Loading…
Loading…
1,903 results • Best match
EI works for (GPLUS3) model for single 100 bedded covid ward at Khatra SD Hospital, in the district of Bankura----SITC of HVAC system with Negative Room Pressure system.
Construction of Regional Passport Office (B G 6) and Residential Building (B G 6) with basement and Mechanical Car parkingg at New Town Kolkata including pile foundation Basement Internal Sanitary installation, Internal Electrical installation Sub ... Station HVAC system, ...
Dismentling Shifting of ductable type air-conditioning machines indoor units alongwith additional copper pipes trays from its original place to opposite side of the 18Nos Ejlashs at the new court building within the campus of District Judge Court
Supply delivery installation testing commissioning of new air conditioning machine Ductable type Split AC not less than 3 star continuous rating Capacity 5 5 TR 100 copper condenser complete with all accessories at Haldia NIZ 132KV SS WBSETCL
Annual Comprehensive Maintenance of of Window/ Split model (1.5/2.0 Ton Capacity) Room air condition Machine and 3 phase Concealed Split Ductable Split Air Conditioner Machine installed at Main Building of BSMC H, Bankura BMC Electrical Section II
Urgent replacement of Ductable Split AC and new supply,installation,testing and commissioning of Air- Conditioning at PICU, Labor room,Observation room and Extended SNCU along with Electrical Installation Work and FDA system at 1st floor of Central
Installation of Ceiling Suspended Ductable Air condition at the first floor of the South Annex Building for Public Relation and Members Pension Section and various committee sections incl Officers Cubical at Assembly House Campus Kolkata Phase I EI
Annual Comprehensive Maintenance of Window/Split model (1.5 / 2.0 Ton Capacity) Room air condition Machine and 3 phase Concealed Split and Ductable Split Air Conditioner Machine installed at Natun Bhawan of BSMC H , Bankura BMC Electrical Section II
Urgent replacement of Ductable Split AC and new supply,installation,testing and commissioning of Air- Conditioning at PICU, Labor room,Observation room and Extended SNCU along with Electrical Installation Work and FDA system at 1st floor of Central
AMC (Preventive, corrective and breakdown) of Ductable and concealed split type AC machines at various location (Academy Bldg, Anatomy Bldg, Police morgue bldg, Admn. Building, PJB Bldg and B.C Roy hostel nursing office etc) under R.G.Kar sec-III
AMC (Preventive, corrective and breakdown) of Ductable and concealed split type AC machines at various location (Academy Bldg, Anatomy Bldg, Police morgue bldg, Admn. Building, PJB Bldg and B.C Roy hostel nursing office etc) under R.G.Kar sec-III
Annual comprehensive maintenance of the overall VRF AC system including all the Split AC machines installed at the Environmental Department 5th floor Animal Resourses Development Department building LB block Sector III Salt Lake Kol 700106
Emergency repairing of 12 HP VRF Machines due to high voltage occuar by WBSEDCL end and Reinstallation of a old AC machines at Circuit House and ADM Bungalow under Asansol Electrical Sub Division II,P.W.D
Repairing and renovation work of Central AC System 5 units 4 nos 17 ton AC and One Machine of 11 ton and Installation of New 4 nos 4 ton AC Machine and 8 nos 2 ton AC Machine with 9 nos Aircurter at Bidhan Mancha Auditorium under Raiganj Municipality
Metalic stairway at the top floor of Central Library Building for ease of accessibility to the 80 Ton Chiller Plant at roof within the CNMC College campus Kolkata during the year 23_24
Round the clock operation annual of Chiller Plant along with operation of all lower side units associated with above said Air Conditioning system installed at Eden Building of Kolkata Medical College Hospital
Construction of Cable Trench for electrical duct connection to chiller plant within the campus for Open Campus Cum Regional Centre of Netaji Subhas Open University, Newtown, Kolkata under Bidhannagar East Division,PWDte.
