Loading…
Loading…
5,112 results • Best match
COMPREHENSIVE ANNUAL MAINTENANCE TO WALL, TOILET, KITCHEN, FLOORING, BATHROOM, SANITARY FITTINGS, ROOF TREATMENT, SMART PERIODICALS, REPAIR AND CLEANING OF SEWAGE LINES AND SEPTIC TANKS, REPAIR AND MAINT OF B/R AND E/M RELATED ISSUES IN MD ACCN IN O
8517/E8 MAINT AND CERTAIN REPAIR/REPLACEMENT SANITARY FITTING, PLUMBING WORKS, ROOF/SUNKEN TREATMENT, PCC FLOORING, BRICK WORK, ATT, INCLUDING INTERNAL ELECTRIFICATION OF OTM AND MD ACCN OF FD HOSP NO 1 AND FD HOSP NO 2 UNDER GE (EAST) BAREILLY
Zone-1, Ward No. 01 Construction and repair work involving CC flooring and drains in the following areas the lane with the water plant (starting from Adarsh Bauddh Vihar in Kazipada Swaroop Nagar and passing through the intersection known as Dr
Facility Management Services - LumpSum Based - Office Work; Tiles work 30 sqm with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Electrician Work with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Door and Chowkhat with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Drain Pipe and pipeline work with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Wash Basin, Commode and Other bathroom accessories with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Dismentling of tiles; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Painting works with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Aluminium partition with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Glass & Mirror work with material; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Office Work; Labour; Consumables to be provided by service provider (inclusive in contract cost)
TILING OF FLOORS OF BARRECK NO. 04 AND 05, REPAIRING OF ROOF AND DOORS OF DOG SQUAD IN POLICE LINE ALIGARH
As per Boq
As per Boq
As per Boq
Bed flooring of V.R.B at Km. 79.800 of Gonda Br.
Bed flooring of V.R.B at Km. 82.500 of Gonda Br
Bed flooring of V.R.B at Km. 83.600 of Gonda Br
Bed flooring of V.R.B at Km. 81.500 of Gonda Branch.
Bed flooring of V.R.B at Km. 98.150 of Gonda Branch.
Bed flooring of V.R.B at Km. 78.800 of Gonda Br
Bed flooring of V.R.B at Km. 80.800 of Gonda Br
Bed flooring of V.R.B at Km. 94.450 of Gonda Branch
Repair of toilet of Composite Girls No. 1 located in Gujaratian of Shamli city area, installation of floor tiles in class office kitchen store and verandah and repair and painting work of the entire school.
Plinth Protection, Exterior water proofing cement paint, Interior Acrylic distempering, Scrapping Synthetic enamel paints, Wall Tiles, Indian type W.C. Pan, Wash Basin with waste pipe, Looking Mirror, Bib Cock
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR NON AC COACHES SIZE 14000 MM L X 1620 MM W X 2 MM THICK CONFIRMING TO RDSO Specn. NO RDSO/2006/CG-12(Rev-2 OF Sep' 23) AND COLOUR SAMPLE CODE NO NACFLG- 02
Zone-1 Chhatta Ward No. 99 Repair work including construction of C.C. flooring and drains from Kalyan Ji house to Singi Gali, from Baag Wala Mandir to Gulabkhana Mor, from Baag Wala Makan to Krishna Ji house, Koliyan Gali and link lanes
REPAIR/MAINT TO ROOF SHEET ROOF TREATMENT JOINERY FLOORING BOUNDARY WALL FENCING DRAIN MECHANIZED PERIODICAL SERVICES AND SEWAGE DISPOSAL AND MISC B/R WORKS AT SOLAR POWER PLANT AND VARIOUS E/M INSTALLATIONS BLDGS AT CHCC BASE HOSP CMDC AND SOI AREA
Zone-1 Ward No. 99 Construction of CC flooring and drain repair work in Patema Gali, from the gate near the silver factory, passing by Kishore T.B. house, to the square near Surya Bhai house, in Rajkumar Gurnani area and connecting lanes.
Tender for Renovation of toilet left side of room CR-108, tiles flooring and painting work in chamber of Dr. Subrata Panda and rajputana hostel warden Qtr no. 2, PF of aluminium partition and painting work in Laboratory, PF of water connection, labor
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR NON AC COACHES SIZE 14000 MM L X 1620 MM W X 2 MM THICK CONFIRMING TO RDSO Specn. NO RDSO/2006/ CG-12(Rev-2 OF Sep' 23) AND COLOUR SAMPLE CODE NO NACFLG- 02.
