SHIFTING OF 11 KV LINE AND TRANSFORMER IN FULL DEPOSIT IN TRANSPORT NAGAR YOJNA UNDER EDD-5 BULANDSHAHR.
SHIFFTING OF 11 KV LINE OF KUREJI TO HATHAURI UNDER DEPOSIT HEAD 2023-24 UNDER EDD II BALLIA
The Work for Laying of 11 KV line 3X185 sqmm XLPE Cable for replacement of damage single cable
Work of Strengthening of 11 KV line under Business Plan Year 2026-27 of EE, EDD- Baraipur, Varanasi.
11 KV NEW LINE AND OLD 11 KV LINE STRENTHINING WORK AND RMU INSTALLTION WORK UNDER EDC FARRUKHABAD
11 KV LINE MANTINECE OF BUDHANA SUB DIVISION 1 AND 2 DUE TO HEAVY STROME UNDER EDD BUDHANA
11 KV LINE MANTINECE OF BUDHANA SUB DIVISION 1 AND 2 DUE TO HEAVY STROME UNDER EDD BUDHANA
Construction of 11 kV Line Emanating from Proposed 33/11 kv S/S Sampurnanand Jail Alambagh Lesa Lucknow
Shifting of 11 Kv and LT Line Passing over the New Proposed Road between Choudhary Charan Singh Airport to Shahid Path
LT LINE WORK IN EUDD FARRUKHABAD
11 KV AND LT LINE WORK
LT Line wor and Capacity Icreasing
REPAIRING AND MAINTENANCE OF LT LINE
REPLACEMENT OF LT LINE BEAR ABC
Strengthening work of 33 KV Line Emanating from 132/33 KV Kankar Khera Sub-Station to 33/11 KV Sadar Sub-Station , 132/33 KV Lohiya Nagar Sub-Station to 33/11 KV Jagirti Vihar Sub-Station
01 WORK IN HEAD CONSTRUCTION OR REPLACEMENT OF DAMAGED 33 KV LINE AT DPR Sl No 4 UNDER EUDD 7 NOIDA
Providing 33 KV Line for 33/11 KV 1X10 MVA Sub station under Atal Industrial Infrastructure Mission at IA Babrala (Sambhal)
construction of 33 KV line and other miscellaneous works of 33 KV under EDD-II, Mau in Business Plan 2024-25
Construction of new 33 kv line from 220 kvS/SFaridpur to tapping point of 33/11 KVS/SKuwatanda in district Bareilly.
Work No 02 Govind Vihar avasiya yojna me 2x5 MVA 33/11 KV substation avam 33 KV line ka nirman karya
For the work of 33 KV Line Shifting issued from S/s Sainya in Full Deposit Scheme under EDD Kheragarh Agra
WORK FOR CUTTING OF TREE AND BUSHES AT 132 KV TEWA TO DISTRICT COURT 33 KV LINE UNDER EDD MANJAHANPUR KAUSHAMBI
PROPOSED OF VARIOUS 33 11 KV SUBSTATION 33 KV LINE GAURDING NEW L.A. AND REPLACEMENT OF BATTERY AND BATTERY CHARGER WORK
To Replace damage 33 KV Cable at 220 KV SubStation Candela and Near Canal Patri of 33 KV line Collectorate Shamli
Increasing capacity of 33/11kv S/S Izzatnagar rural and reconductoring of existing 33 kv line Izzatnagar rural in distt. Bareilly
CONSTRUCTION OF 33 KV LINE AND ASSOCIATED 33/11 KV SWITCHYARD FOR CRPF CAMPUS CHAKIA, DIST. CHANDAULI ON TURN KEY BASIS.
Construction of 33.00 KM long 33 KV line for 33/11 KV Substation Chhau, Azamgarh from 220 KV Substation Badgahan, Azamgarh
Construction of 33 KV line and other miscellaneous works of 33 KV under EDD-I, Mau in Business Plan 2024-25
Construction of 33 KV Line from 220/33 KV S/S Gola to 33/11 KV S/S Sikndrabad, Lakhimpur Kheri
02 WORK IN HEAD CONSTRUCTION OR REPLACEMENT OF DAMAGED 33 KV LINE AT DPR SlNo 2 5 UNDER EUDD 7 NOIDA
Annual Patrolling and Maintenance of 33 KV Line from 132 KV S/S Fatehabad to 765 KV S/S Fatehabad Agra
For Supply of A-4 Size Paper Rim and other stationery for the Office Use of EE 33 KV Line, Meerut.
01 WORK IN HEAD CONSTRUCTION OR REPLACEMENT OF DAMAGED 33 KV LINE AT DPR Sl No 11 UNDER EUDD 7 NOIDA
Construction of new 33 KV line from 220/33 KV S/S Mallawan Hardoi to 33/11 KV S/S Mallawan
33 Kv line shifting work due to road Widening Sidhauli chauraha to Kalli and Kalli to Naimshrayan under EDD-II, Sitapur
Construction of new 33 kv line to connect 33 kv mishrain and 33 kv abholi line from Bhatevara Nahar to Bhikhampur
CONSTRUCTION OF 33 KV LINE FOR DEWAL PUMP CANAL FROM 220 KV BHADAURA S/S DIST- GHAZIPUR ON SEMI TURNKEY BASIS
CUTTING AND CHOPPING OF TREES BRANCHES 11 KV AND 33 KV LINE INSTALLED 33 KV SUB STATIONS UNDER SDO II KITHORE
CUTTING AND CHOPPING OF TREES BRANCHES 11 KV AND 33 KV LINE INSTALLED 33 KV SUB STATIONS UNDER SDO III KHARKHODA
Laying of 33 kV line from 132/33 kV Sub station Hanuman Setu to 33/11 kV Sub station Hanuman Setu
Replacement of Damaged Jumpher, Pole etc. of 33 KV Line in the area of EDSD-2nd Baraut under EDD-2nd Baraut.
Replacement of Damaged Jumpher, Pole etc. of 33 KV Line in the area of EDSD-1st Baraut under EDD-1st Baraut.
Replacement of Damaged Jumpher, Pole etc. of 33 KV Line in the area of EDSD-3rd Baraut under EDD-1st Baraut.
Replacement of Damaged Jumpher, Pole etc. of 33 KV Line in the Area of EDSD-4th Baraut under EDD-2nd Baraut.
CONSTRUCTION OF 33 KV LINE FROM 132 KV S/S BAHJOI (UNDER CONSTRUCTION) TO 33/11 KV S/S ISLAMNAGAR, BUDAUN.
CONSTRUCTION OF NEW 33 KV LINE FROM 132/33 KV S/S USAWAN TO 33/11 KV S/S KALAN (SHAHJAHANPUR)
Maintenance of 33 KV line for 33 KV Bhadora and Barna line on PCC pole under juridiction of EDD-III, Fatehabad
Work of replacement of VCB and replacement of 11 KV line in under EDD-I Azamgarh EDD-I,II, III Azamgarh
LOSS REDUCTION WORK UNDER RDSS IN DISTRICT KUPWARA, KASHMIR
LOSS REDUCTION WORK UNDER RDSS IN DISTRICT BANDIPORA, KASHMIR