Loading…
Loading…
3,916 results • Best match
C.C. lining including earth work at Main Canal D1 from Chainage 13500 m to 14031.5 m (Surface Area 5554.175 sqm)of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22, Group No.25
C.C. lining including earth work at Main Canal D1 from Chainage 15930 m to 16410 m (Surface Area 4622.4 sqm)of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22 , Group No.30
Improvement and Renovation of GS Road from Ch. 6237.00m to Ch.11373.00 under SOPD (G) for the year 2020-21. (Phase-II) Group-I. (RETENDER)
Renovation of RCC manhole and bearing beam and replacement by steel cattle traps cage on Rajgarh link road from Rajgarh RCC Bridge to Anil Nagar.
APART/NOCP/WAREHOUSES/K-06 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex (Godown 1) at Amingaon in Kamrup District under APART.
APART/NOCP/WAREHOUSES/DNG-05 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex at Kharupetia (Godown 5) in Darrang District under APART.
APART/NOCP/WAREHOUSES/K-07 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex (Godown 2) at Amingaon in Kamrup District under APART.
Improvement of M. G. Road by repairing, renovation, painting and beautification from Bharalumukh to D.C Office (Metro) under SOPD (G) for the year 2021-22
APART/NOCP/WAREHOUSES/ DNG-04 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex at Kharupetia (Godown 4) in Darrang District under APART
Repairing and Renovation of the EE office building canal I Canal -I sub Division.,Maintenance and repairing of Sub-Divisional office, Canal-I _Irrigation Rowta
Redeveloping,renovation of pvc u/g distribution system and supply of pvc pipe and accessories, repairing of spout chamber, control room, lt panel, transformer etc.
APART/NOCP/WAREHOUSES/K-08 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex (Godown 3) at Amingaon in Kamrup District under APART.
Construction of Ground water reservoir with sand Filter including water supply connection to the existing RCC overhead tank, Bull Sheds, Renovation of existing dung pit etc.
APART/NOCP/WAREHOUSES/SIV-04 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex (Godown 5 and Godown 6) at Sivasagar District under APART.
Setting up of Infrastructure for Physical Interface (Renovation, Repair and Interior Works) of the Office of the Commissioner of Industries and Commerce, Bamunimaidam Guwahati-21, Assam
Renovation, repairing raising of boundary wall, Construction of storm water drain with landscaping works at GMC Hostel campus of Hospital No.1, 5 6 Guwahati-32
APART/NOCP/WAREHOUSES/SIV-01 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex (Godown 1 and Godown 7) at Sivasagar District under APART.
Civil work Electrical works Sanitary works and Septic tank
Civil Sanitary Water Supply and Electrical Work
Please refer tender notice
Renovation of village road with earth work and sand gravel from Maopar Baptist Church to Brahma Basti Tiniali, Chirang, BTC under AOP, BTC for the year 201617.
APART/NOCP/WAREHOUSES/ K-03 Renovation and Upgradation of Warehousing Facilities under the scheme of APART in existing Warehouse Complex at Maidamgaon (Plot-1) in Kamrup District.
APART/NOCP/WAREHOUSES/ DNG-03 Renovation and Up-gradation of Warehousing Facilities in existing Warehouse complex at Kharupetia (Godown 3 and 6) in Darrang District under APART
APART/NOCP/WAREHOUSES/ K-02 Renovation and Upgradation of Warehousing Facilities under the scheme of APART in existing Warehouse Complex at Maidamgaon (Plot-2) in Kamrup District.
AS PER NIT
Development Approach in Fisheries and Aquaculture through Cluster Based Initiatives under SOPD for the year 2025-26, Tinsukia 1) Construction of New Ponds 2) Renovation of Existing Ponds
SH Repair and Painting of Boundary Wall (Outside and Backside of Godown), Verandah Nosing Restoration, Shed Plastering and Whitewashing, Toilet Renovation, Gate Replacement, Parking Shed and Sitting Area
APART/NOCP/WAREHOUSES/KAR-01 Renovation and Upgradation of Warehousing Facilities under the scheme of APART in existing Warehouse Complex at Howraghat in Karbi Anglong District (Godown 1)
APART/NOCP/WAREHOUSES/KAR-02 Renovation and Upgradation of Warehousing Facilities under the scheme of APART in existing Warehouse Complex at Howraghat in Karbi Anglong District (Godown 2)
Improvement of Bharalumukh to D.C. Office (Metro) (40 Nos. Building) by repairing, renovation, painting and beautification from Ch. 0.00m to Ch. 1110.00m under SOPD-G for 2021-22
APART/NOCP/WAREHOUSES/K-05 Renovation and Upgradation of Warehousing Facilities under the scheme of APART in existing Warehouse Complex at Paschim Boragaon - Model in Kamrup (M) District.
C.C. lining including earth work at Branch Canal M9D1 from Chainage 0 m to 810 m (Surface Area 4408 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
Construction of Main Canal D1 from Chainage 24420.5 m to 27870 m of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M2D2 from Chainage 4440 m to 4980 m (Surface Area 1935.99 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M6D1 from Chainage 3900 m to 4686.579 m (Surface Area 1811.26 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
Construction of 6.00 m Slab Culvert( Two Numbers) at Chainage 19950.00 m,20798.00 m at D1 Canal and 10.00 m Slab Culvert( One Number) at Chainage 4530.00 m at D2 Canal for ERM, Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M6D1 from Chainage 600 m to 960 m (Surface Area 2429 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M7D1 from Chainage 0 m to 450 m (Surface Area 2437.6 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M2D1 from Chainage 720 m to 1050 m (Surface Area 2163.2 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M6D1 from Chainage 2550 m to 3000 m (Surface Area 3053.6 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Main Canal D2 from Chainage 23520 m to 23880 m (Surface Area 3135.6 sqm)of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M2D2 from Chainage 8940 m to 9420 m (Surface Area 1009.14 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M10D1 from Chainage 810 m to 1200 m (Surface Area 1983.6 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M2D2 from Chainage 6360 m to 7350 m (Surface Area 2104.15904255319 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Branch Canal M10D1 from Chainage 420 m to 810 m (Surface Area 1983.6 sqm) of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Main Canal D1 from Chainage 18570 m to 19020 m (Surface Area 4482 sqm)of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Main Canal D1 from Chainage 21360 m to 21570 m (Surface Area 1938.3 sqm)of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
Construction of Main Canal D2 from Chainage 27570 m to 29670 m of ERM, Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
C.C. lining including earth work at Main Canal D1 from Chainage 17730 m to 18150 m (Surface Area 4183.2 sqm)of ERM,Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22