Loading…
Loading…
3,829 live2,617 closing this weekmost from Madhya Pradesh Rural Road Development Authority and PWD
3,829 results • Best match
Junction Improvement work of Link road to Bolpur Nanoor -Bolpur Kankalitala Road (VR) under Bolpur Highway Sub Division of Birbhum Highway Division-II, in the District of Birbhum during 2026-2027.
WARD 2 CBN MARG SE JOGENDRA BABA KE MAKAN TAK CC ROAD WORK
WARD 7 CBN MARG SE AKBAL BAHADUR KE GHAR TAK CC ROAD WORK
Emergent repair of road surface from 28.00 km to 31.00 km of Maneybhangyang- Sandakphu Road under Darjeeling Division P.W.D during the year of 2026-2027.
Repair of road 65 to 72 SP Institute Lane and 73 to 84 SP Institute Lane Ward No- 10 in Baranagar Municipality under Pathasree Urban
Repairing of Bituminous Road Works from h/o Chandra Kanta Banik upto Lakshman Ghosh at Ward No.09 Within Habra Municipality.
Construction of Road at different places in Suti II and Farakka Blocks. b) Construction of road from NH-12 towards Rail Karbala to Kalibari and Chander More towards Dakshin Mahadebnagar and Anesur Garden under Farakka Block.
Potholes and Patch repairs of Bituminious road from PMGSY Road Haradhan Ghosh House to Golagory Panchanantala under Jamgram Mondolai G.P. within Pandua P.S. in the District of Hooghly.
CC road construction from Munne Bakery to Nafees house
Construction of road from Aiho Boxinagar Path Bhaban to Banpur Rail Gate under Habibpur Block.
Construction of road with sand gravel at Moinapuri village from Modo house to Ribon house.
Construction of road from Kalitala Primary School to Mochka Dighi Hatinda Crossing under Gazole Block.
Heavy repair to outside plaster, sunshade, balcony, parapet wall, leaky Roof, approach Road, sewer, system, replacement of Broken doors, windows, SCI stacks and providing safety doors, Improvement of kitchen, bath, lavatory, Room tiles, sanitary fittings and development of common area in Block.1 to 6, 11 to 12, at Wazirpur staff qtrs. in the section of SSE/W/Punjabi bagh under ADEN/E-II and Repair to apron of blocks and parks, repair to toilet, urgent misc. repair to quarter, and repair to unpopular/newly allotted qtrs. at DKZ-II Railway Colony in the S/o of SSE/W/DKZ-II under ADEN/E-IV.
Annual Maintenance of a) Road from Belagalapeth Cross connecting Honkana km 0.00 to 10.49, km 10.69 to 18.86 & km 19.04 to 31.21 & Link road from Hotanhalli connecting SH274 Junction km 0.00 to 1.54 b) Road from Havangi Cross connecting Hirehullal km 0.00 to 6.16 c) Road from Balambeed connecting Yallapur km 0.00 to 3.12, km 3.76 to 9.87 & km 9.96 to 11.95 d) Road from Makaravalli connecting Kallapur km 0.00 to 7.99 in Hangal taluk of Haveri district for the year 2026-27
Construction of 150 Bedded Hospital for ESIC at Kalol, Gandhinagar, Gujarat. Sh: Planing, Designing and construction of buildnigs including internal water supply, sanitary installation and Drainage, Development work like UG sumps Terrace water Tanks, ... Harvesting, Internal Roads , ...
Repair of road Metropally plot no 49/A/45 TO 49/a/42 A K Mukherjee road ward no - 18 in Baranagar Municipality under Pathasree Urban
CONSTRUCTION AND REPAIR OF ROAD AT WARD NO-03 (Part-B) WITHIN UTTARPARA KOTRUNG MUNICIPALITY, (List of 02 nos of road are attached in Annexure-I)
Sub Head- Construction of 900mm Dia Hume Pipe Culvert at RD. 0/005, 600mm Dia Hume Pipe Culvert at RD. 0/230 and P/L Interlocking Paver Block Flooring in Km. 0/000 to 0/300 along with Edge Wall) Under Head MMSY.
Repairing of Bituminous Road Works from 2 no. Railway Gate upto h/o Aloke Chakraborty at Ward No. 16 Within Habra Municipality
Road construction work from the house of Jawahar Gaddi to the house of Khush Mohammad Gaddi, and drain construction work from the house of Mumtaz Ansari to the house of Rafiq Ansari, in Gadiyani (Ward No. 43) under the Bettiah Municipal Corporation.
Resurfacing & Strengthing Various Road of Ta.Waghodia Dist. Vadodara Under MMGSY Normal (2026-27) (Pac.60) 1. Resurfacing & Strengthing Muvada Vankuva Ashram Road Km. 0/0 to 2/60 (VR NP) Ta.Waghodia 2. Resurfacing & Strengthing Machlipura Approach Road...
