Loading…
Loading…
25,851 results • Best match
Periodic Renewal under Annual Renewal Programme for 2019 20 ARP from Km 55.00 to Km 64.00 and Km 76.00 to Km 79.00 Total 12.000 Km on NH 217 NH 51 Old on EPC mode in the State of Meghalaya
One time improvement of left over stretches at Bypasses and realignment stretches on NH 365 Nakrekal Tanamcherla section from km 0.0 to 72.0 and NH 167 Miryalaguda Kodad Section Km 187.723 to 234.434 in Telangana State on EPC Mode
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Mangaldai PR under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Bongaigaon PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Consultancy services for Authoritys Engineer for Supervision of Work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH730S(Maharajganj Nichloul Thuthibari)to two lane with P.S. configuration under EPC mode in the State of U.P.
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Barpeta PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of Bhandara Gadchiroli Access Controlled Expressway in the State of Maharashtra on EPC Mode Package BG 02 from Km 0 000 Garada Bk Tq. Bhandara to Km 34 750 Sarandi Bk. Tq. Lakhandur Dist. Bhandara Length 34.750 KM
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Hojai PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Consultancy Services for Authority Engineer for supervision of Construction of Champawat Bypass 2 lane with paved shoulder km 121.700 to km 129.450 on NH-09 Old NH-125 in the state of Uttarakhand under Chardham works on EPC mode.
Construction of VUP (Vehicle Under Pass) at Moominabad Intersection, Underpass at Nowgam Railway Road and FOB (Foot Over Bridge) at Children Hospital on Srinagar Bypass NH 44 in the UT of JnK under Road Safety Works on EPC mode
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Cachar PR. under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the State of Uttarakhand
Supervision Consultancy Services SC for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Losari to Ongole Section 4 Packages of NH 216 Total length 204 Km 2L PS on EPC Mode in Andhra Pradesh
Consultancy Services for AE for Supervision of Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj-Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode
Consultancy Services for Authority Engineer for the work of Rehabilitation and Upgradation of Ras - Beawar - Mandal Section (km 0.000 to km 116.750) of NH-158 in Rajasthan under GNHCP with the loan assistance of World Bank on EPC mode
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of Construction of By-pass to Nayagarh Town from Km 235/469 to km 252/482 of NH-57 in the State of Odisha under EPC mode
Engagement of user fee agency through e-quotation for Bhagat Talai Fee Plaza 13.700Km and Balicha Fee Plaza 4.00Km for the use of Upgradation to 2 lane with Paved Shoulder from Charbhuja at of NH-162E on EPC Mode
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of Widening and Strengthening to 2L and PS from Km 0.000 to 40.000 (Dhaugaon-Podamari Section) of N.H.326 in the State of Odisha on EPC Mode
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of Construction of By-pass to Nayagarh Town from Km 235/469 to km 252/482 of NH-57 in the State of Odisha under EPC mode
4 Lane with PavedShoulder for Ambala-Saha Section from Km.0.000 to Km.14.800 of NH-444A intheState of Haryana Package1 Under Bharatmala Pariyojana on EPC Mode Undertaking rectification works at the riskandcost of the Contractor at various location
Appointment of Safety Consultant from Sardar Patel Ring Road (km 0.00) to Adhelai village of Bhavnagar dist (km 109.019) of Ahmedabad-Dholera Greenfild Alignment (NH-751) under Bharatmala pariyojana in Gujarat on EPC Mode A-D Exp Pkg-1,2,3,4
Engagement of user fee agency on the basis through etender for Gorribanda user fp Km.19.755 for the Rehabilitation and up gradation of NH326A in the State of Andhra Pradesh under NH(O) on EPC Mode developed by MoRTH
CONS AND UPGRAD TO NHDL SPEC FROM KM 14PT000TO KM 25PT000 (DESIGN CHAINAGE KM 14PT000 TO KM 25PT000) (KM 0PT000 RECKONED AT TANGTSE) OF ROAD TANGTSE-LUKUNG UNDER PROJECT HIMANK IN LADAKH UT ON EPC MODE LENGTH 11PT000 KM
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Kokrajhar PS. under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of Bridge including approaches across river Zuari on NH17/NH66 on Panaji Mangalore Section in the State of Goa on EPC Mode (Package-I). S.H Repair work for the office of PMU, MORTH Goa at Altinho Panaji Goa.