REPAIR AND MAINT TO JOINERY WKS, PLUMBING WKS, SEEPAGE/LEAKAGE, FLOORING, PLASTERING, BRICK WKS ETC AT CERTAIN MES, STN HQ MD AND OTM ACCN INCLUDING REPAIR TO DRAIN, FENCING, CULVERT, PATH AND COMPOUND WALL UNDER AGE B/R-II AT GE JHANSI
SPECIAL REPAIR TO ROOFING SHEETS FALSE CEILING FLOORING PLASTERING IN BLDG NO P 39 OF RECORD AND BLDG NO P 31 OR LIVING BK OF RVC CENTRE COLLEGE UNDER AGE BR II AND AGE E M I OF GE NORTH MEERUT CANTT
CERTAIN REPAIRS TO JOINERIES, PLASTERING, PCC FLOORING, DRAIN, PLINTH PROTECTION, ROOFING, RENOVATION OF TOILET/BATH/KITCHEN, SANITARY AND W/S FITTING AND ALLIED WORK IN MD ACCN, OTM ACCN LOCATED AT ZONE D AREA OF AGE B/R-I UNDER GE (EAST) LUCKNOW
CERTAIN REPAIR TO JOINERIES CUP BOARDS INCL ALUMINIUM WORK, PANELLING, CEILING, PLASTERING, FLOORING, PLINTH PROTECTION, ALLIED WORKS IN MD AND OTM ACCN LOCATED AT ZONE D AND OFFRS MD ACCN NEW DEFENCE COLONY AREA OF AGE B/R-I UNDER GE (EAST) LUCKNOW
REPAIR TO TOILETS FLOORING PLUMBING SANITARY FITTINGS FIXTURES IN NIRBHAY VIHAR HAVELOCK LINE COMPBELL LINLE 1/11 GR 11 GRRC THIMMAYA MARG KASTURBA ROAD RAK SF MGSF GAUR ENCLAVE DILKUSHA RAK MARG AND OTHER JCOs/OR MD/OTM ACCN UNDER GE WEST LUCKNOW
Zone-1 Ward No. 100 - Repair work including construction of CC flooring and drain in link streets from Ikram Bhai house to Mufeer house in Barber Mandi Topkhana, from Mufeer house to Guddu Bhai house via Kamle house, from Mosque to Amin
Kalidas Marg sthit aawas no-7 me camp karyalay me bookshelf banana asthai kaksh ke bahar ACP sheet lagana dining hall ki wooden shatigrast flooring ki jagah tiles lagana dining area me wash basin ki jagah vanity lagana kitchen me shatigrast cabinet b
Vikramaditya Marg sthit aawas no.01 purana mein bhutal bhag per Lage sabhi darwazon mein Door closer lagana, piche ki taraf asthai shade dalna awaas mein Bane jeene va Pratham tal ke shatigrast wooden flooring ki marammat karna, aawas ke Pratham tal
Repair for Compound Wall Work, Renovation of kitchen of Type A ,B,C-48 quarters, External drainage works, Water proofing of Type B,C-, Renovation of Flooring and Toilet of A-type quarters at ESIC Residential Vasna colony and stage works, Ahmedabad
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR NON - AC COACHES SIZE 14000 MM L X 1620 MM W X 2 MM THICK CONFIRMING TO RDSO Specn. NO RDSO/2006/CG-12(Rev-2 OF Sep' 23) AND COLOUR SAMPLE CODE NO NACFLG- 02.
Zone-1 Chhatta Ward No. 68 Noorie Darwaza Sabun Katra Dhobi Wali Gali Construction of CC flooring and repair work at various places in Building No. 11/141, 11/127, 11/136, Jwala Theatre Walon Ka House, Suleman House and link lanes.
