Loading…
Loading…
906 results • Best match
Periodical Repair of the road from i NH 08 near Subash Sanga Club to Pabiacherra L 250 00 mtr ii Surjyasen road L 230 00 mtr and iii Chakachira Chakma house road L400 00 mtr during the year 2024 25 SH Patch WBM Patch grouting and Carpe
Mtc. of road from Kailashahar -Golakpur road to NH-208 via Halai Basti,Jarultali and Chaintail ferryghat road 0.460 km during the year 2023-2024 SH patch soling, patch matelling ,grouting ,re-carpeting , seal coat etc 2nd call
Const of C.C.Road from (i) NH-8 near Shanitala to n/h of Babul Das at ward 07 (ii) RCC drain n/h of Lokesh Debnath to Dinesh Das under Kumarghat Municipal Council during the year 2023-24
FDR of road from Chantail-ferryghat to NH-208 near Chantail High School via Halairpar R.C.C. Bridge during the year 2024-25. L 3.473 km SH soling, metalling, grouting, carpeting, re-carpeting, sand seal coat, etc.2nd call
Mtc. of road from KA road to Forest Rest House(L-300.00 m) and mtc. of road from NH-8 to CMO Office Building( L-120.00 M) at Ambassa/SH-Grouting, WBM-3, re-carpeting, protection wall etc.
Mtc. of road starting from Garjantalli -Damdama via office tilla and SDM office road to NH-8 (Damdama) - Harinarayan pur road via Nipu Debnath house (L-0.105 Km.) SH- Paver Block road etc. During the year 2025-26
Imp of rd frm 1 Fulbarikandi PWD road to Kacharghat Hiracherra road W No. 5 of Hiracherra Panchayet via Uttar Barkhala Jhameh Masjid L1.15 Km ,2 Ichabpur Embankment to NH-208A L 3.94 Km.... under Kls 2024-25
Upgradation of brick soling road from Police Line bazar to NH-08 via RF Tilla School, Thakur para, Police para and Nimai Datta para under the Scheme for Special Assistance to States for Capital Investment for 2024-25
Maintenance of Road from Manupuri chowmuhani shib mandir to Mohinipur via NH 108 B during the year 2025-26 / SH Grouting, WBM-III, Carpeting ,seal coat etc.(L-2.80 KM) (ch. 1.40 KM to 2.80 KM)/Gr-II
Improvement of road from NH 08 Narayan Saha House to Dhananjay Majumder House near Howrah river via Christian Para during the year 2022 23 SH Metalling, carpeting, construction of CD and protection work Ward No 09 GR I
FDR_Maintenance of road during the year 2024_25 _ Maintenanace of Road starts from Chandrapur NH(Rajarshi Motors) to Reshambagan BT road via Tata Kalibari road under AMC ward no 10 _SH_ Patch soling, Patch WBM ,PMC , Sand seal coating
Estimate on implementation of Road Safety Audit report as per recommendation of CRRI, New Delhi for the work of 20.00 km stretch from Lichubagan Tri-junction to Mohanpur Intersection of NH-108-B in the State of Tripura.
Shifting of existing 33 KV 11 KV LT line and Service Connection from Panitilla 318 to Sidongchara 343 KM in connection with construction and widening of NH 08 44 AA Road within the jurisdiction of Electrical Sub Division
Mtc of road Starting from NH 08 to Kabiraj Tilla School via Chandimata Club within the AMC Ward no 44 during the year 2021 22 SH Construction of road side from Chandimata Club end to Bankumaree Kali Mandir
Ordinary repair of Agartala Bypass NH 08 of length 12.908 Km in stretches from Ch 0 km Khayerpur Tri junction to Ch 12.908 km Amtali Tri junction in the state of Tripura on Percentage Rate and Work Order Basis
FDR Maintenance of road from NH-08 (pallimangal School to upto Thanda Kalibari Rcc bridge via Banikya Chowmuhani (L 6.20 Km) under the jurisdiction of PWD(R and B) Khayerpur Sub Division during the year 2024-25 Group 01
Improvement of road from NH 08 to Darchawi Shermontilla road near Pajendra Para via Sidongbanapally High School under Valley ADC under Pabiacherra Assembly Constituency L 3575 Km of Kumarghat PWDR and B Division under the Scheme for Special Assistanc
Mtc of approach road of East Gakulnagar GP near Ayushi Hotel from NH-08 (L-0 point 09 km during the year 2023-24 / SH Embankment construction bituminous and non-bituminous work protection wall CD and other allied works
Mtc of road from NH-8 near Sukumar Debnath house Satchand Bazar to DDMR School (L-1.00km) / SH- WBM-III, carpeting and seal coat etc. During the year 2024-25. (portion from 0.00 km to 0.555 km) Gr-I
Mtc. of road starting from NH-08 at Jawharnagar (Near BSF Camp) to Babukumar (Length - 9.20 Km) during the year 2025-2026/ SH- Constn. of R.C.C Retaining Wall at Ch. 6.43 Km(R/S) and 7.41 Km(L/S).