Up-gradation to 2 Lane with Paved shoulder from Neechli Oden (Nathdwara) at Design Km 88.800 (Existing km 55.950) to Bhatewar at Design Km 142.028 (Existing km 0.0) of NH-162E in the State of Rajasthan on EPC mode
Construction of 37 50 mtr span Bridge at Karian RD 113 550 on NH 154A and Construction of 14 mtr span Bridge at Kalsuin RD 125 400 on NH 154A in the state of Himachal Pradesh on EPC Mode
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Tezpur PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
SSI, DESIGN AND CONSTRUCTION OF 05 MAJOR PSC BOX GIRDER BRIDGES 06 MINOR TBEAM BRIDGES ALONGWITH ITS APPROACHES, DISMANTLING, REMOVAL OF DEBRIS OF EXISTING BR STRUCTURESON DHAR UDHAMPUR ROAD UNDER PROJECT SAMPARK IN J K UT THROUGH EPC MODE
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Tezpur PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Dibrugarh PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Diphu PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Sonari PS under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Construction of Flyover at Dhargal from Km. 494.418 to Km. 494.548 on NH-66 for rectification of Blackspot ID No.013 (2016-18 series) in the state of Goa on EPC Mode under Road Safety Annual Plan 2024-25.
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Dhubri PR under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Design Engineering and Procurement for Construction of 220 Nos Type 2 and 803 Nos Type 1 Residences for Category 3 and 4 employees of Honble High Court Allahabad at Leader Road Khusrobagh Prayagraj UP on EPC mode 5th Call
Construction of Two Lane to Four Lane Road with paved shoulder from Mangalwar Km. 0/00 to Km. 37/225 Nimbahera Junction NH 56 (Total Length 37.225 Km. ) Major District Road (MDR 11A) in District Chittorgarh, on EPC Mode.
PR from Km 13.000 to 23.000 Km 23.000 to 30.000 and Km 30.000 to 34.900 of Shillong Jowai Road on NH44 New NH06 in the State of Meghalaya under ARP 2021 22 on EPC mode Job No. TA06MG2021 22158
CONSTRUCTION AND UPGRADATION OF TATO MENCHUKA ROAD DESIGN CHAINAGE KM 23PT800 TO KM 33PT100 AND EXISTING CHAINAGE KM 24PT800 TO KM 36PT000 TO 2LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Nalbari PS. under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Consultancy Services for preparation of DPR for Widening to 2 lane or 4 lane from Km 0.000 to 33.000 of Adilabad Bela section of NH 353B in the state of Telangana under Annual Plan 2021 22 on EPC mode
Construction of Major Bridge across Tunga River at Km 0.295 innew alignment on NH 169 (Old NH no.13) on Shimoga Mangalore Section in the state of Karnataka on EPC mode. (Job No. NH-169-KNT-2020-21-919)
Construction of RCC S 4 L/S qtr 16 unit/bldg - Civil, Sanitary and water supply, Site development etc at Nagaon PR under the scheme for Special Assistance to the States for Capital Investment 23 - 24 on EPC Mode.
Consultancy services for AE for Supervision of Construction of missing link from Birhu to Lathiani into 4-lane from km 35.550 to km 42.800 on NH-503A including Cable Stayed Bridge (0.860 km) in Himachal Pradesh on EPC Mode
Rectification of Blackspot through Long Term Measures by construction of 3-Lane Unidirectional VUP with Service Road near Roladungri at km 326.570 (Black spot ID GJ-02-129) on NH-48 in the State of Gujarat on EPC Mode
Balance work of Khed Ghat Realignment Km 46.981 Km 51.400 AND Narayangaon Bypass Km 76.300 Km 81.200 Total length 9.31 Km on Khed Sinnar section of NH 60 Old NH 50 on EPC Mode in the State of Maharashtra
Consultancy services for investigation of approach road and bridge work of Widening of existing 2 lane bridge to 4 lane at Km 4/4 on Nizamabad -Jagdalpur section of NH 63 in the state of Telangana on EPC Mode.
Construction of Rudraprayag tunnel of length 900.30 m including approaches with 200 m length major bridge on Alaknanda River connecting NH-107 (Old NH-109) to NH-07 (Old NH-58) on EPC Mode in the state of Uttarakhand
Rehabilitation and Upgradation to 2-lane with paved Shouders configuration of Beawar-Asind Section (km 30.000 to km 74.000) of NH-158 in the State of Rajasthan under GNHCP with the loan assistance of World Bank on EPC mode.
Implementation of Improvement of Chhatrapati Shivaji Maharaj International Airport Junction T2 by Construction of Vehicular Underpass between Km. 6 plus 140 to Km. 6 plus 950 of Western Express Highway in Mumbai. EPC Mode Revised Proposal 2 nd Call.