Loading…
Loading…
906 results • Best match
Periodical Repair of road from NH 208 to Juricherra Panchayat L 0 80 km during the year 2025 26 under the jurisdiction of Ganganagar PWD R and B Sub Division SH Stripping Pucca Drain Pot hole Repair WBM Prime coat Tack Coat Carpeting and Se
FDR Mtc of road from Binapani (NH-08) to Binapani HS School under PWD (R and B) Jirania Sub Division during the year 2024-2025 SH Palasiding, placing of gunny bags, earth filling, patch metalling, re-carpeting etc. (Ch. 0.00 to 0.90 Km..Group -II
Improvement of road from NH 08 to Godown Para L 0 point 38 km from Ch0 km to 0 point 38 km under PWD R and B Pencharthal Sub Division during the year 2022 23 SH WBM Carpeting Seal Coat RCC retaining wall GrI
FDR/ Urgent maintenance Road from NH-108 B to Nutan Matia Para, (L- 6.41 km ) under during the year 2024-25/ SH WBM-2, WBM-3, Carpeting, Pucca drain, Retaining wall, unlined surface drains etc. complete. Ch 0.0 Km to 4.95 Km./GR-II.
PR of road from NH 208 to Radhanagar Panchyat office via New Rajnagar SB School during the year 2025 26 SH Stripping Gunny bags filling Patch repairing Soling Surface Drain Carpeting and Seal coat etc from Ch 0 00 Km to 0 850 Km
OR N Work of NH-08 at Ch 295point70 Km to Ch 308point00 Km in the state of Tripura during the year 2021 22 SH Maintenance of road by providing WBM prime coat tack coat DBM BC Hard shoulder etc Inc RCC lined drain
Strengthening of road from KF road to NH 208 via Fultali L-3.785 road from Longlir par embankment to Lari Sing House road via Nani Singh House L-0.615 km sanctioned under Scheme for Special Assistance to States for Capital Expenditure for 23-24
Up-gradation of road from (1) MRI.09-Jamjuri Gangacherra Rd to NH-08via Baskhet JB Schl. (2) MRI-01 Dhuptli Tulamura Rd to Gangacherra Bazar/SH- Utility Shiftng of DI/CI/PVC pipelne along with PMGSY road within DWS SD KBN durng 2025-26.
OR of NH-8 in between the Ch. 385.80 Km to Ch. 398.55 Km during the year 2019-20. SH Construction of RCC Retaining walls at Ch. 385.80 Km, 386.60 Km and 398.55 Km, landslide clearance, Hill side drain clearance, Stripping and filling . 3rd call
Urgent Repair of road from NH 208 to Fatikroy Kailashahar road via Radhanagar Panchyat office Tarapur L 3 40 km during the year 2025 26 SH 03 three nos Box culvert at ch 2 00 km Ch 2 20 km 2 50 km Soling
FDR/ Urgent maintenance Road from NH-108 B to Nutan Matia Para, (L- 6.41 km ) under during the year 2024-25/ SH WBM-2, WBM-3, Carpeting, Pucca drain, Retaining wall, unlined surface drains etc. complete. Ch 0.0 Km to 4.95 Km./GR-I
Mtc of road from Kumarghat RCC Bridge to Tarun Saha huose via Shibtali and NH 08 at 82mile to kanchanbari RCC Bridge via 60 ghar para Length 1200 mtr plus 3600 mtr during the year 2021 22 SH Patch WBM carpeting and seal coat etc
Mtc. of the road from i. SDM Office to Kanchanpur Tri-junction to NH-44A via Hospital, ii. Hospital Road, Library Side iii. S.D.M. office to Daspara via DFO Office under Dasda Sub-Division during the year 2022-23. SH WBM, Carpeting, Seal Coat, Surf
Mtc of road from Bank math near 33 Kv Sub-station to NH 108 B via Nabin palli under West Tripura district during the year 2022 2023 SH Patch soling, metalling, Carpetting etc., Portion from Ch. 0.70 km to ch 1.50 km Gr II
Mtc of road from Bank math near 33 Kv Sub-station to NH 108 B via Nabin palli under West Tripura district during the year 2022 2023 SH Patch soling, metalling, Carpetting etc., Portion from Ch. 0.00 km to ch 0.70 km Gr I
Maintenance and development of Agartala town road during the year 2025-26 SH Repair of road by providing Paver Block, GSB etc inc mte of road side drain etc at road from NH near Palki Marriage Hall to Ashirbad Gas agency L 325.00 Mtr
FDR Maintenance of road from NH-08 Sarada Ashram to Kalinagar (L 1.00 Km) under the jurisdiction of PWD (R and B) Khayerpur Sub-Division during the year 2024-25 SH Metalling, Carpeting, Brick Line Pucca Drain and other allied works. Gr I (One).