REPAIR TO WALL PLASTER FLOORING TILLING SEEPAGE JOINERY AND SANITARY AND OTHER ALLIED WORKS IN OTM ACCN IN 522 ASC BN 16 RAJ RIF 409 FD AMBULANCE 8 GRENADIERS 827 FD INT OFFICER UNDER AGE BR I OF GE NORTH MEERUT CANTT
REPAIR/MAINT TO ROOF SHEET, ROOF TREATMENT, JOINERY, FLOORING, FALSE CEILING, INTERLOCKING TILES, BOUNDARY WALL AND MISC B/R WORKS AT VARIOUS E/M INSTALLATIONS BLDGS AT CH (CC) AND OFFICE COMPLEX OF GE E/M OFFICE UNDER GE E/M LUCKNOW
ADDN/ ALTN TO FLOORING ROOF TREATMENT AND ALLIED WORK AT BLDG NO P 118 (NCC OFFRS MESS) AND SPL REPAIR TO BOUNDARY WALL AT NCC DTE HAZRATGANJ AT NCC DTE (UP) LUCKNOW ALONGWITH CERTAIN SPECIAL REPAIRS AND MINOR WORKS UNDER GE (WEST) LUCKNOW
SPECIAL REPAIR TO PLASTERING FLOORING ROOF DOORS WINDOWS AND FEEDING MANGERS INTERLOCKING TILES IN PATHWAY AND ELECTRIC POINTS IN SURGICAL WARD BLDG NO 169 OF RTS AND DEPOT SAHARANPUR PROVN OF WAITING SHED FOR COLLECTION PARTY AT 297 COY ASC SUP ROOR
Zone 1, Ward No. 96 (Dhankot) CC flooring and drain construction/repair work in Dhankot (covering the small and large Fabbara areas)extending from the water tank near Mughal Vatika, passing by Asal shop, up to House No. 26/17, including the lan
Zone-1, Ward No. 01 (Kazipada) Repair work including CC flooring and drains spanning the area from Lala Ji Provision Store (via Santosh Chowk) to Arvind Bhilavali house (Building No. 27/243), as well as the area around Narayan Bhai Chowk (Bui
COMPREHENSIVE REPAIRS TO CHAJJA, PLASTER, WALL CHAJJA, FLOORING ETC AND OTHER MISC REPAIR WORKS IN JCOS/ORS, DEF CIV MD ACCN AT STAGING CAMP, ANUJ ENCLAVE, BI LINE AND OTHER MD ACCN UNDER AGE B/R-II AOR AT NEW CANTT PRAYAGRAJ
Zone-1, Ward No. 92 Rawatpada, Namak Ki Mandi Repair works including the construction of CC (Concrete) flooring and drains along the stretch from the main gate (Phatak) past Radhika Jewelers up to Chaube Ji gate, as well as in the connecting link
Zone-1, Ward No. 92 Rawatpada, Vaid Wali Gali Repair works including the construction of CC (Concrete) flooring and drains along the stretch from Gupta Masale Walas, passing by the Radhakishan Temple, up to Kamal Payal Sons, as well as in the conn
Zone-1, Ward No. 100, Nai Ki Mandi Repair works including the construction of CC flooring and drains in the stretch extending from Mira Husaini Chhoti Hathai (Baudh Vihar), passing through Puchayal Bhawan, up to the Lal Building, as well as in the
COMPLETION OF LEFT OVER WORK IN RESPECT OF CA NO GE/EM/LKO/HOSP/72 OF 2024-2025 REPAIR / MAINT TO ROOF SHEET ROOF TREATMENT JOINERY FLOORING BOUNDARY WALL FENCING DRAIN MECHANIZED PERIODICAL SERVICES AND SEWAGE DISPOSAL AND MISC B/R WORKS AT
Zone-1, Ward No. 01 (Kazipada) Repair work including the construction of CC flooring and drains covering the stretch from the Haat Maidan (near Bhuri Singh house) and the area near Ranveer Singh Dataram house, passing by Indrajit house up to R
SUPPLY OF PVC FLOORING SHEET TO DRAWING.NO LWACCN/EOG/GR -4-1-003, ALT-NIL ITEM NO 5 TO 16 AS PER SPEC. RDSO/2006/CG-12 REV-01, AMD-1 TO 5 FOR GARIBRATH COACHES .FOR COLOUR SCHEME REFER DRG NO.ED41002
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR AC COACHES SIZE-14000 MM L X 1620 MM W X 2 MM THICK CONFORMING TO RDSO Specn. NO. RDSO/2006/CG-12 (REV.1) OF Aug. 08 and COLOUR SAMPLE CODE NO.AC FLG-01 CO
Zone-1, Ward No. 99, Peepal Mandi Repair work, including the construction of CC flooring and drains, in the lane and drain near Lakshmi Traders, the stretch from the Peepal Mandi garbage collection point to Mangode-wali-ki-Dukan, and connecting lane