Loading…
Loading…
906 results • Best match
Mtc of road 1 Sabroom Baishnabpur road starting from sabroom NH 8 upto Ch 3.00Km. during the year 2020 21 SH Patch metalling Re carpetting Sand Seal coat etc
Strengthening and improvement of riding quality of road from Baijalbari NH 108B Sub Zonal Development Office to Satsangah Ashram Ampura under Khowai Tripura L 4.20 Km under CRIF Scheme
Maintenance of different road from Lichubagan to Lembucherra and Fatikcherra to Rangacherra(Old NH 108B) during the year 2025-26/SH Patch Grouting, Carpeting, seal coat etc.(L-16.00km)
Mtc of Road from NH-08 (ICA Office) to house of Sri Swapan Das during the year 2024-25 SH Laying of inter locking paver blocks and allied works.
FDR of road from Rajmohan Choudhurypara to NH 208 during the year 2024-25 L 0.80 km SH patch soling, patch metalling, grouting, re-carpeting, sand seal coat, etc.
Mtc. of a road from NH 108B to Mission(L-890.00Mtr)/SH Patch soling, WBM-3, side berm, carpeting, seal coat etc.(Group-I/CH.0.00 to 445.00 Mtr)
FDR of road from NH 08 to Debacherra L 0 500 km Back filling at location 0 035 km during the year 2024 25 SH Filter media Earth Filling
Mtc of road from NH 08 to Leprosy Centre Length 2 point 00 Km during the year 2021 22 SH Patch metalling Patch Carpeting Grouting Sand seal coat etc
Flood Damage Repair FDR of NH 08 44 started at Ch.414.30 Km and 419.60 Km during the year 2019 20 SH Construction of retaining wall including protection work
Construction of Black top road from Belonia - Jolaibari NH to Sarath Uchai para PWD road via Dilip Das land under Ratanpur VC under Santirbazar Division during FY 2025-26
Maintenance of road from NH-8 at Dalubari Bazar to Kekmacherra rail Bridge (L-2.50 Km)/ SH- Patch repairing, carpeting of patches, drain etc during the year 2020-21
Mtc. of Road from Gopi Chowmuhani to Nalchar Border on Bagma-Nalchar road ( L 0.850 km) and Construction of C.C. Toe wall at Ch. 1.10 km From NH-8
Mtc. of road from Sakbari (NH-8 road) to Colony Para (L-0.550km) under Satchand RD block SH - Metalling, carpeting including Construction of CD and unlined surface drain etc
FDR Mtc. of Agartala town road Khayerpur Bijoysangha to NH 08 via Biswajit nama House during the year 2024 25 SH Grouting, Re carpeting and Road side pucca drain
Immediate Repair and Maintenance of Kailashahar Kurti Bridge Road NH 208A Between Km 41 and Km 45 in the state of Tripura on percentage rate and work order basis
Maintenance of Road from Suresh Debnath land to NH 108B (New) at Dakaiya palli during the year 2025-26 / SH WBM-III, Carpeting ,seal coat etc.(L-0.50 KM)
Construction of RCC Drain in place of affected C.C Drain on various stretches of NH 08 from Ch.397.50 Km to Ch. 406.00 Km during laying of gas pipeline
Mtc of road from Pecharthal near NH 08 to Bidharshan Bhabana Manddhir via Shilcherra old NEC road during the year 2024 2025 SH RCC and CC drain etc Gr 2
STRENGTHENING OF ROAD FROM CHAMPAKNAGAR MARKET (NH-08) TO PADMAMOHANPARA UNDER JIRANIA R.D BLOCK, WEST TRIPURA DURING THE YEAR 2024-25 (CH 1.00 KM TO CH 2.00 KM ,LENGTH 1.00KM).
FDR of road from NH 08 to ptl PHC via ptl TK road length 100km during the year 2024 25 SH Patch Metalling Patch Carpeting Seal coat Toe wall etc
Mtc. of Office Building of Jirania Division and Sub-Division office PWD(R and B) during the year 2024-25 SH Re Construction of boundary wall adjacent to NH 08
Mtc Of road from NH 208 to Mahim Chowdhury para JB school chainage from 0.65 Km to 1.55 Km during the year 2019 20 SH Carpeting, Pucca Drain, Stripping etc
Mtc of road from Pecharthal near NH 08 to Bidharshan Bhabana Manddhir via Shilcherra old NEC road during the year 2024 2025 SH RCC and CC drain etc Gr 1
Maintenance of road from New NH 108B(at Chandrakhona) to Cinema Hall Dighalia Road during the year 2025-26/SH WBM-III, Carpeting, Brick soling, earth filling etc.(L-275.00Mtr)
Mtc. Of road from K.F. Road to NH 208 via Fultali during the year 2021 22 SH Patch soling, patch metalling, grouting, carpeting, seal coating, kutcha drain, shoulder repair, etc.
Strengthening of road starting from NH-08 to SP Office Dhalai covering District Head Quater Complex during the year 2024-2025/ SH- Bituminous Concrete, seal coating, Road marking, road furniture.