Urgent mtc of road from U-A Road to Gomati PTI via Kalpataru Ashram, NH 8 to Matabari - Brahma Cherra Road, Banduar Power house to U-A road, Fulkumari Chowmohani to Old Tripureswari School under the Jurisdiction of Sub - Division -I within Matabari B
Mtc of road Startng from NH 08 to D D Stadium, Kabiraj Tilla within the AMC Ward no 44 during the year 2022 23 Development of both end of Echa bazar Level crossing SH Earth filling and providing soling, metalling, Carpetting, grouting, paver bloc
Mtc of road Starting from Central Road Extension Ambedkar Jn to ho Sabitree Mallik towards NH 08 and adjacent roads L 0.75 Km within the AMC Ward no 51, under juridiction of Central VI SubDivision, during the year 2022 23 SH Patch soling, metalling,
Improvement of link road from NH 44 Ratan Rakshit house to Sri Dayal Datta house at Reshambagan Ward No.09 during the year 2020 21 SH Metalling, Carpeting, Construction of drain, CD structure and protection work Length 0.150Km Job No.TP COM 21 2021 2
Utility shifting of drinking water supply pipeline at Jamarai Para IWP M Well at Natunpara schemes and other allied works etc under DWS Sub Division Kanchanpur NH 44 to Jamarai para Dist North Tripura Package NO TR0307 P4 during the year 2026 27 GR I
Utility shifting of drinking water supply pipeline at Jamarai Para IWP M Well at Natunpara schemes and other allied works etc under DWS Sub-Division Kanchanpur NH 44 to Jamarai para Dist North Tripura Package NO TR0307 P4 during the year 2026 27GR II
Development of road from NH 08 to Manu river via Saradapally in c allied road at Kumarghat M C T Length 1100 00 mtr under Scheme for Special Assistance to States for Capital investment for 2026 27 SH Paver Block Patch GSB WBM Carpeting Seal
Development of road from NH 08 to Manu river via Saradapally in c allied road at Kumarghat M C T Length 1100 00 mtr under Scheme for Special Assistance to States for Capital Investment for 2026 27 SH Paver Block Patch GSB WBM Carpeting Seal
Construction of RCC covered drain on left side of NH 08 from Ch.49.20 km near Subhash Setu, Chanban to ch.52.20 km near Brahmabari Chowmuhani Udaipur including 02 nos. CD structure to drain out the storm water of low lying areas under Udaipur Munici
Please refer DNIT 101 CE
SH- Mtc. of brick walls, floor and roof etc. including sanitary fittings (Group-II).
WBM Gr-3, Metalling, Carpeting and Seal Coat etc. during the year 2022-23
WBM- 3, Carpeting, Recarpeting, Repairs of potholes, seal coat etc.
Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2023-24
BB road via Santirbazar Motor Stand, Mahamuni, Kalacherra (L-4.875) under RIDF XXVIII of NABARD.
