Loading…
Loading…
10,867 results • Best match
Periodical renewal coat with 30mm Bituminous concrete with paver on link road from Repoh to Kudet Jandoh Suri km 4000 to 5000 HP1204VR0074 including thermoplastic paint edge line V shape drain at essential RDs under PMGSY
Periodical Maintenance of link road from NH-22 to Thangi (Under Annual Maintenance plan for the year 2023-24 (PMGSY road) (VR-HP0502VR004121206, 207,208,209 and 210)(SH- Annual surfacing from Km. 5/00 to 9/370
Periodical Renewal on Chandernagar Mahasu road in K.M. 0/00 to 9/00 under AMP-I for the year 2024-25 for rural roads
Repair of Approach road and gate of Assistant Manager Office Ranital unit under Divisional Manager Forest Working Division Dharamshala
Strengthening of road from NH 105 to Gullarawala via Lehi 0/000 to 5/000.
Widening of road from Lower Lab to Kalyana R.D 0-250 to 0-258.50mtr in Kanlog ward No.34
Periodical renewal on Chole to Kotkhai Bazar road, Kupri Link road and Link road to village Deori in G.P. Kiari
SH P/L 25mm thick bituminous concrete in km 1/0 to 6/0 DRRP No.HP0306 VR0045 under PMGSY
AMP on link road from Dangar to Chokna road km. 2/00 to 4/00 (SH P/L 25mm thick mix seal surfacing including repair of road)
Annual Maintenance on link road to village Fewari road km 0/00 to 1/00(SHProviding and laying 25mm thick Mix Seal Surfacing including repair of road )
Periodical Maintenance on Link road Badsala to Kailian Mohalla in Km 0000 to 0600 Link road to Harizen Basti Badsala in Km 0000 to 0600 Link road to Village Harizen Basti Takka in Km 0000 to 0100 and 0300 to 0930 and Link road from Shamshan Ghat
A/R and M/O link road to Sanghnai Kala Panga Km. 0/0 to 6/260, Link road to village Ambota Km. 0/0 to 0/639, Link road to village KhadGujjran in GP Sanghnai Km. 0/0 to 3/0, Link road to village Dadhwalan Mohalla Ghanari Km. 0/0 to 1/460, Link road to
Job 1 Construction of link road Jaijon Modh to Tahliwal Chowk via Bhai Ka Modh including 3 Nos Bridges from Km. 0-0 to 17-500 MDR-129 Sub Head Construction of 60.0m Long Span Bridge Over Badhera Khad at Km. 2-505 including approach road from
Job 3 Construction of link road Jaijon Modh to Tahliwal Chowk via Bhai Ka Modh including 3 Nos Bridges from Km. 0-0 to 17-500 MDR-129 Sub Head Construction of 30.0 Long Span Bridge Over Palkwah Khad at Km. 11-315 including approach road from
Restoration of road approach road leading toward Marlyn Park at Tutikandi ward No10 Balance Work
Repair and maintenance of Approach road and side drain for resin depot qtr jagni ranital
Construction of approach road to Equine and Goat Unit Deptt. of LFC, COVAS, CSKHPKV, Palampur.
Periodic maintenance of Hachichik Bag Rani Ka Baroh road (HP0408VR0205) under Additional AMP for the year 2021-22 for Rural road Non PMGSY) in Distt Kangra(HP)(SH-Providing and laying 30mm thick Bituminous Concrete pavement at Km 4/000 to 6/000)
Periodical Maintenance of Nagheta to Banour road under Annual Maintenance Plan for the year 2021-22 for rural road (Non PMGSY) (SHRepair of pot holes and providing 10cm wide road marking and 30mm thick bituminous concrete in km. 0/0 to 5/0
Periodical maintenance of link road from NH-22 Km. 4020 to Ropa Khas (Under AMP for the year 2023-24 (PMGSY road) (VR-HP0502VR006721301, 302 and 303) (SH- Annual surfacing from Km. 0/00 to 3/00
Periodical Renewal coat 30mm thick bituminous concrete with paver on Link Road Sohari to Behlan km 000 to 4000 HP1201VR0070 including thermoplastic paint egde line Vshape drain at essential RDs under PMGSY for the year 2022 23
Annual Maintenance Plan for PMGSY (Additional Kms.) for the year 2024-25 on link road Gehrwin to Behna Jattan in Km. 6/0 to 7/0 (SH-Providing and laying 25MM thick Mix Seal Surfacing on road).
