Loading…
Loading…
5,613 results • Best match
C/o Retaining wall, Breast wall, Cross drainage at various RDs, Side drain, Parapets and Providing and Laying WBM Grading-I and Cobble stone Pavement
C/O Breast wall at RD 1/389 to 1/434,1/457 to 1/484 and Retaining wall at RD 1/546 to 1/563.50
REPAIR TO RETAINING WALL BREAST WALL DRAINS AND FENCING AT KARCHAM AND POARI IN THE AREA OF AGE BR I POOH UNDER GE 863 EWS
Construction of protection wall of FRU building Civil Hospital BagsaidTehsil Thunag Distt mandi
Restoration of damaged protection wall of Penstock near Valve House at BSPS, Surangani
C/O GSS Pujarli No.4 (SH- Protection wall behind the School Building)
Construction of protection wall for the protection hill slope in C No 30
CO Protection wall at Govt High School Bhamnoli SH CO BWall Deposit work
Construction of road from Santoshgarh Swan bridge Left Bank to Gowthani Aquachem Private Limited Factory (SH Construction of Retaining walls embankment GSB at RD 0.0 to 0.375 (Deposit work)
Construction of retaining walls at Pit B and Pit C of Tower No 27 of 220 kV DC Charor Banala Transmission Line under HPPTCL PIU Sarabai District Kullu (H.P)
Restoration work of Lower side of Retaining wall for Centre Store of Bassi Power House adjoining to Neri Khad, retaining wall of Sub-ordinate Rest House, washed away during the heavy rain under Bassi Power House Division, HPSEBL, Joginder Nagar.
Construction of retaining wall for LWSS at GP Bhiun and Nauhali Drahal under ESD NOII Joginder Nagar and Construction of retaining wall DTR foundation and fencing for SOP to LWSS to habitations of GP Main Bharola 2nd Stage underESD Chauntra
Construction of toe wall and providing and fixing stainless steel railing at back side of C-14 block at North Campus of IIT Mandi.
R.R damages on Tapri to Chholtu Punang KM 0.00 to 5.00. SH- C.O R. Wall with PCC Toe Wall at RD 1.255 to 1.270
Provision of toe wall and railing to the street from Rampur road to Baba Balak nath Mandir Moh. Neelaghat ward no. 11 MC Una.
Providing and laying wearing and tarring, providing and laying cement concrete pavement, construction of road side drain, construction breast wall, retaining walls and formation cutting between Km 0/000 to 1/500
Construction of Breast wall on Nalagarh Bawasni road kM 0 0 to 16 0 in G P Bawasni in between in between RDs 11 550 to 11 585 D C Deposit
C/O PCC Toe wall a/w Retaining wall at RD- 6/240 to 6/257 and ROFD at various reaches(under PDNA)
Construction of PCC Toe wall alongwith Retaining wall at RD 5-210 to 5-225 and 7-730 to 7-750 under PDNA
SH Construction of RCC cantilever retaining wall toe wall and apron river diversion and removal of obstruction RD 43300 to 43570 270 Rmt
SH C O Cantilever retaining wall toe wall and apron river diversion and removal of obstruction at RD 43000 to 43300 300 Rmt
C/O PCC Toe wall a/w Retaining wall at RD- 0/080 to 0/87 and ROFD at various reaches(under PDNA
Providing and placing PP rope gabions and Tetrapod from RD 400.0 M to RD 530.0 M (EL1155.0 to EL1164.00) at CPS-II Dam site
Construction of Parel Kohlari road Km. 0/0 to 12/50 (SH CoConstruction of Parel Kohlari road Km. 0/0 to 12/50 (SH Construction of retaining wall at various RDs)nstruction of retaining wall at various RDs)
Restoration of rain damages at Gamru village on link road from Brahmi Devi house to Sat Sang Shed. S/H - C/O drain and breast wall Ward No.5
5. Construction/Improvement on circle road in Shimla Town (SH Breast wall and protection work between Rd 150/940 to 150/980)(Below forest office) (Under Shimla Smart City
