Loading…
Loading…
5,613 results • Best match
REPAIR/ REPLACEMENT OF RETAINING WALL, DRAIN AND PATHWAYS AT BAKLOH CANTT UNDER AGE(I) DALHOUSIE CANTT
Construction of Retaining wall at Govt. Sen. Sec. School at Bhanog Tehsil Rajgarh Distt. Sirmour H.P.
Restoration of rain damages (SH Construction of damaged Retaining wall at Andhari) in ward No 5
C/o Retaining wall to Path near h/o Sh. Narinder Guleria in ward No. 2
Construction of retaining wall and drain on back side of ITI building Hamirpur Distt. Hamirpur (HP).
PROVN OF STONE MASONRY RETAINING WALL NEAR TAXILA HOUSE AT RMS CHAIL UNDER GE (I) JUTOGH
C/o Regulated Sub Market Yard Banjar, Distt. Kullu, H.P. SH C/o R.C.C Retaining Wall.
Restoration of Retaining wall along sewa river damaged during flood in front of DC Office, CISF.
Restoration of retaining wall on right bank of TRT Outlet Road of Chamera II PowerStation Karian
Repair to path, drains, retaining wall and allied infra in various locations at Mil Stn Dharamshala
C/O Rain harvesting tank at CHC Sarahan tehsil PachhadDisttSirmour and Construction of Retaining wall etc
Construction of Retaining wall at surgeshaft road in between RD2520 to RD 2540 (Pkg. No.PHC3-05)
Construction of Retaining wall at Surgeshaft road in between RD2250 to RD 2270 (Pkg. No.PHC3-06)
Construction of retaining wall at E/M workshop of Main Campus at CRI Kasauli Solan (HP).
Repair and maintenance of G.S.S.S Narag (SH- C/O PCC protection wall )
Construction of protection wall near Josav house in ward no.14 Solan
Repairing of damaged protection wall behind Aeon cafeteria at CPS-1, Khairi
P/L interlocking paver block in parking and C/o retaining wall).
Repair of damaged portion of retaining wall near CISF Check Post, CPS-II and III of Kariyan Colony of Chamera-II Power Station, HP
C/o 5/7 meter Wide Formation Cutting along with Retaining Walls and Breast Walls, Providing Cross Drainage Works, C/o Essential Parapets, Katcha Drains and Sign Boards and Kilometer Stones Km 0/0 to 3/187
Construction of Tanda road to Balla upto Martured Late Gunner Operator Bhagwan Dass Km 0/000 to 0/550 Mohal Sadarpur in Distt Kangra (HP) (SH- Formation cutting, retaining and breast walls cross drainage work, side drain and culvert).
Construction of path cement concrete pavement along Retaining wall from Bharan Lohara road to Kamal Chaman ke Ghar tak in village Lohara Under MLALAD Deposit work SH Construction of Retaining wall and Providing and laying cement concrete pavement
SH Balance work i e providing and laying 30mm thick SDBC V Shape drain Retaining wall Breast wall Edige wall and wire crates etc
SH Metalling Tarring, Retaining wall, Breast wall, cross drainage, PCC Drain, CC Pavement, Imp. of curves, setting Out, Parapet and 5 year routine maintenance
Formation cutting Retaining wall Breast wall cross drainage Mettaling Tarring Precast concrete paver block RCC drain parapets and road furniture including five year maintenance
Removal of deficiency, P/L Metalling and tarring work, Retaining wall, Breast wall, crate work, HP culvert and 2.00 metre span RCC slab culvert
Repair of Damaged retaining walls From RD 5.800 KM to RD 5.820 KM and RD 3.500 KM to RD 3.517 KM at Dam to Goli Road, CPS-1.
Restoration of rain damages on Bharwain Chintpurni Talwara road km 000 to 15310 SH Const of protection work in wire crates to existing retaining walls at various RDs
Const of Ambulance road from Chil Kandi to Chambriyan Basti in GP Gindpur Malaun km 0000 to 4000 SH Const of Retaining walls Vshape drain etc under MMGSY
Construction of Labs and Examination Hall for Under Graduate Students COA CSKHPKV,Palampur. (SH Construction of Balance Civil work, Retaining Walls, Drains, Approach Road and W.S and S.I)
Repair to drains, path, retaining walls, parapet walls, kerb stones, culverts, view cutter and fencings etc at Yol Cantt under AGE B/R-II of GE (KH) YOL
Construction of RCC Retaining wall in front and middle near NH road for proposed RSD at Nurpur
Construction of boundary wall, toe wall and 100 mtr. track for School boundary at LP-01 area of North Campus of IIT Mandi
R.R damages Hot Water Spring to Village Nathpa Km 0.00 to 9.735 SH- C.O R.wall with Toe wall at RD 0.835 to 0.846
C.O Rangle Miroo Road at RD 0.00 to 5.095. Sub Head- C.O B.Wall with CC Toe Wall at RD 3.900 to 3.920.SDMF
SH Construction of RCC cantilever retaining wall toe wall and apron river diversion removal of obstruction at RD 50000 to 50300 300
C/O PCC Retaining wall with Toe wall in CC 1 3 6 at Km.0/932 to 0/952 (under PDNA)
SH Co RCC cantilever retaining wall for embankment protection C o Toe wall and Apron and river diversion and removal of obstructions
SH ROFD work Retaining walls Breast wall at various RDS 900mm dia Hume pipe culvert at RD 0630 Interlocking paver block at essential reaches and MT in km 000 to 0750
Widening of turning point of Cart road to Mall road at Chotta Shimla SH Cutting work alongwith construction of 32.00mtre C.C. Breast wall etc. under Smart City project
RR Damages on link road to village Pahar Km 0.0 to 1.500 SH Co RWall at RD 0440 to 0.457.50 and Breast wall at RD 0.408 to 0.420
Repair of Ware House building for storage of EVMs and VVPATs at Baloo Chamba (SH P/L interlocking concrete block pavement, steel shed Roofing, const of Breast wall)
Restoration of rain damages on Bhutti Bhalyani road km 0/00 to 4/500(SH-Construction of Breast Wall at RD 0/890 to 0/920) under PDNA
Restoration of rain damages on Darka Bhumteer road Km 0/000 to 7/000 (SH- Construction of wire crated Breast wall at Km 0/125 to 0/145).
Restoration of Rain Damages on Chamba Sahoo Kiri road Km. 0/0 to 21/0 (SH Construction of PCC Breast wall at RD 1/850 to 1/875)
Restoration of Rain Damages on Dalyanoo Pullilani Nainidhar Road km. 0/00 to 22/800 SH C/O PCC Breast Wall from km. 6/520 to 6/555).
Restoration of rain damages on Banethi Bagthan Rajgarh Chandol road Km 48/0 to 87/0 (SH C/O Breast wall between Km 82/315 to 82/330 ).
Restoration of Rain Damages on Nohra Bogdhar Methli Road km. 0/00 to 34/00 (SH C/O PCC Breast Wall from RD. 11/225 to 11/250).
Restoration of rain damages in Tarna Sihagla road km. 0/00 to 1/355. (SH- Construction of Breast wall at Rd 0/365 to 0/372). 3rd call
Re-Tender for C/o Toe wall, steps and paved path between faculty housing C23 and C24, C30 and C31 and raising the height of existing toe wall between C20 and S11, C20 and C19, C19 and C16 and C19, back side of C22 and back side of C24 at North campus