Loading…
Loading…
2,891 results • Best match
Consultancy Services for AE services for 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km113.535) including widening of the existing 4lane-6lane highway from Km112.880-Km115.320 of the Meerut-Haridwar NH-58 on EPC mode in UP
Construction LVUP on Six Lanning of Agra Etawah Bypass section of NH-2 from km 270.270 to km 270.830 and Construction of Foot Over Bridge at Km 274.055 in the state of Uttar Pradesh to be executed on EPC Mode
Construction 4lane Greenfield Amritsar connectivity of Amritsar with Delhi-Amritsar-Katra Exp. from Jun. with Kapurthala-Sultanpur Lodhi road (NH-703A) Isharwal village ch.24.000 to MDR Jun. at ch.40.900 Dhunda Village on EPC mode under BMP in Punjab
6 lane Flyover with approaches and Slip Road from km 0.000 to km 1.460 along NH 44 at Start of NH 530B Mathura Bypass at Existing km 154.200 of NH 02 (New NH 44) in Uttar Pradesh on EPC Mode Basis
Development of Six lane access-controlled highway from Design Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh and Uttarakhand under BMP on EPC mode (Package-2).
Construction of a 4 lane Western bypass for Jaunpur city connecting NH 731 at existing Ch. 223.200 Km to NH 135A (Eastern Bypass) at Ch. 107.780 Km. (total length 12.205 km) in the state of Uttar Pradesh on EPC mode
Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under Bharatmala Pariyojana from Junction of EPE Design Ch 0.000 to Design Ch 27.000 (Vill.-Lohadda) in the state of UP on EPC Mode (Package-I) 2ND CALL
Construction of balance work of Widening and strengthening for improvement and up-Gradation of NH-709A Garhmukteshwar chainage- 83.200 of NH24 to Meerut (chainage 9.860 of NH235) including connector to Nh-119 Package XII in Uttar Pradesh on EPC Mode.
Design Engineering and Procurement of Construction of Indoor Sports Complex for increase of 50 seats in UG Course in New Campus of Dr Ram Manohar Lohia Institute of Medical Sciences Gomti Nagar Extension at District Lucknow UP on EPC mode
Consultancy services for (AE) for supervision of Construction of Shohratgarh Bypass (Design Length 6.273 Km) to 2lane with paved shoulder on NH-730 starts near ch. 413.700 and ends near ch. 419.000) under EPC mode in the State of UP.
Improvement and up gradation from NH227B (84 Kosi Parikrama Marg) Package-V Design Km 140.960 (Patranga) to Km 160.200(Bahuvan Madar Majha) to two lane with paved shoulder configuration with Parikrama Marg under EPC mode in the State of Uttar Pradesh
BID for Balance work of Construction of Bypass for providing inter connectivity amongst National Highways (NHs) around the Pratapgarh city (Pratapgarh Bypass) on EPC mode from km 0.00 to km 2.90 (Near junction with NH-931)in the State of UP
Engagement of user fee agency through e-quotation for Dularpur Fee Plaza for two lane with paved shoulder road under EPC mode on Bahraich-Shrawasti Section (km 248.400 to km 310.000) on NH-730 in the state of Uttar Pradesh
Periodic Renewal Work in Km. 505.000 to 537.000 of NH-730 in the state of Uttar Pradesh (including Thin white topping Ch. 525.915 to 528.000 and Ch. 533.000 to 535.000 on (EPC) basis
Selection of Contractor for work of Design and Build / Renovation of existing Zila Pustakalaya Varanasi Civil Structure at Varanasi, Uttar Pradesh including five years maintenance through process of e-tendering on EPC Basis.
Consltancy services for AE for Supervision of Rehabili.and Upgrada. to 2L with PS confi.from Km0.000 to Km7.800 and km.35.400to Km.52.345(Dg.len. 24.745Km. except,Bihar portion)of NH727B(Tamkuhiraj to B.B. and B.B. to Majhauli)on EPC mode in UP
Construction of four lane Flyover at Quarsi Chauraha on Aligarh-Ramghat Road in District Aligarh.
Construction of all work at turn key basis at Rampur Jamuniya water supply scheme block Dudahi district Kushinagar
Work for Various Line Erection under Various Deposit Head under Semi turn Key Basis in EDD-Khaga, Fatehpur
Construction of all work at turn key basis at Shivpur Bujurg water supply scheme block Padrauna district Kushinagar
BIFURCATION OF 11Kv TOWN No.02 FEEDER FROM 33/11KV SUBSTATION RAUZA GHAZIPUR ON SEMI TURN-KEY BASIS
Work Of Breakdowns Of 11 KV/33 KV Cables on Semi Turn Key Base Under EDD-III, Mathura
BIFURCATION OF 11Kv SARAUNI FEEDER FROM 33/11 Kv SUBSTATION GANJARI DISTT. VARANASI ON SEMI TURN KEY BASIS.