FDR Mtc of different roads like Manu Bazar to kalibazar via fulchari portion from Ch.0.00 km to Ch 3.00 Km Kalacherra NH-8 to Ganganchandra Para via Sona Mohan para portion from Ch 0.400 Km to ch.4.50 Km and Satchand to Bankul via Sindhuk Pathar
Maintenance of PWD road from i Babul Chowmuhani -Fultali Road to Haripur Dead End via Dr Abhijits house L- 0 point 90km) and ii Approach of Azachok Ashram Road with NH-08 L- 0 point 50km under Amtali PWD RandB Sub-Division during the year 2024-25 /
Const of 2Two Nos Box Culvert Size 2.00 2.00 M i One at the approach of Western side Gate of Unakoti Dist Hospital ii another one at the approach road of NH 208A including pucca drain near Unakoti District Hospital, KLS during the year 2024 25
Development of Agartala town road during the year 2025-26.within the juridiction of AMC Ward no 09, i Ichamua main road to kajol Mazumdar house, ii NH 08 to Das para road kashipur, SH Repair of road By providing Grouting, WBM 3 and Patch carpeting e
Mtc of Road from NH 08 (Mohanpur East to Harijoy chowdhury para road) under Jirania Sub Division PWD (R and B) during the year 2023 24 (L 1.45 Km) SH Grouting, metalling, Re carpetting, seal coat etc.(L 1.10km, from Ch.0.00 mtr to ch.1100.00mtr)
Improvement of road from NH 08 to AndharcherraPanchayet office via Andharcherra Health Sub Centre Total length 0 point 75 km from Ch 0 point 45 km to 0 point 75km under PWD R and B Pencharthal Sub Division during the year 2022 23 SH GSB WBM Carpetin
Maintenance of road from NH 08 to Kamlapur village L 2 point 09 km from Ch 0 point 60 km to 2 point 00km under PWD R and B Pencharthal Sub Division during the year 2022 23 SH Pots holes repairs Carpeting Seal Coat etc Gr II
Mtc. of Road from NH-208(Harina-Ailmara) road to Thakhirai Para in between Ch.0.00km to Ch.0.480km during the year 2024-25/ SH - GSB (Ch.0.00 km to Ch.0.150km), WBM-III, Carpeting, Sand seal coat and Placing of CC Blocks etc. (3rd Call)
Periodical Repair of road from NH 08 to Kalamjoy para via Sonarampara community Hall L 3 50 Km from Ch 0 00 Km to Ch 0 400 KM under PWD RandB Pecharthal Sub Division during the year 2024 25 SH Patch soling WBM 3 Carpeting Seal Coat
Mtc of road from Tulabagan petrol pump (NH 108 old) to Bazar Tila road during the year 2024-25/SH Earth filling, patch soling, WBM, carpeting, pallasiding, etc(L-0.15km) in/c one slab culvert of size (1.00x1.00m) with wing walls and pucca drain(L-90m
Periodical Repair of i Kumarghat Municipal Council office road and office area Length 200 point 00 mtr and 200 point 00 mtr equals 400 point 00 mtr and ii NH 08 to Manashi Hall L 350 point 00 mtr during the year 2023 24 SH Patch WBM
5. Maintenance of PWD road from NH-08 to Diptanu Sarkar house L- 112 Mtr opp to Amtali HS School under Amtali PWD RandB Sub-Division during the year 2024 - 25 / SH Patch soling WBM carpeting premix seal coat paver block RCC drain with other necessary
Mtc. of road Starting from Jogendra Nagar Rail Station LPG Gas Godown to Lay bay at NH 08 and adjacent roads L 0.900 Km within the AMC Ward no 51 , under jurisdiction of Central VI Sub Division, during the year 2023 24 SH Patch soling, metalling, gro
Mtc. of road Starting from Jogendranagar Rail Station LPG Gas Godown to Lay bay at NH 08 and adjacent roads L 1.00 Km within the AMC Ward no 51, under jurisdiction of Central VI Sub Division, during the year 2023 24 SH Patch soling, metalling, grouti
Mtc of road Starting from Jogendra Nagar Rail Station LPG Gas Godown toward NH 08 via Modern High School and adjacent roads L 0.60 Km within the AMC Ward no 51, under juridiction of Central VI Sub Division, during the year 2022 23 SH Patch soling,
Metalling,paver block,carpeting,seal coat etc.
Construction of Hume Pipe Culvert at Jalai on Kailasahar- Kumarghat road NH-208
Patch WBM, Grouting, Re-carpeting and seal coating etc.