Loading…
Loading…
447 results • Best match
Job 2 Construction of Link road Harijan Basti Raipur Bare in Village Raipur Nichla km.0-0 to 0-800 Sub Head C.O Embankment, Retaining walls, P/L GSB, C.C Pavement and 30mm thick BC etc. in km 0-0 to 0-800 Under SCCP
Construction of link road Dangar Malehri Bhadsi road km 0/00 to 2/500 SH Construction of Embankment , Stone Soling Cement concrete work in 1.1.5.3 km 2/100 to 2/210 and C/o P.C.C. R/wall AND B/wall at various RD Under MMSY
(SH) Construction of retaining walls, wire crate works, stacking works and dredging work.
(SH Preparation of Detailed Project Report for Providing Flood Protection work to save the cultivated lands Abadies of village Kangar (Mohalla Khatta) Baba Naina Ji in tehsil haroli Distt. Una (HP)
Construction of embankment with apron, slope pitching, toe key/wall on river side along the earthen embankment, open channel including survey investigation, designing and planning of whole project
SH C/O Embankment at Rds 10/210 to 10/300
C O C C wall with Skin Reinforcement at RD 31050 to 31200 equal to 150 mtr
construction of wire crate, Gabion wall i c toe wall along with apron between RD 27300 to 27355.00 equal to 55 mtr
Job 2 Construction of link road to Tibian village Polian Beet from Una Jaijon road Sub Head Construction of embankment, P.L GSB, WMM. Primer coat, tack coat, Premix carpet, seal coat at km. 0-0 to 0-400 and Construction Hume Pipe culvert at RD.0-010
CONSTRUCTION OF LINK ROAD BAGLI NH-503 TO HARIJAN BASTI MANDWARA VIA MANHAS BASTI VAID BASTI KM 0.0 TO 2.880 SUB HEAD ROFD FROM RD 0.430 TO 0.520 C.O R.WALL AT RD 0.430 TO 0.465 CEMENT CONCRETE PAVEMENT AT RD 0.430 TO 0.640 C.O EMBANKMENT AT
P/L GSB,WMM and Tarring in km. 0/080 to 0/300, i/c both side edge walls and embankments at rd. 0/190 to 0/250) Under OTMNP Head
(SH - Providing protection work and construction of counter fort wall at RD.3/400 to 3/502.30).
SH Formation cutting, C/O Embankment and back filling in various RDs.
(SH- C/O Wire crate embankment work from RD 40 to 60.00 )
(SH- C/O Wire crate embankment from RD 0/0 to 30
Sub Head Construction of 75 mtr Long stone filled wire crates from RD 200 to 275 m Left Bank
Channelisation of kuhat Nallah at Sandhole RD 0 to 806
SH CO CC Protection wall with skin reinforcement at various RDs at Patlikuhal near Baragran Bridge AND at Katrain
Tender for for providing flood protection works by raising the level of bench downstream of 132kV sub-station Jahoo by earth filling from RD 15.0 to 35.0 mtr. under Electrical System Division, HPSEBL, Hamirpur.
RR Damages on Ganasidhar Kadiwan road km 00 to 11300 SHCO RWall at RD 4220 to 4235 1560 to 1565 1820 to 1860 5700 to 570750 7220 to 722750 8410 to 8420 8830 to 8835 9100 to 9105 and Filling of embankment and kharnja stone soling UNDER PDNA
Construction of link road from village Melion to house of Smt. Shabnam in G.P. Melion, Sub Tehsil Majra District Sirmour H.P. (SH-C/O embankment with approved materials, C/o GSB 0/0 to 0/150 and edge wall from RD 0/125 to 0/144) Under MMGSY.
Re-construction to Tahliwal Bathri Road MDR-41 at km. 0-0 to 7-700 Sub Head P.L Paver Blocks in km 2-800 to 2-950, P.L embankment, GSB, WMM, Prime Coat, Tack Coat, DBM and BC in km. 0-350 to 2-0 MDR-41 Deposit work
Construction of road from Kishanpura to Santoshgarh upto NH-72 Puruwala km 0/0 to 3/800 in Tehsil Paonta Sahib Distt. Sirmour H.P. (SH-C/O embankment, P/L C.C.1,3,6 in edge walls, GSB and wet mix macadam, RD 3/420 to 3/800) Under MNP.