AR and MO on Jole to Kainth road via Bhooran Amroh Dhrun Kuhroo road Km 000 to 14255 SH Const of Breast wall at RD 0336 to 0366 RHS
Restoration of Rain Damages on NH.305 Sainj Luhri Aut Road Km 0.00 to 97.00 SH. Construction of Breast wall in Random Rubble Masonry at RD 73.030 to 73.045
Restoration of Rain Damages on link road to village Dhanei Km. 0/0 to 1/600 (SH Construction of PCC Breast wall at RD 1/040 to 1/062)
Estimate for construction of Breast wall at Road side RD 0.00 to 13.00 of sub-station around 630 KV 22 0.4 KV Sub Station IPH Stage 2nd at Thanuta
Restoration of Rain Damages on Sarahan to Chubra Dadar road Km. 0/0 to 1/500 (SH Construction of PCC Breast wall at RD 0/460 to 0/520)
Removal of Formation Deficency , Retaining walls and breast walls,Cross drainage work 900mm dia Rcc Hume pipe Culvert Providind and Laying WBM Grade-I,II,III ,Metalling/Tarring, Road side drain,PCC Parapets ,Sign boards and kilometre stone etc
Construction of formation cutting, retaining walls breast walls, metalling tarring, catch water drain, bituminous works, cross drainage structures, parapets, dumping site, stone sign boards in RD 0/00 to 4/436)(RIDF-XXIX) (Under NABARD) (i/c 5 years
Removal of formation deficiencies, C/o Retaining walls, Breast walls, wire crates, Providing and laying Metalling and Tarring, C/o road side drain, C/o road side parapets, C/o Cross-drainage works,providing and fixing road safetymeasures, maintenance
C/O Formation cutting, C/O retaining walls and breast walls, RCC Hume pipe culverts 900mm dia, C/O Metalling and Tarring, C/O PCC V-shape drain , PCC Parapets and road sign boards including Five years routine maintenance
Construction of 5/7 Metre wide formation cutting, Retaining walls, Breast walls, construction of RCC slab culvert 3.00 Metre span and Providing and laying Granular Sub Base, Soling and Wearing stone aggregate at RD. 0/0 to 0/330
Construction of protection wall up to toe wall for field of Sh. Nek Ram in km. 0/195 to 0/215
Construction of Gabion Wall at Solid Waste Management Plant Salogra belonging to MC Solan.
Improvement and Widening of Karpat to Khanjar road Km 16/00 to 29/00SH R O F D Breast wall cause way and Crated wall etc at various Rds
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets and road furniture including five year maintenance) under NABARD RIDF XXVII
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, PCC drain, Parapets and road furniture etcetra including five year Routine maintenance) under NABARD RIDF XXVII
(Sub Head- Construction of Breast wall at RD 3/970 to 4/006 and retaining wall at RD 3/980 to 4/015 under PDNA 2023
Construction of PCC Retaining wall at R.D. 0/105 to 0/115 and PCC pusta, wire crated Breast wall at R.D. 0/105 to 0/120)
C/o breast wall at RD 0/560 to 0/570, 0/630 to 0/645 and C/o retaining wall 0/670 to 0/680
Improvement of Metalling/Tarring Surface, Retaining wall, Breast wall, Crash Barrier, Side Drain, Parapets and Road side Furniture in between Km. 43/760 to 48/060).
(SH - Construction of PCC Retaining wall at km 1/055 to 1/070 and Breast wall at km 1/070 to 1/082 under PDNA 2023)
Providing crate wire in front of the existing retaining wall near temple, commercial and domestic buildings near Aut Bazaar along the rim of Larji Reservoir under Arb and Mtc. Division HPSEBL Thalout
SH Construction of Retaining Wall in Wire Crate at RD 23.400 to 23.430.
Imp widening and paver work on Gholti to Bhagwanpura road upto Jawahar Navodaya Vidyalaya Km. 0/0 to 0/900 (SH Construction of Retaining walls and paver work ) under SCSP
SPECIAL REPAIRS TO RETAINING WALL ADJACENT TO DUTY COY COOK HOUSE AT 14 GTC SUBATHU UNDER GE KASAULI