725 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 35.580 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 55.725 to km 113.25 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Procurement of Custom Made, Turn Key, Regenerative cavity-like Laser Delay Line
Construction improvement of Ditte Dime Migging road Design chainage Km 0.00 to Km 29.936 from Class 9 to NHDL spcn under 105 RCC 761 BRTF P BRAHMANK in the State of Arunachal Pradesh Pkg I under EPC mode
PROCUREMENT OF AUTOMATIC WEIGHING AND BAGGING MACHINE IN TURN-KEY BASIS
increasing of tf capacity on semi turn key under EDD-Zamina
CONST. OF 4 UNIT ADDITIONAL TOILET ETC. ON TURN KEY BASIS
Turn-key execution of wiring of 75 houses in the settlement
Filling Clarifier gap with material and labour on turn key basis
Supply, Turn-Key Installation and Commissioning Of Tenacity and Elongation Tester