Loading…
Loading…
906 results • Best match
SH- Re-carpeting, grouting etc.
WBM-3, Carpeting and Re-carpeting, Repairs of potholes, seal coat etc.
Patch WBM Grouting Re-carpeting and seal coating etc. Gr.I.
Carpeting, metaling, grouting, seal Coat etc. for the portion from Ch.2.47 Km to Ch.3.79 Km.
Patch WBM Grouting Re-carpeting and seal coating etc. Gr.II.
Restoration Repair in the selected stretches of NH 08 from Agartala to Udaipur Km 6800 to Km 55000 Total Length 48200 Km Estimate for providing Strip Seal Expansion Joint at bridge located at Km 9465 Design Chainage on NH-08
Maintenance of road from NH 08 to Panisagar BSF camp road via Seba Chandra para under PWD R and B Pencharthal Sub Division during the year 2022 23 SH WBM Carpeting Seal coat etc at Ch From 0 point 30 Km to 0 point 466 Km and 0 point 507 Km to 3 po
Maintenance of PWD road from NH_08 towards Rose Valley Park (L_0point90 Km) and Rose Valley road to Bholagiri road (L_0point80 Km) under AmtaliPWD(RnB) Sub_Div during 2025_26_SH_Construction of RCCdrain, mtc of shoulder etc and other necessary works
Flood Damaged Repair of NH8 in between the CH.343.00Km to Ch.349.00Km during the year 2018-19 SH Protection work, WBM, Potholes repair, carpeting, with seal coat, clearing of land slip, kutcha drain, maintenance of earthen shoulder etc.
WBM-III PMC Seal coat road side pucca drain during the year 2024-25
SH. Construction of road side RCC draim (L- 150.00 Mtr)
SH- Repairs to road by metalling, carpeting, flat brick soling, road side drain etc. portion from Ch. 0.00 k.m to 0.450 k.m.
SH- Grouting ,patch carpeting, Seal coat, jungle cutting, unlined drains, gunny bags etc.
SH- Construction of Pucca side Drain during the year 2019-20
Bituminous concrete, metalling, GSB, laying of paver and construction of RCC road side cover drain including road markings and sign boards during the year 2025-26. (Under RIDF-XXXI of NABARD).
SH- WBM-III, repairs of potholes, Carpeting, Re-carpeting, Seal coat, Pucca Drain etc. during the year 2025-26.
SH-WBM-III, Repairs of potholes, Carpeting ,Re-carpeting etc.
WBM Gr-3, Metalling, Carpeting, Tack Coat, Seal coat etc. during the year 2022-23.
Patch Metalling, Grouting, PMC and road side drain etc.
WBM- 3, Carpeting and Recarpeting, Repairs of potholes, seal coat etc.
SH- Removal of land slide, protection work, patch soling, earth filling, gunny bag placing etc. (2nd call)
SH- Repairs to road by metalling, carpeting, flat brick soling, road side drain etc. portion from Ch. 0.080 k.m to 0.800 k.m.
SH- Removal of land slide, protection work, patch soling, earth filling, gunny bag placing etc (2nd Call)
Protection work, Soulder restoration work, Land slide Clearence and Road side drain etc.
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2024-25.
SH- Flat Brick soling partial, WBM, Carpeting, Seal coat etc
Patch matalling, Grouting, re-carpetting, Seal coat etc.
SH- R.C.C. Retaining Wall , C.C. Blocks, Construction of Embankment, Filter media, Flat Brick soling, WBM-III, Paver Block etc.
SH- WBM-3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2025-26.(Portion from Ch.3.50 km to Ch. 4.580 km) (Gr.- I).
SH-WBM-III, Repairs to road by Potholes repair, Re-carpeting etc. during the year 2025-26.
SH- Removal of landslide, Protection work, patch soling, earth filling, gunny bag placing etc
SH- WBM-3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2025-26.
Refer DNIT93
SH- Removal of landslide, Protection work, patch soling, earth filling, gunny bag placing etc.
GSB, WBM-III, Paver block, etc
SH- Metalling, Carpeting, Grouting, Drain etc. during the year 2022-23.
Metalling, carpeting and seal coat etc. during the year 2024-2025. (Portion from ch. 0.00 km to 0.572 km). Gr- I
SH- WBM-3, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2025-26.(Portion from Ch.4.580 km to Ch. 5.720 km) (Gr.- II)
Carpeting, metaling, grouting, seal Coat, Brick work etc.
WBM-II , III, Tack Coat, Bituminous Concrete etc. during the year 2026-27
SH- Repairs of potholes ,WBM -3 ,Carpeting, Recarpeting, seal coat, sand seal coat and protection works etc.
SELECTION OF CONSULTANTs/ NGOs TO ASSIST IN IMPLEMENTATION OF RESETTLEMENT ACTION PLAN FOR KHOWAI TO HARINA SECTION OF NH-208
GSB WBM PMC etc (L 0.290KM)
Patch WBM, Grouting, carpeting, Seal coat etc.
SH- Grouting, widening and laying of BC, drainage work including road furniture.
SH- Missing soling, Repairs of potholes, unlined surface drain, Gunny Bag etc during the year 2024-25.
SH- Missing soling, Repairs of potholes, unlined surface drain, Gunny Bag etc during the year 2024-25
Earth works, GSB, WBM-III, Prime Coat, Tack Coat, Carpeting, Seal Coat etc. during the year 2024-25.
SH- WBM- III, Repairs of potholes ,Carpeting , Re-carpeting, seal coat, Paver Block and Road Side Drain etc.