Work for Various Line Erection under Various Deposit Head under Semi turn Key Basis in EDD-2 Fatehpur
Work for Various Line Erection under Various Deposit Head under Semi turn Key Basis in EDD-1 Fatehpur
Construction of all work at turn key basis at Dubauli Bazar water supply scheme block Dudahi district Kushinagar
Construction of all work at turn key basis at Rampur Bangar water supply scheme block Khadda district Kushinagar
BIFURCATION OF 11Kv TOWN No.01 FEEDER FROM 33/11KV SUBSTATION RAUZA GHAZIPUR ON SEMI TURN-KEY BASIS
Construction of all work at turn key basis at Naurangiya water supply scheme block Nebua naurangiya district Kushinagar
CONSTRUCTION OF NEW 33 KV LINE FOR NEW PROPOSED 33/11 KV SUBSTATION SUJABAD, CHANDAULI TURN KEY BASIS.
Construction of all work at turn key basis at Parsauni kalan water supply scheme block Padrauna district Kushinagar
Re-Tender for the procurement of Turn Key Project to Develop Cold Room for the department of Microbiology
BIFURCATION OF 11KV TOWN NO.01 FEEDER FROM 33/11KV SUBSTATION HUSAINABAD JAUNPUR ON SEMI TURN-KEY BASIS
Colour Sortex Machine Cap 04-05 TPH and allied equipments on turn key basis for processing of seed.
As per NIT and tender document
Investigation, Survey, Detailed Design, Procurement, Construction of Urban Placemaking and Infrastructure Works on EPC Basis for Development under Lahartara to Chowka Ghat Flyover including Five Years of Operation and Maintenance under SCM in VNS
Improvement and Upgradation of Existing Road to 4lane with Paved Shoulder from Km 229.070 to 260.800 End of Hardoi District to Lucknow of NH731 Pkg4 on EPC basis in the state of Uttar Pradesh
Construction of 250 Nos. Type-II Qtrs. S plus 6, in EPC Mode-1 at CISF SSG Campus, Greater Noida UP. (SH: Providing skilled, semi-skilled and Unskilled workers for smooth functioning of ADG Lucknow office and sub-division 06 office). Subwork/Packages: Civil work
Construction of 250 Nos. Type-II qtrs. (S plus 6), in EPC Mode-1, at CISF SSG Campus, Greater Noida (UP). (SH: Providing skilled/semi-skilled and Unskilled workers for smooth functioning of ADG, Lucknow office and sub-division-06 office). Subwork/Packages: civil work
RFP for the work of Rehabitation and Upgradation of NH931A from Design Ch. 0.000 to Design Ch.53.500. (Design length 53.50 Km) to 2L / 4L plus PS of Jagdishpur-Jais-Salon of NH931A on EPC Mode in the State of Uttar Pradesh.
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Ranipur Barsi Saharanpur district to Sadopur Ambala district Ch.45.500-121.786 of Shamli Ambala section in Haryana on EPC Mode (PKG-II)
Authority engineer/PMC for Supervision of Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH-24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode
Selection of AUTHORITYS Engineer (AE)/PMC Services for Supervision of Construction of two lane with paved shoulder from Km. 0 000 to Km. 10 603) (UP Bihar Border to Chandauli) of NH-219 on EPC mode in the state of Uttar Pradesh.
Consultancy services for AE for Supervision of Improvement and rehabilitation of Existing Ayodhya Bypass from design km 121.600 to Design km 144.020 (Length 22.420 Km) of NH-28 (New NH-27) of EPC Mode under BMP in the state of Uttar Pradesh
CS for AE for supervision for the projects Construction of Agra Bypass connecting 174.500-km141.000 of Yamuna Expressways Construction of leftout portion of Agra Inner Ring Road connecting village Deori (CH 0) to NH-44 (CH. 7.772) in UP on EPC mode.
Construction of 2 nos of FOBs with Ramps at Km.11600 Collectorate Baghpat and at Km 32000 Kendriya Vidyalaya, Baoli of NH709B in the stretch from EPE Crossing to start of Shamli Bypass in the state of Uttar Pradesh on EPC mode
SC Services during O-M of 4-laning of Ghaghra Bridge to Varanasi section of NH-233 from Km.121.800-Km.180.420 (Package-1) from Ghaghra Bridge Abutment on Basti side to Bhudanpur Urban section in UPunder NHDP Phase-IV on EPC mode.
Engagement of user fee collection agency on the basis of CB through Shrishikalan FP at Km 193.600 for Rehabilitation and up gradation from km 178.00 to km 215.00 of NH-76 to 2 lane with paved shoulder on EPC mode in Uttar Pradesh
Development of Six lane green field Ring Road-bypasses Package-I Sachendi-Mandhana Road start from Design Ch.0.000 to Design Ch.23.325 (Length 23.325) kms around Kanpur District in the state of Uttar Pradesh under NHDP Phase-VII on EPC mode