Construction of Link road to village Daroga Km. 0/0 to 4/500 (SH Balance work of Metalling/ Tarring work ,Crash Barrier ,Drain and sign board under PMGSY, (Batch - II, 2018-19) Package No. HP-02-338
1 Patta Jalari to Mann road km 1/0 to 3/0. 2 Mandetar T-03 to Majhot road km 0/0 to 8/200. 3 Sasan to Putrail road km 1/0 to 2/0
Repair of Internal road of ESIC Model Hospital Baddi (HP).
Annual Maintenance on link road to Jhungi to Barota km. 0/00 to 2/00 (SH Providing and laying 25mm thick Mix Seal Surfacing including repair of road )
MPR/2024/428, C/O (Construction of) Road/ Geometrical Improvement of road from main road to village Rakharara GP Haler (SH C/o R/wall from RD 0/449.20 to 0/460) Deposit work
Maintenance of all buildings and roads at CSKHPKV, Palampur.(SH Resurfacing of road from COCS to Gate No.5 by providing and laying bitumenous concrete etc.)
(SH- P/L 25mm thick Bituminous Concrete with Paver finisher in km. 3/000 to 4/000)(PMGSY Road)
Construction of road from Larth link road Bhangoli Upli Jhikli to Deror Approx 500 mtr. Under MLALAD Deposit work SH Providing and Laying cement concrete pavement at RD. 0.120 to 0.237.
Widening of road and P.L. inter lock paver blocks from Staja house to Raghuwanshi house ward no.10 Phase-III
Widening of road from Navrattan House to Modhal House Lower Kaithu in ward No 3 SH C O R wall
Widening of road leading from Bharari Bazar to Tara Bari RD 0 0 to 0 250 in ward No 1
R R Damages to Baridhar to Jamkeya Basti road km SH Widening of road at RD 0 690 0 830
Restoration of link road km 000 to 200
RRD on link road from Patlikuhal Naggar road
R R Damages to link road village Larot
link road km 0/00 to 0/600
RRD on link road from inspection Benglow Naggar
Strengthening of road from Baddi Sai road to village Chakkan via Omaxe and housing board colony.
Strengthening of road from NH 105 to maira kasambowal with interlocking pavers in water logged portion.
P/M of link road to village Ghuggar to Rodi (Bundla Ghuggar Thakurdwara road under PMGSY (HP0402VR003519302) (AMP 2022-23) Phase-I (SW- P/L Bituminous concrete and road marking etc. in Km 1/00 to 2/00)
Annual Maintenance Plan for the year 2024-2025 (PMGSY Roads) on link road to Behal Goalthai Bada Koranwala road Km. 1/0 to 2/200 (SH- Providing and laying 25mm thick Mix seal surfacing Type A (VR-0203)
P/M of link road to village Kaliankar (Sidhpur Sarkari to Kaliankar under PMGSY (HP0402VR010419301) (AMP 2022-23) Phase-I (SW- P/L WBM-II, Bituminous concrete and road marking etc. in Km 0/00 to 1/00)
Periodical Renewal coat with 25 mm thick bituminous concrete with paver, thermoplastic line zebra crossing on Link road Repoh Missiran to Paloh Km 2000 to 3000 and 6240 to 5800 HP1202 VR 0029under PMGSY for the year 202425
Periodical Maintenance of Link road from NH-22KM 4020 to Ropa Khas (Under Annual Maintenance Plan for the year of 2022-23 (PMGSY Road) (VR-HP052VR00672131, 302 and 303) (SH- Annual surfacing from 0/00 to 3/00
RR Damage to Link road from Jakhnoti to Haunchali road KM 000 to 500. S.H CO Bwall in RR masnory in cm 16 at R.D 405 TO 4035 and kharanja stone soling at RD 4150 to 5150 widening of road at RD 4645 to 47204930 to 4990 and unlined surface drain at R
Construction of 30.48 mtr span Motorable Bridge between Salpat 1 and 2 SH Construciton of approach road on. SH C-o approach road on Salpat II side and R-Wall at RD 0-00 to 0-012
Restoration of approach Road (Completely damage) to approach road from Four Lane to Harabagh Office complex RD 00 to 300 mtrs And junction of Office complex Road to Water Tank at Harabagh RD 00 to 300 Mtrs
Construction of Approach road to Type-III Qtrs Behind Paraclinic Block in Dr R..P. Govt. Medical College at Tanda in Distt Kangra (HP) (SH Construction of cement concrete pavement and steps in Approach road (Deposit work)