Annual maintenance of Electrical Installation and operation of 3 nos. pcakage AC plant incl. Round the Clock (24x7) monitoring and operational maintenance work of the Master Control Panel and AMF Panels and 2 nos. DG Set inside Kolkata Raj Bhavan
Repairing Floor wall and protection of Ceiling at Electrical AC Plant Room related to Honble Chief Justice Chamber along with repairing floor of the Electrical Section Office at Ground Floor of Main Building High Court Calcutta during the year 2024
EI works for (Gplus3) model for single 100 bedded covid ward at Nayagram Super Specialty Hospital, in the district of Jhargram--- SITC of HVAC system with negative room pressure system.
Operation of HVAC System installed in Public Cord Blood Bank of 4th floor of COE Building within the campus of School of Tropical Medicine, Kolkata. (for the year 2024-25)
Arrangement of maintaining negative pressure and Air-Conditioning in respect of preparation of proposed 24 bedded hybrid CCU unit at Dr. J R Dhar SD Hospital-----SITC of HVAC system.
Electrical works with Fire Detection and Sound System, Stage lighting arrangement including HVAC with allied works for Proposed Construction of Auditorium at Malbazar in the District of Jalpaiguri,West Bengal.
EI works for (Gplus3) model for single 100 bedded covid ward at Kharagpur SD Hospital, in the district of Paschim Medinipur---- SITC of HVAC system with negative room pressure system.
EI works for (Gplus3) model for single 100 bedded covid ward at Haldia SD Hospital, in the district of Purba Medinipur----SITC of HVAC system with negative room pressure system.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; HVAC, FIVE 2 TON SPLIT ACs WITH ASSOCIATED FITMENTS FOR DESIGNATED ONLINE EXAM CENTRE (DOEC) KOLKATA; Service Provider
Custom Bid for Services - 200145176 BMC FOR STG I, STG II and STG III HVAC AREA AT NTPC FARAKKA 2025-27 Similar Category Operation and Maintenance Power House/Power Plant
Abrasive grit (G-Mess) blasting and painting of outer hull, inside main hull including all areas, tanks, void spaces etc. and all decks (main deck, 1st deck, bridge deck, AHU deck, bulwark etc.) on board Indian Navy vessel Yard 786 at SWL premises.
Urgent Replacement of 3 nos Ductable Split AC at Central Block Third Floor of Extended SNCU (Minor OT) and SITC of new Air- Conditioning Machines along with necessary Electrical Works releted to AC installation works in CSS-EI work
Annual Maintenance of 1.1 /1.5/1.6/2 Ton capacity window and Split type and 4/5.5 Ton capacity Floor standing/Ductable/cassette type AC machines installed at different places of Suri Electrical Section - III, under Birbhum Electrical Division ,PWD.
Annual Maintenance of 1.1 /1.5/1.6/2 Ton capacity window and Split type and 4/5.5 Ton capacity Floor standing/Ductable/cassette type AC machines installed at different places of Suri Electrical Section - III, under Birbhum Electrical Division ,PWD.
Operation of 360 HP VRF A C system Voltas make installed at 1st 2nd 3rd and 4th floor of Animal Resources Development Department building LB block Sector III Salt Lake Kolkata 700106 for 03 three years
Supply, Delivery, Installation, Testing and Commissioning of VRF Type Air Conditioning System and allied works for the additional Four floor at existing B G IV storied Nabadiganta Administrative Building, Salt Lake, GN-20-23, Industrial Township
Supplying, installation, testing and commissioning of chiller cum water dispenser machine with inbuilt RO purifier at 3nos hostels adjacent to department of home science, V.L college campus, Hastings house compound, Kolkata 27,C.U.
Annual Round the clock operation of Chiller Plant along with operation of all lower side units associated with above said Air Conditioning system installed at Eden Building of Kolkata Medical College and Hospital
Hiring of Consultancy Services - Percentage based - Architect/Consultant for Structural Repairs, other Repairs/Renovation and Procurement/e-Procurement of Civil Interior/Electrical/HVAC/Electronics/ITES Goods/Works/Services, Subject Matter Experts; ..
