Loading…
Loading…
5,113 results • Best match
CA NO.CWE BLY/GE (W) /2PROVN OF STORE ROOM ALONGWITH GENTS AND LADIES TOILET NEAR BLDG NO P-112, WOODEN FLOORING, WALL PANELLING AND FALSE CEILING IN BLDG NO P-112 AND EXTERNAL CABLING WORK WITH CONNECTED WORK AT P-56 BUNGLOW UNDER GE (WEST) BAREILLY
Zone-1 ward no. 01 Kazipara, from Pawan Mahor ji house to Bahadur Singh Tiraha, 31/24, 31/153, 31/14, 31/18, Lakkad Mandi 7/59, 7/66, 31/126, 31/145, 31/212, 31/214, construction of C.C. flooring including drain till Pancheshwar Mahadev temple.
Zone-1 Ward No. 27 Bagh Muzaffar Khan Repair work including the construction of CC flooring and drains in the lane from building number 9/179 of Surendra Garg to building number 9/146 of Mukesh Verma, the gym lane, the lawyer lane and up to Hima
PETTY REPAIR AGAINST DAY TO DAY COMPLAINS IN POCKET 9 IN B R III UNDER GE ROORKEE REPAIR MAINT TO PLUMBING SANITARY FITTINGS TILLING AND ALLIED WORKS IN POCKET 9 IN AGE B R III SAHARANPUR UNDER GE ROORKEE REPAIR MAINT TO FLOORING PLUMBING JOINERY SAN
REPAIR TO WALL PLASTER FLOORING TILLING SEEPAGE JOINERY AND SANITARY AND OTHER ALLIED WORKS IN OTM ACCN IN HQ 9 ARTY BDE 9 ARTY BDE SIG COY 194 MED REGT 633 SATA BTY 409 FD AMBULANCE UNDER AGE B R I OF GE NORTH MEERUT CANTT
REPAIR MAINT TO JOINERY WORK AND CERTAIN B AND R REPAIR WORK IN MD OTM ACCN AND REPAIR MAINT TO BRICK PCC FLOORING PLUMBING SANITARY FITTINGS JOINERY AND ALLIED WORK IN FOLLOWERS MD ACCN IN POCKET 9 IN AGR B R III SAHARANPUR UNDER GE ROORKEE
PROVISION OF TOILET AND BATHROOM NEAR BLDG NO NHO P-06 OF NO 4 PSS CCIB, SPECIAL REPAIR TO FLOORING OF BLDG NO P-1, HARDSTANDING AND DRAINAGE SYSTEM AT SUB AREA CANTEEN AND SPECIAL REPAIR OF HARDSTANDING, PATH AND DRAINAGE SYSTEM AT STN CELL, HQ PUP
painting and tile works
Ward No. 01, Bhatan Kheda, near the cowshed, flats Remaining work of flooring
Plastering flooring, Painting and Tiles In Ward 21 Kasturba Gandhi Residential Girls School
Replace of CGI sheet Repair of plaster Work Putty work Interior and Exterior Distempering Enamel painting Float Glass of Windows Replace of Wall an Floor tiles WC Pan Mirror Bib cock flushing cistron Urinal and Replace of PVC Door etc
CERTAIN REPAIR TO REPAIR TO PCC FLOORING, BRICKWORK, JOINERY, ETC. INCLUDING INTERNAL ELECTRIFICATION IN OTM / MD ACCN OF 883 AT BN (ASC), AOI, STN GYM, SWIMMING POOL, T-68 AND NCC GP HQ, 8 UP GIRLS BN NCC, P-56 AND P-40 UNDER GE (E) BAREILLY.