Job 2 Construction of link road from Bazigiran Mohalla to Harijan Basti via Dhesi Mohalla km. 0-0 to 2-0 Sub Head Embankment in 0-0 to 0-480, Retaining wall, WMM and Premix carpet , M.T, seal coat in RD 0-0 to 0-360 Under MMGSY
SH CO CC Protection wall with skin reinforcement at various RDs at 15 mile Baragran Bihal
SH C O CC protection wall with skin reinforcement at various RD near Alooground in G.P. Shaleen.
(SH- C/O Wire crate embankment from RD 33 to 47)Under PDNA
Construction of wire Crate embankment Apron at various RD and CO RCC Dyke
Embankment protection work Underpass, in km. 0/00 to 0/175)(Balalnce work
(SH- C/O Wire crate embankment work from RD 0/0 to 20.00 )
SH C/O Embankment and filling at RD 0/180 to 0/575.
RR of 9 5Mtr long wire crate embankment at RD 0500 to 05095
Job 5 Construction of link road Dharmpur to Baliwal via Kirni Dhiga km. 0-0 to 4-500. (ub Head C.O Embankment , P.L GSB in km. 0-0 to 1-0, Edge wall in RD. 0-350 to 0-450 and 3.00mtr. Span Culvert at RD 0-600 UNDER OTMNP
C.O LINK ROAD SAMNOLI TO VILLAGE NICHLA SWANA KM 0.0 TO 2.0 SUB EHAD C.O EMBANKMENT IN KM 1.795 TO 1.190 AND 1.265 TO 1.290 C.O R.WALL AT RD 1.210 RO 1.255 P.L 900MM HUME PIPE DIAPIPE CULVERT AT RD NP2 AT RD 0.570- 0.700 AND C.O SOLID CAUSEWAY AT
Job 1 Construction of link road to Bharwalan to Swan Nadi km. 0-0 to 1-500 Sub Head Formation cutting, Embankment, C.O 3mtr. RCC span culvert at RD. 0-030 and GSB, WMM, C.C Pavement in km. 0-0 to 0-085 and 0-490 to 0-550 Under OTMNP
Job 2 Construction of link road Shiv Mandir to Malahat via Chattara Dhesi Mohalla to Majra Una Aghar road to Ward No. Mohalla Bharamana to Hardan Wala Bag Lower Arniala Una Sub Head C.O Embankment at RD 0-0 to 0-300, Retaining Wall at RD 0-0 to 0-100
RR Damages on Rilla Chandi Kurshali Road km 0 000 to 8 415 SH Removal of slips and Landslides at various Rds in Km 5 560 to 6 500 Construction of Embankment filling at various Rds and Regrading of road at various Rds in Km 6 300 to 6 735
P/L Solid Cause way at Rd 0/140 to 0/175 Embankment filling)
Estmate for protection work by wire create wire embankment reating wall in Rey Khad
C/o Embankment, GSB and Wearing at RD 1/570 to 2/0). MMGSY.
SH construction of Earthen embankment with apron, slope Pitching and construction Toe key on River Side along the embankment RD 3970 to 4120 150 Rmt Left Side and RD 3900 to 4100 200 Rmt Right Side
Sub Head c o wire crate embankment cut off wall fencing panel common header etc
Construction of wire crate protection wall at R.D. 8/440 to 8/540 and Embankment
SH R R of 25 Mtr long wire crate embankment to protect the Pump House
SH RR of 37 50 Mtr long wire crate embankment at RD 01025 to 010625
Construction of Balance Earthen Embankments including wire crated apron stone pitching etc and construction of Toe wall from RD 20600/4150 to RD 20600/4360 on right side of Bhadsali Khad on right Bank of Swan River
Prep of Subgrade Scarifying of Bt Surf PLC of GSB 200Mm WMM 150Mm DBM 60Mm Incl PC and BC 40Mm Incl TC as per MoRTH Spec with Rd Marking Earthwork in Embankment and Sand Blanketing 25Mm Bet Km 13 to Km 25 pt 400 on MS Rd Udr 70 RCC Sector of PJT DPK
Construction of Wire Crate embankment and Apron at various RDs and Construction of RCC Retaining wall
SH R R of 50Mtr long wire crate embankment at RD 0 0 to 0 50
SH R R of 7 5 Mtr long wire crate embankment near pump house stage 1st