Construction of Garage for car parking along with paver block in guest house complex and paver block approach near NH 108B at College of Agriculture, Lembucherra, West Tripura. Part 2
Periodical Repair of the road Road from NH 208 road near Rajmohan Das house to Industry Road during the year 2024 25 SH Patch WBM Patch grouting and Carpeting etc
Mtc. of Sing Tilla road from NH-8 (Near Petrol pump) to Debasish Majumder house (L-0.250 Km). SH. Patch Mattaling, Carpatting, Seal Coat etc. during the year 2022-23
Mtc. of road from Ichabazar Dukli road near Ho Prabir Deb to NH-08 Bypass L 225.00 mtr for the year 2024-25 SH Patch soling, metalling, paver block etc
Periodical Repair of the road from NH 208 at Sonaimuri to Halambasti Total Length 1050 00 mtr during the year 2025 26 SH Patch Soling Patch metalling Grouting Carpeting etc
Mtc. of a road from NH 108B to Mission(L-890.00Mtr)/SH Patch soling, WBM-3, side berm, carpeting, seal coat etc.(Group-II/CH. 445.00 Mtr to 890.00 Mtr)
Strengthening and Improvement of riding quality of road from NH-08 Aloycherra to Rajapura via Maukshya Para, Jamatia Para, Lalmirah Length 7.50 Km under South Tripura District under CRIF Scheme
Construction of road from NH 08 Peratia to Garjee-Tulamura Road near Kalaban Market via Holakhet High School, Joalikhamar GP and Simsima Bazar Length 9.00 km under Gomati District, Tripura
Strengthening and Improvement of road from Amarpur Santirbazar Road near Kurma to Chellagang Mukh NH-208 via Chellagang Bazar Length 17.90 km under Gomati District, Tripura, Under Special Assistance Scheme
Construction of road from NH-08 to Labra Sardar Para to Harinama Para Swadesh Nagar GP under Jolaibari Assembly Constituency (Length- 2.50 Km)SH- GSB, WBM, Carpeting and allied works under Scheme for Special Assistance to States for Capital Investmen
Mtc of road from NH 08 road to Gopal Roys house via Chana Saha house L 400 00 mtr during the year 2024 25 SH Formation work CD and Soling etc
Maintenance of the Approach Road of Rabindraath Thakur Mahavidyalaya from NH-08 during the year 2023-24 SH Embankment construction Bituminous and Non-Bituminous Work Protection Wall and other allied items
FDR/Maintenance of KMA road starting from NH-8 near Ambassa townhall to Ambassa Railway crossing (Length-0.82 Km)/SH - Grouting, Bituminous concrete, placing interlocking paver block and road marking etc.
Strengthening of road from NH-8 to Kamalacharra from Ch.0.00 Km to Ch.1.50 Km (L-1.50km)/GSB, WBM-II, WBM-III, Carpeting Road side drain, protection wall, CD etc.
Maintainance of PWD Road from NH to Chachu Bazaar( L-3.75Km) during the year 2024-25/ SH WBM-3, Carpeting,etc. complete Ch. From 3.75 Km to 7.5 Km. GR-II
Mtc of PWD road from K F Road to NH 208 via Ghosh Para during the year 2021 22 SH. Construction of road side pucca drain near proposed old age home
PR of road from NH 08 (Dab Bazar) to Potachara JB School via Muslim Para (Length 0.80 km) under Matabari block, Gomati, Tripura/S.H GSB, WBM, Carpetting, Boxcell and allied works
Maintainance of PWD Road from NH To Chachu Bazaar (L-3.75Km) during the year 2024-25/ SH WBM-3, Carpeting, etc. complete Ch. From 0.00 Km to 3.75 Km. GR-I
Periodical repair of the road from NH 08 to NH08 via Ramtakur Mandir Total length 1300 mtr during the year 2024 25 SH Patch WBM Patch grouting Carpeting etc 2nd call
FDR / Maintenance Of road from NH-08 to Uttam Palit house under PWD (R and B) Sabroom Division during the year 2024-25/ SH -Road Side Protection by Providing wire crates.
FDR/Mtc. of road from NH-8(Garjantali) to Giridhari ashram via Harinarayan pur (L- 1.600 Km.) during the year 2024-25 / S.H- Road side protection, Patch metalling, Patch carpetting etc
Ordinary repair of NH-208A from Kailashar to Kadmtala 0 km to 41 Km in the State of Tripura in the year of 2020 21 on percentage and work order basis
Mtc of road from Pecharthal near NH 08 to Bidharshan Bhabana Manddhir via Shilcherra old NEC road during the year 2024 2025 SH Rcc boxcell 2mx2m Rcc and Cc drain etc
Strengthening of road from Krishnatali (NH-08) to Harijoy via Brajanagar and Brajanagar PWD road (Bankumari) to Gopal Chowmuhani via Uttar Majlishpur G.P Office under Jirania R.D Block. (L 5.575 KM).