Loading…
Loading…
5,112 results • Best match
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR AC COACHES SIZE 14000 MM L X 1620 MM W X 2 MM THICK CONFIRMING TO RDSO Specn. NO RDSO/2006/CG-12(Rev-2 OF Sep' 23) AND COLOUR SAMPLE CODE NO ACFLG-01
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR AC COACHES SIZE 14000 MM L X 1620 MM W X 2 MM THICK CONFIRMING TO RDSO Specn. NO RDSO/2006/CG-12(Rev-2 OF Sep' 23) AND COLOUR SAMPLE CODE NO ACFLG-01
Construction of New Shed with 05 Nos. of rooms in front of SIO Office Diesel shed and Epoxy Flooring of Sub-Assembly & Bogie Section along with Shed Extension in Diesel Shed Alambagh, Lucknow in the section of SSE/W/AMV/EAST/LKO.
A/R & M/O TO GPRA COLONY AT SULEM SARAI, BEGUM SARAI & CPWD STAFF COLONY AT JAYANTIPUR, PRAYAGRAJ DURING 2026-27 (SH: PROVISION FOR ATTENDING COMPLAINTS OF WC SHEET, WASH BASIN, KITCHEN SINK, TILE WORK IN TOILET & BATHROOM, TOILET DOORS ETC AT REQUIRED PLACES IN GPRA COLONY (KENDRANCHAL COLONY POCKET-I, II, III, BEGUM SARAI COLONY & CPWD STAFF COLONY) PRAYAGRAJ DURING CHANGE OF OCCUPANCY (BALANCE WORK) Subwork/Packages: MAINTENANCE WORK
A/R & M/O TO GPRA COLONY AT SULEM SARAI, BEGUM SARAI & CPWD STAFF COLONY AT JAYANTIPUR, PRAYAGRAJ DURING 2025-26 (SH: PROVISION FOR ATTENDING COMPLAINTS OF WC SHEET, WASH BASIN, KITCHEN SINK, TILE WORK IN TOILET & BATHROOM, TOILET DOORS ETC. AT REQUIRED PLACES IN GPRA COLONY, (KENDRANCHAL COLONY POCKET-I, II, III, BEGUM SARAI COLONY & CPWD STAFF COLONY) PRAYAGRAJ DURING CHANGE OF OCCUPANCY Subwork/Packages: MAINTENANCE WORK
WARD NO 7 PATHSHALA ROAD TRANSFORMER TO A D K JAIN COLLEGE HOSPITAL NALI REPAIR AND SIDE PATRI INTERLOCKING TILES WORK
Construction of Ward No 07 Chikan Talab towards Side of Damar Road Imbankment Retaining Wall Hume Pipe Floor and Tiles Work
Ward No- 22 Nagar Palika Parishad Muradnagar mein Kasturba Gandhi School mein tiling, shed evam boundary wall par taar fencing ka karya.
Work involving painting, roof repair, tiling, plastering, masonry, earthfilling, and other miscellaneous works at the Primary School located in Mohalla Daud Sarai.
As per BOQ
Honable Sansad Sri Sanjay Seth ji , Construction of Interlocking tile work from Vill-Panchayat Palhri me Deshraj ke house se Raju Chaudhary ke house tak.
As per Boq
As per Boq
Repairing of Mastic Flooring conforming to IS-8374 at Varanasi BP.
Construction of roof of primary school number 03 located at Gujaratian in Shamli city area, repair of toilet, installation of floor tiles in class kitchen and verandah and work of repair and painting of the entire school.
