Loading…
Loading…
5,102 results • Best match
As per NIT
Building Work/ Building Maintenance Work/ Building Renovation Work.
SR to RC bldg Known as Omkar B2 in E1 ward Improvement to Drainage Arrangement and Rough Shahbad Stone Flooring and Rusted Damaged GI Pipe work Providing Water Supply Line BMC to U G Tank and UG Tank to OHT (registered with MHADA under DDR Class only
Repairs to plaster of passage, rooms, toilet portion of B.D.D. Chawl No. 1 to 30 and 32 at N.M. Joshi Margand B.D.D. Chawl No. 5 to 16 at Sewree and flooring and drainage line in between B.D.D. Chawl No. 1 to 22 at N.M. Joshi Marg, Mumbai.
1) STBT to roads from Balaji Toll to Imam Beg House in Bhusawal City. 2) STBT to Roads from Papa Nagar to Raza Tower to Kabrasthan Road in Bhusawal City.3) Provision of Paving block flooring at Bohri Kabrsthan in Bhusawal City.4) Construction of conc
8215 PROVN OF TOILET URINALS AND WASHBASIN IN TRG AREA BLDG NO P 95 TRAINING SHED AT AIPT PROVN OF FLOORING WITH TILES IN NISHAN HUT NO T 30 AND PROVN OF HARD STANDING FOR EW SPECIAL VEHICLES AT 13 EW BN UNDER GE CENTRAL PUNE
PROVISION OF ACESS PATHWAY AND ENTRANCE PORCH FOR BLDG NO P44 INCLUDING SPECIAL REPAIRS TO FLOORING AND WINDOWS IN LABS AND OFFICES OF RAQAS (MBI) AND SPECIAL REPAIRS TO SKG AR AL ATE AND ALH WORKSHOPS IN P26 BLDG AT INS SHIKRA UNDER GE NW NOFRA
GE (N) P/TOKEN- 68 OF 2025-2026 REP TO FLOORING,PLUMBING,JOINERY, PLASTERING, SANITERY FITTINGS AND MISC REP AT VICTORIA ROAD, VISWAMITRA MARG SCSR, NEHRU MARG AND OTHER NEAR BY UNITS (MD/OTM ACCN) IN THE AREA OF AGE B/R (EAST) UNDER GE (N) PUNE
Construction of cement concrete road at Taj Amma colony slum from house of Ismail Bhai to Salim Bhai and c.c. flooring at Sinddhiban slum from Munnabhai Almaiwale to Sheikh and providing and fixing I Block on road side at Tajbag slum area in p. no.30
8930 ADDITIONAL ALTERATION AND SPECIAL REPAIRS TO WASHROOMS AND SUNKEN FLOORING OF BLDG N P 183 OF PM DEPT PROVISION OF WASH BASIN FACILITY WITH FRESH WATER AND DRAINAGE AT NTG MBI AND WRSTG MBI IN FMU SS COMPLEX ND MBI PROVISION OF SLIDING WINDOW IN
providing and laying vitrified mirror glossssy finish tiles decorative type having size 590 mm to 605 mm 590 mm to 605 mm of 8 to 10 mm thickness and confirming to ls. 15622 2006 group Bal of approved make, shade and pattern for Flooring in requir
Construction of H.P. Drain From 1) H/o Jagan Jaunjalkar to H/o Anandrao Kolhe 2) H/o Bhagyashree Medical to H/o Milind Akhade and Flooring Work From 3) H/o Akhade to H/o Vivek Ghaturkar in Prabhag No. 4 at N.P. Armori Distt. Gadchiroli
GE (N) P/TOKEN- 66 OF 2025-2026REPAIRS TO PLASTERING, FLOORING, JOINERY , PLUMBING SANITARY FITTINGS AND MISC REPAIRS AT GHORPADI AREA, DMSA, HQ 3 EW BDE, 641 EME BN, ADV HQ (SWAC), LIASION UNIT ETC, IN THE AREA OF AGE B/R (EAST) UNDER GE (N) PUNE
SR to RC bldg Known as Omkar A1 in E1 ward Improvement to Drainage Arrangement and Rough Shahbad Stone Flooring and Rusted Damaged GI Pipe work Providing Water Supply Line BMC to U G Tank and UG Tank to OHT (registered with MHADA under DDR Class only
GE (N) P/TOKEN- 43 OF 2023-2024REP TO JOINERY PLASTERING FLOORING PLUMBING SANITARY FITTINGS AND MISC REPAIRS AT VICTORIA ROAD VISHWAMITRA NEHRU MARG SCSR HORSE RIDING AND NEAR BY UNITS (MD /OTM ACCN) IN THE AREA OF AGE B/R (EAST) UNDER GE (N) PUNE
GE (N) P/TOKEN- 20 OF 2024-2025 REP TO JOINERY, PLASTERING, FLOORING, PLUMBING, SANITARY FITTINGS AND MISC REP AT VICTORIA RD, VISHWAMITHRA MARG, SCSR, NEHRU MARG AND NEAR VARIOUS UNITS (MD/OTM ACCN IN THE AREA OF AGE B/R (EAST) UNDER GE (N) PUNE
providing and laying vitrified mirror glossssy finish tiles decorative type having size 590 mm to 605 mm 590 mm to 605 mm of 8 to 10 mm thickness and confirming to ls. 15622 2006 group Bal of approved make, shade and pattern for Flooring in requir
Construction of one New Labs of size 7 m x 10.60 m under the P.M. Scheme for KV, ISP Nasik Road. SH: Providing and fixing M.S. Truss with Profile sheet shed and checkered tiles over CC flooring and other works around Lab of KV ISP, Nasik.
