Loading…
Loading…
906 results • Best match
SH- Repairs to road by Re-carpeting, Grouting, old sand seal coat , road side drain etc. portion from Ch. 0.30 k.m to 0.70 k.m and Ch. 1.10 k.m to 2.10 k.m. during the year 2022-23.
S.H Patch Metalling, Re-carpeting, seal coat, drain works, etc during the year of 2021 2022
Construction of 1(one) no RCC Box Culvert at Ch-0.16 Km
SH- construction of retaining wall, laying of CC block, soling, WBM-III, Carpeting etc. ch 0.94 km to 1.00 Km.
SH- WBM-III, Re-carpeting, Seal coat , Sand Seal coat etc.
SH- Road side brick masonary drain.
WBM-III, Patch Grouting, Seal Coat, Patch Carpeting etc
SH Widening by GSB WBM II and III carpetting and laying of paver blocks during the year 2019 20
Construction of Box Culvert, Wing Wall etc.
WBM-2, WBM-3, tack coat ,PMC, seal coat, roadside pucca drain etc.
SH- Formation, WBM-3, Paver Block, Protection work and road side pucca Drain etc. During the year 2021-22.
SH-Metaling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2025-26.
SH-Grouting, patch metalling, patch carpeting etc. (2nd call)
WBM,PMC etc.(L-0.72 km)
SH - WBM-III, carpeting and seal coat etc. during the year 2024-25
B.B road (Near power house) road to Hospital road (L-0.30 Km) /SH- Flat Brick Soling, Brick Edging, WBM-III, Carpeting, CD Culverts, Paver Block, Road Markings, and Roadside Drainage etc.
PMGSY Road works
Patch, metalling, Grouting, carpeting etc. on Bagbassa to Zaithang School road, Thangnang to NH-08 via Noagang Community Hall and Tingaria road
Patch WBM, Patch carpeting grouting and side berm lowering etc. on Bagbassa English Medium School road and NH-08 to Zaithang School.
(Length 0.160 Km.) during the year 2021 2022 S.H GSB, metalling, carpetting, Seal coat, etc
WBM3, Paver Block, Patch repairing, RSD etc.
SH- WBM III,Carpeting, Recarpeting ,seal coat, Pucca drain.
GSB, WBM-3,carpeting,traffic sign CD, brick masonry Drain, toe wall etc
102/BLG-MC/eDNIT/2020-21
Recarpeting, Grouting ,surface drain, land slide clearing etc.
Repairing of pot holes Re carpeting surface drain etc
Jolaibari-Kowaifung road to Gandifa Reang via Nath para (L-1.35 Km) and Kalashi Bazar to Patichari via Lichubagan (L-1.75 Km) under RIDF-XXIX of NABARD. (Job No.TP/COM/205/2023-24)(2nd Call).
SH- PUCCA DRAIN works, protection works , WBM-III, Carpeting, Re- Carpeting works etc.
103/BLG-MC/eDNIT/2020-21
flat Brick soling, WBM-3, paver block etc during the year 2024-25.
SH-WBM-III, Carpeting and Re-carpeting, Repairs of potholes, Seal Coat etc.
Patch WBM, Grouting, Re-carpeting , seal coating, protection work and road side pucca drain etc
Improvement of road from NH-08 Muhuripur road to Charanpai Reang para via Mihir Reang house and Swapan Reang house(L-1.310 k.m)
PMGSy road works
Renewal layer of 30mm BC of NH-208 from Km 140.500 (Ompi Chowmuhani Road) to Km 150.000 (7th Mile) in the State of Tripura
SH- WBM, PMC, CD, and Pucca drain etc. (Chainage from 9.987 km to 10.720 km).
SH- Repairs to road by Const. of Sub grade , WBM-3, carpeting, flat brick soling, etc.
SH- Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal oat, Surface drain etc. during the year 2024-25
WBM-III, repairs of potholes ,carpeting , seal coat etc. during the year 2024-25.
SH-Widening, WBM, Carpeting, Re-Carpeting and side Drain etc. ch (0.00 to 0.750K.M -L 0.75 K.M) Gr-I.
SH- Patch metaling, patch Carpetting, seal coat etc. (3rd Call)
Grouting,Recarpeting etc.
SH- Repairs to road by metalling, carpeting, flat brick soling, road side drain etc. portion from Ch. 0.00 k.m to 0.510 k.m.
Formation, widening, Widening by soling, missing soling, Protection by CC blocks, WBM-II, WBM-III, Carpetting, Sealcoat, Protection work, Drain, 5 Nos Box cell
GSB, WBM and PMC etc.
SH- WBM, PMC, CD, and Pucca drain etc. (Chainage from 9.037 km to 9.887 km)
Patch soling, patch WBM carpeting including palasiding work kutcha drain placing polythene bags etc.
Patch Metalling, PMC, sand seal coat, road marking etc
PMGSY road works
PMGSY road works