MR of Plaster Repairing Internal Painting and other Misc Civil Works in Res No 2 by 48 Res No 09 Type IV and MR of Tiles Flooring and other Misc Civil Works in Res No 16 at PN Road Staff Officers Hydel Colony Lucknow
COMPLETION OF INCOMPLETE WORK FOR SPECIAL REPAIR TO PLASTERING FLOORING ROOF DOORS WINDOWS AND ELECTRIC POINT TO BUILDING NO 8 SM BARRACK AT RTS AND DEPOT SAHARANPUR AND PROVN OF OVER HEAD SHED ON FEEDING MANGERS AT KW CHARGE AT RTS AND DEPOT SAHARAN
REPAIR TO SANITARY FITTINGS PLUMBING WORKS SUNKEN AND ROOF TREATMENT FLOORINT BRICK WORK PLASTERING WORK JOINERY TILLING OF WALL FLOORING OF MD ACCN OF 506 ASC BN 406 FD HOSP 306 FD HOSP AND 346 MED ARTY REGT AT MTTC AREA UNDER GE EAST BAREILLY
Zone-1 Chhata Room No.-92 Rawatpara Takiya Wazir Shah Maland Dargah Shah, from Building No. 4/79 Shamshad house through Building No. 4/81 Haji Salim Khan up to Vilal Mosque and link lanes, including construction of CC flooring and drain repair work
Zone 1, Ward No. 27, Bagh Muzaffar Khan, building No. 11/81, from Basant Lal house to building No. 11/90, Ajay house, building No. 11/74, Sunny Maan, to Pathwari Temple, and repair work including construction of CC flooring and drain in the lin
Zone-1 Chhatta Ward number-15 Dholikhar, from Rajdhanwar house to building number 16/130 and from 16/144 to Bittu Bhai house and from 16/115 to 16/114 and repair and construction work of CC flooring and site track in link lanes.
REPAIR /REPLACEMENT OF FLOORING JOINERY ROOFING FALSE CEILING AND ALLIED WORKS AT SERVENT QTR OF OVL USMAN ROAD CARRIAPPA ENCLAVE AND AMBEDALAR MARG AND CLEANING OF SEWAGE LINE, SEPTIC TANK AND SOAK WELL IN ZONE E AREA OF AGE BR II UNDER GE WEST L
Zone-1, Ward No. 78 Construction of a lane and drain, and repair work (including CC flooring in link lanes), extending from Building No. 5/280 and Building No. 5/254 up to the Madrasa School (specifically the lane behind the Panja Madrasa Primary Sc
Zone-1, Ward No. 15 Repair works including the construction of CC flooring and drains in the Dholikhar Badi Basti area, extending from the lane near Pramvati Bhawan up to the culvert over the Kazipada drain, as well as in the connecting link lanes.
Zone-1, Ward No. 100, Nai Ki Mandi Repair work including the construction of CC (Concrete) flooring and drains from Haveli Kabir Khan (Badi Masjid) via Building No. 5/140 up to the Haveli Kabir Khan Gate, from Shabbir Provision Store to Salim Salon,
Kalidas Marg sthit Awas No.-5 me H-1 Hall ke bahar path-way par tiles lagane ka karya, awas ke mukhya bhawan me khidki/darwazon, pallon par polish, VVIP lawn me shatigrast khidki badalkar UPVC me badalne, kamre ki shatigrast wooden flooring badalne,
REPAIRS/MAINT OF ROOF SHEET, JOINERY, FALSE CEILING, FLOORING, SANITARY AND PLUMBING WORK, INERLOCKING PATH, BOUNDARY WALL OTHER MISC B/R WORKS AND PERIODICAL SERVICES AT ZONE C AREA OF CHCC IN THE AREA OF AGE E/M (HOSP) UNDER GE E/M LUCKNOW
PROVN OF RAIN WATER HARVESTING (RWH) AT 4 ASSAM, 8 RAJ RIF UNIT AREA, OLD MH, DSC LINE AREA AND PROVN OF CHAIN LINK FENCING BETWEEN HARDING ROAD AND ADJACENT DEFENCE LAND TO POLICE LINE, PROVN OF SHED WITH INTERLOCKING PAVER FLOORING AND PERIPHERY CO
SPECIAL REPAIRS AND RESURFACING OF MT BADMINTON COURT AT OFFICERS MESS FLOORING OF BASKETBALL COURT AT CANDIDATES MESS AT MT SECTION AND PROVISION OF SECURITY LIGHT ALONG THE PERIMETER OF A1 DEFENCE LAND AT SURVEY NO 171 AT 4 AFSB VARANASI UNDER GE A
Zone-1, Chhatta Ward No. 27 Bagh Muzaffar Khan, Sheetla Gali Repair works, including the construction of CC (Concrete) flooring and drains, extending from the premises of the Tikiya-wala (Building No. 16/140) up to Building No. 16/260, as well as i
Replacement of damaged flooring and miscellaneous repair work at ground floor of Saraswati hostel at IVRI, Izatnagar, Bareilly. (CH: Vertical extension of Saraswati hostel by construction 13 seated rooms, along with washrooms on the first floor of existing Saraswati Hostel at IVRI, Izatnagar, Bareilly).