Custom Bid for Services - Provision for fabrication supplying and installation of the office cabin portable office container of size 25 10 8 6 using required size of ISMC and MS square pipe MS sheet 1 2 mm outside panelling 1 2 mm vinyl flooring, alu.. Similar Category Repair and Overhauling Service
Item No FUR 01, Item No FUR 02, Item No FUR 03, Item No FUR 04, Item No FUR 05, Item No FUR 06, Item No FUR 07, Item No FUR08, Item No FUR 09, Item No FUR 10, Item No FUR 11, Item No FUR 12, Item No FUR 13, Item No FUR 14, Item No FUR15, Item No FUR16, Item No FUR 17, Item No FUR 18, ITEM No CF 01, ITEM No CF 02, ITEM No CF 03, ITEM No CF 04, ITEM No CF 05, ITEM No CF 06, ITEM No CF 07, ITEM No CF 08, ITEM No CF 09, ITEM No CF 10, Item No Elec 01, Item No Elec 02, Item No Elec 03, Item No Elec 04, Item No Elec 05, Item No Elec 06, Item No Elec 07, Item No Elec 08, Item No Elec 09, Item No Elec 10, Item No Elec 11, Item No Elec 12, Item No Elec 13, Item No Elec 14, Item No Elec 15, Item No Elec 16, Item No Elec 17, Item No Elec18, Item No Elec 19
ok
Zone-1 Ward No.-52 Mantola Lado Gali, from Building No. 8/23 to Building No. 8/38 via Building No. 8/42 via Mosque via Building No. 8/60 to Building No. 8/65, repair work including construction of CC flooring and drain in the link lanes.
REPAIR TO ROOF SHEETS FALSE CEILING ROOF TREATMENT HARDSTANDING AND FLOORING IN CERTAIN BLDGS OF 71 MTN BDE SIG COY, CELZ, SKP AND CHILDREN SCHOOL AND REPAIR TO ROOF SHEET FLOOR TILE HARD STANDING ETC IN RSD MRA AND CMP MD ACCN UNDER AGE B/R-II OF GE
PROVN OF RECORD ROOM FOR DEF CIV EMP AND OFFICE OF OIC RECORDS PROVN OF COVERED TREATMENT AREA SIZE 40 X 20 WITH RUBBERIZED MATTING FLOORING AT VET WING AND PROVN OF 03 X PLINTH FOR HAY STACK 35 X 65 AT RTS AND DEPOT SAHARANPUR UNDER GE ROORKEE
CERTAIN MAINT AND REPAIR TO PCC FLOORING, BRICK WORK, ROOF / SUNKEN TREATMENT INCLUDING INT ELECT IN OTM, MD ACCN OF 883 AT BN (ASC), AOI, STN GYM, SWIMMING POOL, T/68 AND NCC GP HQ, 8 UP GIRL BN NCC, P-56, P-40 UNDER GE(E) BAREILLY.
8526/E8 CERTAIN MAINT AND REPAIR/REPLACEMENT TO PCC FLOORING, BRICKWORK AND INTERNAL ELECTRIFICATION IN OTM AND MD ACCN OF 883 AT BN ASC, AOI, STN GYM, SWIMMING POOL, T-68, AND NCC GP HQ, 8 UP GIRLS BN NCC, P-56 AND P-40 UNDER GE(EAST) BAREILLY
Renovation of Auditorium at Harivansh Rai Bachchan Cultural Center, University of Allahabad, Prayagraj comprising of Architectural and interior planning, Wall Paneling, False Ceiling, Stage Flooring, Auditorium chairs etc. including electrical works comprising of Internal E.I., DG Set, Audio-Video System, Stage Lighting, VRF Air Conditioning, Fire Fighting etc.
A/R & M/O to Income Tax Office Building and Residential Quarter at Radhika Vihar Mathura during 2026-27 (SH 1 : Minor repair, plaster & flooring work at Income Tax Office Building) (SH 2 : Attending day to day maintenance complaints in Income Tax Office and Residential Quarters.) Subwork/Packages: Civil Work
As per Boq
As per Boq
As per Boq
Modification of FIP Ly including complete electrical, 02 x Wall fans & Vinyl/wooden flooring
Construction of flooring in store and site office at canal colony rasulabad kanpur dehat
COMPUTER CHAIR FOR CLERKS, GAMLA STAND, FLOWER POT, BAMBOO JAFRI, PICTURE LIGHT, GRASS FLOORING
REPAIRING OF ROOM, FLOORING/TILES IN A.E. (M) OFFICE AT E.D.D. MAHMUDABAD, DISTRICT-SITAPUR.
