Loading…
Loading…
906 results • Best match
Maintenance of Road from NH 08 (Near Joynagar Petrol Pump) to UttarJoynagar PWD road under Jirania Sub-Division, PWD (R and B) during the year 2024-25 SH Patch Grouting, Patch WBM 3, Re-Carpetting, Seal Coat, Side Drains etc...
FDR Mtc of road from Binapani (NH-08) to Binapani HS School under PWD (R and B) Jirania Sub- Division during the year 2024-2025 SH Construction of Toe wall from Ch 0.056 to 0.126 Km (Length 0.07 Km). Group-I
Improvement of approach road 0f Babaji Vedanta Kriyayoga Dhyanashrama L 200.00 m from NH 08, under AMC ward 44, under Scheme for Special Assistance to States for Capital Investment for 2023 24 SH Construction of Covered drain, Retaining wall, Sol
Maintenance and repair of various section of existing road from Km 19.300 to Km 31.300 Design length total 12.000 Km of Agartala Khowai section of NH-208 in the state of Tripura FY 2023 24 on percentage basis- Risk and Cost.
1. Improvement of different roads and drainage system under Udaipur Municipal Council area / Road from NH-8 ( MadhabSaha house) to RabGazi house in/c road from Durgabari to Kamal saha house and road opposite to Kalibari under UMC(2nd Call).
Mtc of road Starting from Kabiraj Tilla School to NH 8 via Echa-bazar level crossing , Dukli bazar , Chandimata Club within the AMC Ward no 41 AND 44 under jurisdiction of Central VI Sub Division during the year 2020 21
Development of road from NH 108 to Polestar Club via Manipuri para L 1.40 K.M. from Ch. 0.00 M to 600.00 m under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM, PMC, Seal Coat, Drain etc. Gr 1
Development Of road from NH 08 Pecharthal to Shilcherra Bidharshan road L 5 25 Km during the Financial year 2026 27 Under the Scheme for Special Assistance to States for Capital Investment SH Surface drain Patch Metalling Patch Carpeting Sea
Development of road from NH 108 to Polestar Club via Manipuri para L 1.40 K.M. from Ch. 600.00 M to 1400.00 m under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM PMC Seal Coat Drain etc. Gr 2
Development Of road from NH 08 Pecharthal to Shilcherra Bidharshan road L 5 25 Km during the Financial year 2026 27 Under the Scheme for Special Assistance to States for Capital Investment SH Surface drain Patch Metalling Patch Carpeting Sea
Development Of road from NH 08 Pecharthal to Shilcherra Bidharshan road L 5 25 Km during the Financial year 2026 27 Under the Scheme for Special Assistance to States for Capital Investment SH Surface drain Patch Metalling Patch Carpeting Seal
Development of black top road from Tulabagan Chowmuhani (NH-108B) to Dhigalia-Abhicharan road via officetilla (L-5.00 km) (Ch-0.00 to Ch- 1.350 km)during the year 2026-27/SH Grouting,Carpeting,Tack Coat, Seal Coat,Surface drain,etc.
Placing of wire crates, earth filling, brick soling, protection work etc.
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
SH- Construction of Slab Culvert , Pucca Drain near Nityananda Reang house during the year 2025-2026.
Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2023-24
Re carpeting, protection work, road side pacca drain etc.
PR of road from Kanchanpur Trijunction to NH 44A via Kanchanpur SDH ( Total Length 0.600 km ) under Jampui Hill Sub Division, PWD(R and B) during the year 2023-2024/SH WBM,Tack coat, carpeting, seal coating, Maintenance of Drains, Kacha drain etc.
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length - 9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch.4.79 Km(R/S),7.41 Km (R/S) and 8.15 Km(L/S).
Improvement of road from Gokulnagar Panchayet Office to NH 208 under Kumarghat RD Block L 1 550 km under PWD R and B Division Kumarghat SH Widening GSB WBM 2 WBM 3 Carpeting Road side drain CD including protection work etc Fatikroy Assembly
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length -9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch. 4.79 Km(L/S), 7.13 Km(L/S) and 7.28 Km(L/S).
Periodical Repair of the road from i Old AA road to NH 08 via Kumarghat Block office Total Length 650 00 mtr and ii Kumarghat Buddha Mandir road L 350 00 mtr during the year 2025 26 SH Patch metalling Grouting Carpeting etc
Maintenance of road from NH 08 (Ghoramara bridge) to Durganagar (L 2.527 km) during the year 2022 23 SH Removal of un suitable soil, patch grouting, and re carpeting etc. (Road length from CH 0.750 km to 2.527 km to be repaired)
Periodical renewal of PMGSY handed over Road from NH-8 to Thanabul Halam para via Megazine para (Link No -045) (L-5.90 Km) during the year 2023-24 under Suvarna Jayanati Tripura Nirman Yojona/SH-Grouting, patch repairing, re-carpeting , seal coat e
PR Of road from NH 08 Ptl Petrol pump to Ptl Railway Station road L 1 00 Km during the year 2025 26 SH Surface drain Patch Metalling Carpeting Seal coat and Protection works from ch 0 00 km to ch 1 00km
Improvement of brick soled road to all weather road from NH 08 (Ghuramara bridge) to Durganagar road near Santosh Acharjee house to Ratan Nagar and road starting from Purba Noagaon School to Manipuri Para under Old Agartala RD Block (L 2.125 km)..