Mtc. of different roads from a. Brajanagar PWD road Bankumari to Gopal Chowmuhani via Uttar Majlishpur G.P Office L 2.00km b Mohanpur East NH 08 to Harijoy chowdhury para L 1.15km c Brajanagar HS school to Narayan debnath House....
Maintenance of road from College Chowmuhani to Nh 208 Via Sabhadipati House L 1 point 50Km during the year 2023 24 under the jurisdiction of Ganganagar Sub Division SH Stripping Soling Pot hole Repair Tack Coat Carpeting Seal coat
Maintenance of State Highway starting from NH 08 (Pallimangal HS school) upto Thanda kalibari RCC bridge via Banikya Chowmuhani (Length 6.20 km) SH Removal of un suitable soil, patch grouting, PMC work, Seal coat, application of rubber brush over...
Mtc of Sing para road under Damdama Gram panchayet Sabroom starting from NH Railway Station Road to Debasish Majumder house Ch. 0.00 Km. to 0.24 Km SH missing Soling, Toe wall metalling Carpetting etc during the year 2020 21
Periodical Repair of road from NH 08 Pecharthal Petrol Pump to Tumbra Basti Anganwadi Centre via Ganoranjan Chakma House Length400 mtr under PWD RandB Pecharthal Sub Division during the year 2024 25 SH Patch Soling WBM 3 Carpeting Sea
Maintenance of road Starting from NH 08 to Muddapara (Bamboo Market Road) under the jurisdiction of PWD(R and B) Khayerpur Sub Division during the year 2024 25 SH Providing and laying of paver blocks, Patch Metalling, Patch grouting...
Mtc of road Starting from Kabiraj Tilla School to NH 8 via Echa-bazar level crossing , Dukli bazar , Chandimata Club within the AMC Ward no 41 AND 44 under jurisdiction of Central VI Sub-Division during the year 2020
Development of black top road from Tulabagan Chowmuhani (NH-108B) to Dhigalia via protective home (L-2.00 Km) (Ch- 0.00 Km to Ch- 1.40 km) the year 2026-27/Sh Grouting, Carpeting, Track Coat, Seal Coat, Surface drain, etc
Strengthening of road from Mohanpur NH road to Devendra Chandra Nagar Waste Processing site (CBMTF) (L-2.40 km) during the year 2025-26/ SH Patch soling, WBM-2, WBM-3, BM, Carpeting and seal coat and RCC work etc.
Restoration and Repair of NH-08 (Total length-13.50Km)
Mtc. of roads starting from (1) Upanagar C.R.P.F Camp Trijunction to NH-08 (L-900.00 Mtr) (2) Satyaram Chowdhury H.S School Approach/ Internal Road (L- 330.00 Mtr) at Upanagar (3) ADC Sub-Zonal ofice Approach/ Internal Road (L-100.00Mtr) at Upan
FDR of road from NH 08 Pecharthal to Kamalapur road L 2 086 km from Ch 0 450 km to Ch 1 550 km during the year 2024 25 SH Surface drain Patch Carpeting Patch Carpetting Seal Coat Protection works etc
Mtc. of road from Ghoramara Bridge (NH 08) to Nitai Barman House (Near Haribala Samiti) under Jirania Sub Division, PWD (R and B) during the year 2022 23 (L 0.55 Km) SH Grouting, Patch metalling, Re carpeting, seal Coat, Painting etc.