UCCH PRIMARY VIDHALAY (1-8) CHAUMUHA KE KAMRO ME FLOORING TILES LAGANE KA KARYA
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Hospital; Civil Work; Service Provider, and Installation of Plant/Systems/Equipments (Version 2) - Hospital; Wooden Flooring System for Badminton Court Flooring Technical Specification; Service Provider
Hariparvat Zone-1 Room No. 25 In place of drain repair and road improvement work by C.C. flooring from house no. 16/240 to 16/274 and 16/260 to 16/276 onwards in Kuttambi Bhairo, Zone-2 Room No. 25 Drain repair and road improvement work by C.C. from
Zone-1, Ward No. 68 (Noori Darwaza) Repair work including construction of CC flooring and drains in the area spanning House Nos. 10/1 through 10/8 to 10/21, House Nos. 10/203 to 10/208, the Patel Nagar Chowk lane (10/18 to 10/35), and connecting lan
Renovation of Auditorium at Harivansh Rai Bachchan Cultural Center, University of Allahabad, Prayagraj comprising of Architectural and interior planning, Wall Panelling, False Ceiling, Stage Flooring, Auditorium Chairs etc. including Electrical Works comprising of Internal EI, DG Set, Audio-Video System, Stage Lighting, VRF Air Conditioning, Fire Fighting etc. (Balance Work)
Plaster Work, Plinth protection, Scraping of old coats of paints, Putty work, Interior/Exterior Distempering, Float Glass (Window Glass), Enamel paint, Replacement of plumbic fixtures (Wall tiles/WC Pan/Mirror/Bib cock/flushing cistron etc, Replaceme
AS PER TENDER DOCUMENT
AS PER TENDER DOCUMENT
AS PER TENDER DOCUMENT
AS PER TENDER DOCUMENT
AS PER TENDER DOCUMENT
Please Refer to tender document
Plastering, Flooring and arrangement of drinking water in Mohalla Peerzada Primary School under Operation Kayakalp.
Door Curtains, Curtain Rod, Photo with Frame, Rubber Matting, Flooring Mat, Foot Mat, Brief Case
Dismantling reinforcemnet cement concrete or reinforcement brick work Including sacking of materials of electician and mech Diesel and mech RAC theory room, Provinding and laying of 8 to 10mm thick ivory or light shade vitrified tiles of 600X600 mm ... in flooring work ...
PROVN OF SEPTIC TANK FOR 100 USERS AND SOAKAGE WELL FOR JCOS/OR LIVING BLOCK AT 8 ATAL AND PROVISION OF CHAIN LINK FENCING AND HARD STANDING AT SKP AND ADDN ALTN TO TOILET BLOCK AND FLOORING AT BLDG NO T-49 C ND 49 HAVLOCK LINE AND ADDN/ALTN OF IN
SPL REPAIR UPGRADATION OF ELECTRIC WIRING IN BLDG NO P 06 P 07 P 08 P222 P225 AND P226 48 X JCO OR FAFA AND ADDN ALTN TO FLOORING JOINERY WALL PANELLING AND ALLIED WORKS IN THE LIBRARY AT JAG BRANCH OF BLDG NO P94 AT HQ CENTRAL COMD UNDER GE EAST L
ADDL ALTN TO BLDG NO P324 OFFICE 215 FD WK AND SPL REPAIRS TO FENCING AND BDY WALL FROM KUMAON GATE TO RED EAGLE CHOWK AND SPL REPAIR TO PARKING SHED NEAR BLDG NO P-85 AND ADDN ALTN TO FLOORING PVC WALL PANELLING AND ALLIED WKS OF BLDG NO P-92 UNDE
A/R & M/O to Non-Residential building, SOI Campus, Uppal, Hyderabad during 2023-24. SH: (1) Repair of security room and toilet block and gate at main entrance gate. (2) Repair of security room at wicket gate. (3) Repair of MT section toilet block. ... of flooring in
Repairing & New Heavy duty Epoxy/PU flooring on working area/Pathways of BLW Workshop SAS (F&M), Turbo Shop, EES,ETS,TAS,LFS (New), LFS (Old),TMS+SMS,LTS,TMS,SMS,LAS, LMS,LTS,GM Turbo assembly/Clean room and super charger, Engine test shop, SAS, LFS pathways, Block shop, ASRS etc.
WALLPAPERS INCL INSTALLATION, WALL PANELL CELLING, VINYL FLOORING 1.3mm, Toughened glass, ALUMINIUM DOOR 8 BY 4