Renovation of C type quarters, Water proofing of B type quarters, Renovation of toilets of hostel 1&2, Renovation of UG sump and pump house, Construction of New additional toilet block at lecture hall, PVC flooring at lecture hall and board room in NIBM campus, Kondwa, Pune.
SUPPLY OF PVC FLOORING SHEET TO DRAWING.NO LWACCN/EOG/GR-4-1-003, ALT-a ITEM NO 5 TO 16 AS PER SPEC. RDSO/2006/CG-12 REV-01, AMD- 01 TO 05 WITH 3 mm DIA PVC ELECTRODE OF MATCHING COLOUR OF LENGTH 70 M
SUPPLY OF PVC FLOORING SHEET TO DRAWING.NO LWACCN/EOG/GR-4-1-003, ALT-d ITEM NO 5 TO 16 AS PER SPEC. RDSO/2006/CG-12 REV-01, AMD- 01 TO 05 WITH 3 mm DIA PVC ELECTRODE OF MATCHING COLOUR OF LENGTH 70 M
SUPPLY OF PVC FLOORING SHEET TO DRAWING.NO LWACCN/EOG/GR-4-1-003, ALT-a ITEM NO 5 TO 16 AS PER SPEC. RDSO/2006/CG-12 REV-01, AMD- 01 TO 05 WITH 3 mm DIA PVC ELECTRODE OF MATCHING COLOUR OF LENGTH 70 M
"(1) Upgradation of infrastructure with industrial flooring, Epoxy coating and racking system at DEMU/Gondia. (2) Construction of one OFC hut alongwith battery room for S&T department at Gondia. (3) Provision of office cum store with facilities for SSEs of S&T department at Gondia."
WORK NO.1 CONSTRUCTING PAVER BLOCK FLOORING AT BORLI (PART-1) TAL.IGATPURI DIST.NASHIK.
2) Providing and Fixing Flooring to samaj mandir Otta at Malselu Ta Hingoli
Supply and installation of Composite Flooring Sheet made up from mixed plastic waste
SITC of PPGI work with Vinyl flooring at CVTS, 2nd floor, K.E.M. Hospital.
WORK NO.2 CONSTRUCTING PAVER BLOCK FLOORING AT BORLI (PART-2) TAL.IGATPURI DIST.NASHIK.
Providing Pever Block Flooring To Smashanbhumi At Mauje Devergaon Tal Nashik Dist Nashik
Cement Khyber, Iron 16mm jindal, Iron 12mm Jindal, Iron 10mm Jindal, Iron 08mm Jindal, Binding Wire, Crusher Bajri, Sand, Bajri Nallah, Stone Boulders, Red Bricks 15 P, Wall Tiles NITCO 1ft x 1 5ft
NIL ok
NIL Ok
GE (N) P/TOKEN- 44 OF 2026-2027 REPAIRS TO JOINERY FLOORING,PLUMBING AND FIXTURES AT GHORPADI OFFRS/JCOS/OR PIONEER UNIT DMSA, SCIB, STN CELL, SSTA, SWAC (MD/OTM ACCN) AND OTHER VARIOUS NEAR BY LOC IN THE AREA OF AGE B/R (EAST) UNDER GE (NORTH) PUNE
MOW to 600 Police Qrts D Type Building at marol Police camp Andheri (E).Repairs to flooring, W.C, Bath, Door/Window and Plaster painting. Bldg No.D-3 ((Room No.2,7 and 9 ) and Bldg No.D-4 (Room No.11,12 and 16), Bldg No.D-5 ((Room No.8 ) and Bldg
MOW to 400 Police Qrts A Type Building at marol Police camp Andheri (E).Repairs to flooring, W.C, Bath, Door/ Window and Plaster painting. Bldg. No. A-2 ((Room No.15,17 and 23),Bldg No.A-4 ((Room No.50,53, and 61) and Bldg No.A-5 (Room No.17,21,24,
MOW to 600 Police Qrts E Type Building at marol Police camp Andheri (E).Repairs to flooring, W.C, Bath, Door/Window and Plaster painting. Bldg No.E-2 ((Room No.5.12 and 17 ),E-9 (Room No.10,11 and Bldg No.E-15 ((Room No.9 and 17), Bldg No.E-16((
MOW to 400 Police Qrts B Type Buildin at marol Police camp Andheri (E).Repairs to flooring, W.C, Bath, Door/Window and Plaster painting. Bldg No.B-1 ((Room No.10), B-4 ((Room No.31 , 36) and Bldg No.B-6 ((Room No.57,62 and 64),Bldg No.B-2 (Room
MOW to 400 Police Qrts C Type Building at marol Police camp Andheri (E).Repairs to flooring, W.C, Bath, Door/ Window and Plaster painting. Bldg No.C-1 ((Room No.07), C-2 ((Room No.58 , 63 and Bldg No.C-3 ((Room No.77,84 and 85), Bldg No.C-4 (Ro