Construction of Road from DO Bunglow Gate to Kewi Bari,Upper Kashyem,Govt.Cinchona Plantation Munsong Kalimpong.
MAINTENANCE AND CONSTRUCTION OF ROAD FROM SANTOSHIMATA MANDIR TO HO BARNALI ROY AT SANSAD NO VII
Construction of roads at different places in Tapan block of Dakshin Dinajpur District. b) Construction of Metal Road from Telighata Bridge to Jamalpur via Fatepur, Aktail, Holidana, Kakna with 2 nos. Box Bridge under Tapan Chandipur GP under Tapan
Repair of pot holes in between km. 0/0 to 2/0, 0/0 to 1/0 P/L wet mix Macadam in between km. 0/0 to 1/800 0/0 to 1/500 respectively
(1) Provision of Standard Cantilever Arrangement on Platforms in MYS And CTA Depots Jurisdiction.(2) OHE modification in connection with " PROPOSED CONSTRUCTION OF ROAD UNDER BRIDGE (RCC BOX WITH OPENING OF SIZE 1X7.5MX5M) IN LIEU OF LC NO.72 AT KM 122/500-600 BETWEEN BSN-RDI STATIONS. (LAUNCHING BY CRANE METHOD) BRIDGE NO.119
Repair of road Main road plot no 49 new Noapara 1 to Plot no 50/1 Sarada Pally ward no - 18 in Baranagar Municipality under Pathasree Urban
Repair of area damaged due to PHE cutting for the road L028-T02 to Samantapara L028 Fatikgachi Busstand to abberia Hospital Via Sidheswar under PMGSY Package No. WB-09-328
Potholes and Patch Repairs of concrete road from Tarakeswar PWD road Tulyan Bus Stand to Tulyan PMGSY road under Keshab Chak G.P. within Tarakeswar P.S. in the District of Hooghly.
CONSTRUCTION OF PAVER BLOCK ROAD FROM PMGSY TO SANDIP NAGASAYA HOUSE, PART NO.11/95 UNDER CHUAPARA G.P, KALCHINI BLOCK, ALIPURDUAR DISTRICT DURING THE YEAR 2026-2027 (Length - 950 Mtr)
Construction of Paver Block Road from house of Pathari Singha to PMGSY road under Bagha Sansad at Buraganj GP in the district of Darjeeling. (Length-500.00 m, Width-3.50 m)
SH unlined drain and removal of shrub along road side and Hiring of JCB for removal of slips
Road Repair works from Basar Railway Station to Navegaon of Basar(M) in Nirmal(D) Est cost of Rs.135.00 Lakhs
widening and strengthening of Road from PWD Road to Water Works at Ghoranwali (V1) (Road ID 10480) 80mm thick IPB in km 0.000 to 0.100 and 20mm thick PC in km. 0.100 to 0.570 and New Construction in Km 0.570 to 0.740 in Sirsa Distt. Widening and Str
Rehabilitation, Special Strengthening and Repair of Bridges Work. (Package-1 Bhopal)
WARD 1VIKAS SINGH KE GHR SE BECHAN KE GHR BHUMIGATI NALI AND CC ROAD WORK
Construction of Road from Gyan Jyoti More to GTA Godown near Pintail Village Dagapur, Matigara, Dist- Darjeeling
Improvement of road at ward no 31- 1) s/f Sitala para from main road Culvert to Tapan Sarkar house 2) s/f Sadhan Biswa to Biswanath Roy to Amal Biswas to Atal Halder to Ananda Karmakar House at Sitala Para
Construction of paver Block Road from PMGSY Road to Khokon Mia house via putimari MasJid under Latapota GP within Mathabhanga-ll Dev. Block in the District of Cooch Behar. Gr. 02
Road Repair works from Kirgul-B to Basar of Basar(M) in Nirmal (D) Est cost of Rs.280.00 Lakhs (2nd Call)
Road Repair works from Petrol Filling Station to Shankari School in Basar (M) of Nirmal (D) Est cost of Rs.45.00 Lakhs
Emergent repairing works of Kalna Link Road from 0.00 Kmp to 2.00 Kmp including ROB approaches (Katwa Side and Kalna Side) by Repairing Potholes, 20 mm premixed carpet and Seal Coat under Burdwan Division, PWD
Supplying of machine crushed hard stone track ballast-34335 Cum confirming to RDSO's Railway specification (IS/RDSO-GE/0001: 2023) February 2023 and latest correction slip as directed from identified source from Ramkumarpura mining area, located at ... making approach road and ...