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR NON AC COACHES SIZE 14000 MM L X 1620 MM W X 2 MM THICK CONFIRMING TO RDSO Specn. NO RDSO/2006/CG-12 (Rev-1 OF Aug' 08 ) WITH Amndt. 3 OF AUGUST' 16 AND CO
FLEXIBLE PVC FLOORING WITH PVC ELECTRODE FOR NON AC COACHES SIZE 14000 MM L X 1620 MM W X 2 MM THICK CONFIRMING TO RDSO Specn. NO RDSO/2006/CG-12(Rev-1 OF Aug' 08) WITH Amndt. 4 OF AUGUST'18 AND CORRI
Zone-1, Ward No. 96, Dhankot Repair work, including the construction of C.C. flooring and drains, in the area extending from Shakeel Bauna shop in Fabbara Nai Basti to the Dhobi Pada Dhalab (ramp slope) and up to the Chauk as well as in thE
As per tender document
Construction of interlocking tile work at Village Narendi me Panchayat Bhawan (Barat Ghar) se Belwa road tak. Cluster under Shyama Prasad Mukherji RURBAN Mission Yojana Lucknow.
Construction of poultry shed at New campus under DAPSC at DPR, Rajendra nagar, Hyderabad. SH: Balance works like providing and fixing upvc windows, MS grills, door shutters, vitrified flooring & Skirting and internal and external painting etc. Subwork/Packages: Balance works like providing and fixing UPVC windows, MS grills, door shutters, vitrified floor & skirting and internal and external painting etc.
As per Boq
Bed Flooring of V.R.B at Km. 84.550 of Gonda Br. Distt- Gonda.
Bed Flooring of V.R.B at Km. 85.500 of Gonda Br. Distt- Gonda.
ward no 8 pwd road amroha ali imam ki motorbike ajency se mansoor ali shaukat bijra road abbas school tak interlocing tiles work
ward no 8 pwd road amroha road ali imam motorbike agency to bhoori house munne plot bizra road abbas school interlocking tiles work
JHAJHAR ROAD TO MANDI, UPTO MAHIPAL (PURV CHAIRMAN)SHOP IMPROVEMENT WORK VIA RCC NALI AND INTERLOCKING TILES WORK UNDER AREA OF NP, DANKAUR
Construction of Drain and Tiles work from H/O Kunwar Pal to H/O Prem in Sadhamau at Waard No-4 At NPBKT.
Remove the matting and clean the ground surface, Level the floor with cement and other materials so that there will be change of air bubbles, Installation of new vinyl flooring badminton mat Some of feature, Shock Absorption Vinyl flooring has a ... Vinyl flooring is ... Vinyl flooring is ...
SPL REP TO ROOF TREATMENT IN CERTAIN BLDG, PROVE OF PARKING SHED AT BLDG NO. P 41 P 42 AND P 108 , COLLAPSIBLE GATE, ANTI SUICIDE FAN ROD, SUN CONTROL FILM AT CPSS AND UPGRADATION OF FLOORING AT MES OFFICE AT 4 AFSB UNDER GE AF GORAKHPUR.
M and R of plaster reparing internal painting and other misc civil works in res 2 by 31 2 by 52 2 by 37 and 3 by 13 and tiles flooring and other misc civil works in res 3 by 5 at pn road staff colony lucknow
Rajbhawan colony stith awas no. 9 Type-6 me awas ke ek bathroom ka navinikaran ka karya, 3 kakshon ki floor wooden flooring ka karya, CRPF suraksha karmiyon hetu 15 logo ke rehne ke liye asthai shade ke nirmaan ka karya, PAC karmiyon hetu ek asthai s
Non- Flammable Solvent Based adhesive for pasting Flexible PVC Flooring Material to st ainless steel to ICF's Specn. No. ICF/M/D /SPEC-093. Issue Status:01, Rev:00 issued in June 1998 with amendment slip No. 1 dt. 22.06.2010 and amendment slip No. 2 dt. 05.08.2010
CA NO.CWE BLY/GE (W) /2PROVN OF STORE ROOM ALONGWITH GENTS AND LADIES TOILET NEAR BLDG NO P-112, WOODEN FLOORING, WALL PANELLING AND FALSE CEILING IN BLDG NO P-112 AND EXTERNAL CABLING WORK WITH CONNECTED WORK AT P-56 BUNGLOW UNDER GE (WEST) BAREILLY