SPL REPAIRS TO FLOORING OF BLDG NO. W-30 STORE AT 201 ARMY AVN SQN UH, SEWAGE LINE NEAR BLDG NO. P276 AT 1631 MED BTY, AND CERTAIN REVENUE WORKS AT STN HQ, T-58 DHOBIGHAT IN AGE B R HAIG LINE AREA UNDER THE AOR OF GE DEVLALI
REPAIRS AND CLEANING OF SEWAGE LINE, AND DAY TO DAY PETTY REPAIRS TO MISC B/R AT OTM AND MD ACCN AND REPAIRS TO FLOORING, ROOFING LEAKAGE/SEEPAGE AND CERTAIN OTHER CIV WKS AT OTM AND MD ACCN AT CABS, INS TANAJI, NOFRA AND NSB UNDER GE (NW) MANKHURD
GE (N) P/TOKEN- 49 OF 2022-2023REPAIRS TO JOINERY, PLASTERING, FLOORING, PLUMBING SANITARY FITTINGS AND MISC REPAIRS AT KG LINE, HQ ARTY DIV, 752 TPT COY, 3 ASHOKA MARG AND OTHER NEARBY UNITS (MD/OTM ACCN) IN THE AREA OF AGE B/R (EAST) UNDER GE (NORT
8973 SPL REPAIR TO BLDG NO P 53 PWSS AT INS KUNJALI UNDER GE NW KUNJALI PROVN OF ROLLING SHUTTER FOR FRESH POINT INCLUDING CONNECTED WORKS AT BASE VICTUALLING YARD MUMBAI AND PROVN OF PCC FLOORING IN STORE SECTION V OF BUILDING NO A 29 AT NAD MUMBAI
SPL REPAIRS TO DAMAGED FLOORING OF OFFICERS MD ACCN (BLDG NO P-47, P-93, P-102, P-109, P-276, P-277, P-358 AND P-359) AND SAILORS MD ACCN (BLDG NO P-25, P-31, P-178, P-251 AND P-253) AT INS SHIVAJI LONAVLA
SPECIAL REPAIR TO ROOF LEAKAGE AND SUNKEN PORTION IN BLDG NO P 118A AND P 118 1ST FLOOR AND SPECIAL REPAIR/REPLACEMENT TO MT SHED, RE-FLOORING OF MT PARKING AND ALLIED WORKS AT HQ MAO (AFI BLDG) UNDER AGE B/R (CENTRAL) OF GE (WEST) COLABA, MUMBAI
GE (N) P/TOKEN- 39 OF 2021-2022REP TO FLOORING, SANITARY FITTINGS, PLASTERING, CEILING, CHAJJAS, ROOF, PLUMBING, JOINERY AND MISC B/R WKS IN THE AREA OF CLIMO RD, MAYO RD, KAHUN RD, SFC, PG RD AND CERTAIN BLDGS UNDER AGE B/R (C) UNDER GE (N) PUNE
8477 SPL REPAIR TO BLDG NO 1A AT COLABA MUMBAI UNDER GE NW KUNJALI FITMENT OF ADDITIONAL 91 IN NOS FIRE SENSORES AT FMU MBI SS COMPLEX BLDG NO 49 AT NAVAL DOCKYARD MUMBAI And PROVISION OF WOODEN FLOORING IN GROUND FLOOR AT DOCKYARD HOUSE UNDER AGE B
GE (N) P/TOKEN- 17 OF 2026-2027 REPAIRS TO JOINERY FLOORING,PLUMBING AND FIXTURES AT GHORPADI OFFRS/JCOS/OR PIONEER UNIT DMSA, SCIB, STN CELL SSTA SWAC (MD/OTM ACCN) OTHER VARIOUS NEAR BY LOCATIONS IN THE AREA OF AGE B/R (E) UNDER GE (N) PUNE
Repair and construction of drainage line, renovation of electric substation, laying and fixing paver blocks raising height of boundary wall, increasing floor height of workshop including providing and fixing cabin with aluminium framework PU flooring in workshop including related electrical work at IDEMI (MSME) Campus, Chunabhatti, Sion, Mumbai.
Repair and construction of drainage line, renovation of Electric substation, laying and fixing paver blocks, height raising of boundary wall, increasing floor height including providing and fixing Aluminium Cabin, PU flooring in Workshop including Electrical work at IDEMI (MSME) Campus, chunabhatti, Sion, Mumbai. SH Internal partition of workshop.
Execution of 03 Works for:- (1) Improvement work of re-flooring and replacement of roof sheets in Wheel and Bogie Shops of MIBW SECR. (2) Construction of New 32 bedded capacity running room at Kalumna Station. (3)Balance Civil Works at Kamptee Station of Nagpur Division under ABSS.