Mtc of 1. road from NH 208A to Unakoti L1.00 km 2.Old K.K road L3.5 km SH jungle cutting Patch metalling, grouting, recarpeting, seal coating including road sinage, painting, and protection work etc complete during the year 2025 26
Mtc Of road From NH 08 to Pecharthal PHC via Pecharthal TK road L 1 point 00 Km from Ch 0 point 40km to 1 point 00 km during the year 2023 24 SH Pot holes repair Re Carpeting Toe wall
Mtc Of road from Satchand to Bankul (NH-08) via Sindhuk pathar (Length 5.500 km) SH GSB, Patch metalling, Patch carpeting and unlined surface drain etc. during the year 2021-22. Gr-I (Portion from ch 0.00 km to 2.50 km)
Mtc Of road from Satchand to Bankul (NH-08) via Sindhuk pathar (Length 5.500 km) SH GSB, Patch metalling, Patch carpeting and Unlined surface drain etc. during the year 2021-22.( Gr-II )(Portion from ch 2.50 km to 5.50 km)
Strengthening of road from Mohanpur Bazar to Brajanagar via Suhanmani Ashram (L 3.725 km) and from Joynagar (IS Office) NH 08 to Vrigudas bari via Joynagar (L 4.000 km) under Jirania RD Block (L 7.725 km) under RIDF XXIX of NABARD
Improvement of roads and Construction of Drains for (i) Road from Industry- Sataria PWD road to Tepania Panchayet (Panna Chowmuhani) via Goalgoan.(ii) Road from NH-8 (near Maruti show room) to Industry-Sataria PWD road (near Panchadeep Sangha) under
Urgent Maintenance of Road from NH-208 to Rupaichari PWD Office(L-2.80Km) in between Ch.0.000 km to Ch.2.80km during the year 2025-26/ SH - Patch metalling, Patch Carpeting and Sand seal coat on old bituminous surface etc.
Mtc. of road from NH-44 (Old) to Srinibashpara (L-1.15 Km) during the year 2023-24/ SH -Patch metalling, grouting, re-carpeting, seal coating, clearing of land slide, restoration of damaged road formation, bamboo palasiding, constn. of unlined sur
Construction of road side pucca drain in different stretches for the road from NH-08 (Guramara Bridge) to Kali Nagar via Durga Nagar (PMGSY) road under the jurisdiction of Khayerpur Sub-Division, PWD(R and B) during the year 2025-26
Urgent flood damage repair of road from NH-8 to Haduklau Bru settlement camp (L-3.80Km) /SH-WBM-3, Grouting,Re-Carpeting , seal coat , protection wall,road side drain and providing CC block appron etc from chainage 0.00Km to 3.80 Km .
DWS Schms/SH- Utility shiftng, mtc Rising, delivery pline, chnges 250 mm CI rising line to 250 mm DI pline, shiftng delivery along the NH-08 frm Bhrammabari to Netaji Subhash Bridge undr DWS SD-I, UDP Gomati durng 2025-26.
Construction of road from NH-8 Bye-pass - Surjyamaninagar 400 KV Sub-Station road to Ranirkhamar-Pritilata road Nandalal Colon via Tripura Santiniketan Medical College Length 1Point21 Km under Dukli Sub-Division PWD RandB during the year 2024-25 / S
Improvement of road from Karbook Nabojoy para road to NBCC road via CSS colony Hamonta Debbarma para and road from NH-208 (Patichari Yatri Shed) to Madhu Krishna para under RIDF XXIX of NABARD (Job No.TP/COM/212/2023-24).
Mtc. of Road from NH-08 (Guramara Bridge) to Kali Nagar via Durga Nagar (PMGSY) SH Construction of one Box Culvert (4.00 Mtr x 4.00 Mtr) along with demarcation of the road by providing RCC Pillar during the year 2025-26.
Urgent Mtc Of road from NH 08 Pecharthal Kanchanpur to Machamara Road length 8 50 KM during the year 2023 24 under the jurisdiction of PWD RandB Pecharthal Sub Division SH Surface drain Patch soling Pot holes repair Patch Carp
FDR/Urgent mtc. of road from Agartala-Simna road(Tillabari) to NH 108B via Mohanpur Market during the year 2024-25/SH Construction of RCC Drain(L-270.00mtr) with allied works from Chatrabrinda Club to Border fencing near River Sonai.
Periodical Renewal of the road NH 08 to Sidongcherra SB School L 0 point55 Km and 2 road near Buddha Mandir L 230 mtr during the year 2022 23 SH Soling Patch metalling grouting carpeting and sand seal coat etc