Maintenance of 2 nos. lifts, sub-station, fire alarm system, DG set etc. at Old AG Office building, Bhubaneswar during 2023-24. Maintenance of 2 Nos. of lifts, sub-station, fire alarm system, fire fighting system, VRF system, DG set etc. at New AG Office building, Kesharinagar, Bhubaneswar during 2023-24. Maintenance of 62.5 KVA DG set, 4 Nos. 500 KVA transformer, sub-station at New AG Colony, Bhubaneswar during 2023-24. Maintenance of 62.5 KVA DG set and sub-station at Old AG Colony, Bhubaneswar during 2023-24.
Comprehensive, Preventive and Corrective Maintenance of 6 Nos Ductable, Split 3 nos Split Type Room Air Conditioner machines at Ejlash of Chief Judge and Additional District Judge Bench-l and II , 1st floor English office and chamber of 18th MM 19
Shifting of 7.5 TR, 5 TR Ductable split Air Conditioners at Green Room ( Gents Ladies) in hall -1 1st and 2nd floor of Sarat Sadan Project Office respectively including copper pipping, fittings, jonting of cables and other allied works for Sad
Electrical Installation work for Shifting of Office of West Bengal information Comission, Kolkata including reconditioning of existing 12 HP Vrf AC Machine and Split type AC Machine at 1st Flr Old Khadya Bhawan, Kolkata-87.-EI work
AMC for VRF AC system (Split air conditioning system of Variable Refrigerant Flow, 3 nos. each capacity 18 HP incl. indoor,outdoor unit) installed at Howrah Irrigation Division, Betiatala, Nabanna, Howrah during 2023-24 ( 01.04.2023 to 31.03.2024)
Day to day Operation yearly basis for different Air Conditioning unit at different locations of Medical College, Kolkata Operation of VRF and other AC Plants at STM premises, Academy Building , U.N. Brahmachary Hall etc. under KMCESD PWDte
Annual comprehensive servicing and preventive maintenance of , Split type Air Conditioning machines ,VRF,Package type AC machine installed at Hybrid CCU,Main OT, Gynae OT of Imambara Sadar Hospital ,Hooghly under Hooghly Electrical Sub-Division I, P
Supply andInstallation of Water Purifier cum Chiller Machine in BIsrail High School, Thangapara High School, Sukdevpur High School, Jahangirpur High School, Bajitpur High School, Malipara High School, Bikoir Sabuj Sathi Club, Patiram Jamini Majumda
Solar based Water chiller purifier with overhead running drinking water with room at Sahapur under Binshira gram Panchayat, Hili Block, D. Dinajpur. Fund-15th F.C. (Tied) Activity Code-67233046 (2023-2024) AAP NO-17.
Supply and installation of Air Exchange Unit, Horizontal Laminar Airflow, Aeroponic Pump and Irrigation System, Aeroponic Water Chiller, Ultrasonic Humidifier and servicing of existing aeroponic units at Krishi Bhavan, Abash or PVSM Farm, Anandapur
Recirculating chiller (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6687975 Dated : 17-09-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACTING THROUGH PURCHASE OFFICER CRPU, Directorate Of Purchase And Stores, Department of Atomic Energy, Sector-1, Block-AF, Bidhan Nagar, Salt Lake, Kolkata - 700 064, OUR CASE FILE NO. DPS/CRPU/VECC/31329 (The President Of India) Splitting
AMC for maintenance of Electrical Installation including day to day maintenance, including hiring, supply of POL of Diesel Generator set (125 KVA, 3ph, AC) as a backup, power supply unit and Comprehensive servicing, maintenance of VRF AC system
Through Servicing of 3 nos Blue Star make Model No LCAI 080X53H Air Cooled Chiller of capacity 70 TR for Platinum Jubilee Building at West Bengal Legislative Assembly Kolkata under Assembly House Electrical Sub Division
Construction of Proposed Seven Storied building with Two Tier Basement for Regional Cancer Centre within compound of Medical College and Hospital, Kolkata -- Proposed Construction of Chiller Plant Room Work related to SICT of Air Conditioning