Mtc of road from US road (NH-8) to Kalambari via Chankhala Para, Sabroom South Tripura under Satchand Block (L-2.00 Km) S.H. - Patch Metalling, Re-Carpeting and Seal coat etc. during the year 2023-2024. Portion from 0.00 km to 1.000 km
Upgradation of road from NH 08 to Depacherra Road via Dayal Para AWC under Pecharthal Assembly Constituency of PWD R and B Kumarghat Division Length 2 30 km under the Scheme for Special Assistance to States for Capital Investment for 2024 25_2nd
Periodical Repair of road from near P S to F C I Godown and NH 08 near Naydrone School to Ratiabari via Biplab Deb house during the year 2021 22 SH Patch metalling Grouting Carpeting Sand seal coat etc Length 810 mtr
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length - 9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch. 6.562 Km(L/S), 6.73 Km(L/S) and 6.80 Km(L/S).
Development of roads from (i) Road from NH44 to NH44 via Bridhyanagar Dighirpar. (L 0.700 km) (ii)Road from NH-08 (Guramara Bridge) to Kali Nagar via Durga Nagar (PMGSY) road (L 2.000 km), (iii) Shibbari old Agartala to PWD road Sukanta palli..
Urgent FDR of road from i) MG Road to Netaji Nagar Jame Masjid via Rajendra Palli. ii) Geet Bharati road. iii) NH-08 to Jagannath Chowmuhani via Housing Board during the year 2024-25../SH- Brickwork, metalling, carpeting, grouting, Seal coat etc
Periodical Renewal of road starting from Shibmandir road to NH 08 via Uttar Pabiacherra Coloney High School Total length 1 point 50 Km and road from Saradapally road near Kartik Das house to Ratiabari road near petrol pump via Kalyan Ashram during th
Urgent Maintenance Gakulnagar Panchavat area from NH 208 to House of Biswant Deb House L 0 10 Km during the year 2024 25 under the jurisdiction of Ganganagar PWD R AND B Sub Division under Kumarghat Division SH Stripping Soling WBM Tack Coat
Mtc. Of road from NH-208(RCC Bridge) to Patichari High School via Madhukrishna Para( L-1.50km) under the juridiction of PWD(RandB) Karbook Sub-division during the year 2025-26/SH-WBM, Re-carpeting, sand seal coating,Surface drains and road protectio
Utility shifting of DWS Pipeline of water supply schemes/ SH- Dismantling of CI/DI and PVC Pipeline along with necessary fittings, sluice valves, relaying of pipeline and, layimg of new pipeline in damaged area etc. complete at L404-NH 208 to TRPC Co
Maintenance of PWD road from DK road to NH via Bagha Jatin Club under PWD RandB Khowai Subdivision during the year 2026 27 SH Construction of RCC drain RCC drain cover and brick work etc. Ch. 0.00 Mtr. to Ch. 400.00 Mtr.
Utility shifting of drinking water supply pipeline at Jamarai Para IWP M Well at Natunpara schemes and other allied works etc. under DWS Sub Division Kanchanpur NH 44 to Jamarai para Dist North Tripura Package TR0307 P4 during the year 2026 27Gr III
Utility shifting of drinking water supply pipeline at Jamarai Para IWP M Well at Natunpara schemes and other allied works etc under DWS SubDivision Kanchanpur NH 44 to Jamarai para Dist North Tripura Package TR0307 P4 during the year 2026 27GR IV
Development of road from NH 08 near Panthanivas to Chitagangbasti in c allied road at Ratiabari T Length 1500 00 mtr under Scheme for Special Assistance to States for Capital Investment for 2026 27 SH Patch GSB Patch WBM and Carpeting etc fro
Development of road from NH 08 near Panthanivas to Chitagangbasti in c allied road at Ratiabari T Length 1500 00 mtr under Scheme for Special Assistance to States for Capital Investment for 2026 27 SH Patch GSB Patch WBM and Carpeting etc fro
Consultancy services as AE for Supervision of Construction of four lane with paved shoulder Agartala bypass connecting NH-8 to NH-108B in the state of Tripura
CC Raod
Patch WBM, Grouting, carpeting, Seal coat etc. (Group - I)
SH- Grouting, Re-carpeting, Tack Coat, Seal coat etc. during the year 2025-26
WBM- 3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
Patch WBM, Grouting, carpeting, Seal coat etc. Group - II.
Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2023-24.
SH-Metaling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2025-26. (2nd Call)
FDR Mtc of road from Binapani (NH 08) to Binapani HS School (Ch. 0.90 to 1.20 Km, Length 0.30 Km) and Binapani club to Ranjan Debbarmas house (Ch. 0.00 to 0.60 Km, Length 0.60 Km) under PWD (R and B) Jirania Sub Division..Group III