Loading…
Loading…
10,868 results • Best match
Construction of 30.48 mtr span Motorable Bridge between Salpat 1 and 2 SH Construciton of approach road on. SH C-o approach road on Salpat II side and R-Wall at RD 0-036 to 0-060
Periodical Renewal for the year 2025-26 on Link road Mawa Kaholan to Nangal Jarialan SH Providing and laying 25mm thick Bituminous Concrete with paver finisher in Km. 5.0 to 6.120 HP1204VR004452311-PMGSY Link road T01 to Ramnagar
Term Contract for Maintenance and Repair of roads footpaths and retaining walls in Jutogh Cantt for one year
Periodical Renewal in Chander nagar Mahasu road in K.M. 0/00 to 9/00 under AMP (Addll. Kms) for the year 2024-25 for rural roads
Periodical Renewal on Gumma Tapri Bakhol Road in K.M. 0/00 to 6/00 under AMP (Addl. Kms) for the year 2024-25 for rural roads
Periodic Renewal from Km 0/00 to 5/00 and 5 year Routine Maintenance after periodic renewal) (PMGSY Incentive)
Construction of Approach road to Proposed site of Kendriya Vidyalaya Gokul Nagar Upper Bhanjal Under PMKKKY
CO CHC building at Dhussara SH CO Boundary wall including Gate approach road etc against deposit
River side protection work for approach road to pump no 2 and STP at BSPS, Surangani
Construction of approach Road to Cremation Ground at Village Kasol through PAP cooperative society under CSR
Job 2 Construction of link road Jaijon Modh to Tahliwal Chowk via Bhai Ka Modh including 3 Nos Bridges from Km. 0-0 to 17-500 MDR-129 Sub Head Construction of 135.0 Long Span Bridge Over Kangar Khad at Km. 3-700 including approach road from Km
Annual Maintenance on link road to Dehra to kot Kangri km 0/00 to 2/200 (SH Providing and laying 25mm thick Mix Seal Surfacing including repair of road
AMP on link road from Panol to Kharla Devi road 0/00 to 1/00 (SH P/L 25mm thick mix seal surfacing using waste plastic including repair of road)
Job 3 A.R and M.O on link road to Gurplah to Gondpur road km. 0-0 to 6-500, Link road to Village lower Manuwal to Upper Manuwal, Santoshgarh Polian road, Link road to Mahadaiyan village Saloh km. 0-0 to 2-0, Link road to Village from Subowana Baliwal
(SH- P/L 25mm thick Bituminous Concrete with Paver finisher in km. 3/000 to 4/000)(PMGSY Road)
(SH- P/L 25mm thick Bituminous Concrete with Paver finisher in km. 2/000 to 3/000)(PMGSY Road)
(SH- P/L 25mm thick Bituminous Concrete with Paver finisher in km. 1/000 to 2/000)(PMGSY Road)
Link road to village Sal to village Balha
RR Damage to link road bamnoli Rwall at Rd 1050 to 1065
Annual Maintenance Plan for the year 2023-24 for rural PMGSY Road) Providing and laying 30mm thick bituminous concrete on link road Dangar to Patta via Dakhuit Km.0/00 to 2/000)
Periodical maintenance of Shilla to Tatiyana road under Annual Maintenance plan for the year 2021-22 for rural road (Non PMGSY)(SH- Repair of pot holes and providing 10cm wide road marking and 30mm thick bituminous concrete in km. 0/0 to 3/0 and
Periodical Maintenance of Drabil to Jhakando road under annual Maintenance plan for the year 2020-2021 for rural road (non PMGSY ) (SH-Repair of pot holes and providing 10cm wide road marking and 30mm thick bituminous concrete in km 6/0 to 7/0
Periodical Maintenance of Millah to Gundah road under annual Maintenance plan for the year 2020-2021 for rural road (non PMGSY ) (sh- Repair of pot holes and providing 10cm wide road marking and 30m thick bituminous concrete in km 0/0 to 2/0
Periodical Maintenance of Baila Gujon to Kota Pab Km 0/0 to 5/0 road under performance based financial Incentive 2019-20 ( During the year 2020-21) by MORD to eligible States as Central Assistance for Periodic Maintenance etc. of PMGSY Rural road i
Periodical Maintenance of Koffota Kando Cheyog road under annual Maintenance plan for the year 2020-2021 for rural road (non PMGSY ) (sh- Repair of pot holes and providing 10cm wide road marking and 30m thick bituminous concrete in km 6/0 to 7/0
Periodical Maintenance of Baila Gujon to Kota Pab Km 0/0 to 5/0 road under performance based financial Incentive 2019-20 ( During the year 2020-21) by MORD to eligible States as Central Assistance for Periodic Maintenance etc. of PMGSY Rural road i
Periodical Maintenance of Kota Pab to Kiyana Km 0/0 to 5/165 road under performance based financial Incentive 2019-20 ( During the year 2020-21) by MORD to eligible States as Central Assistance for Periodic Maintenance etc. of PMGSY Rural road in S
Improvement of road from Kandi road towards Milap Chand Shop WN11 NPBP
Improvement of road from girtholi road towards Amit Kumar House WN5 NPBP
Improvement of road and drain near house of Pushpinder Sood WN10 NPBP
Construction and Maintenance of Road L025-(Link Road) Khet Pralkote road km0.9 to U Kanari Package No. JK11-4041, PMGSY-IV, Batch-I of 2026-27, Block-Mandi, District Poonch (Using Waste Plastics Length 6.000 Kms) Length 6.000 Kms
Job 6 Periodical Maintenance on link road to Village Saloh Tehsil Haroli Distt. Una km. 0-0 to 2-600 VR. 026 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines ,cat eyes Under PMGSY Head
Job 1 Periodical maintenance of link road to village Badehra from Jaijon road km.2-0 to 5-150 Sub Head Patch work,30mm thick bituminous concrete, zebra crossing in km. 2-0 to 5-150 VR043 Under PMGSY
P/R of link road to village lohgarh km 0/0 to 5/150 (SH-P/L Penetration macadam (50mm.) Bituminous concrete 30mm thick in km. 0/0 to 3/0). (Incentive during the year 2019-20) Under PMGSY.
Construction of Link road to villlage Sanotha road km 0/000 to 4/600 (SH Balance work of Formation Cutting, Passing places, CD Work, Side Drain and Parapets under PMGSY (Batch - I, 2018-19) Package No. HP-02-315
onstruction of Link road to village Ghar Gram km 0/000 to 7/300 (SH Balance work of Formation Cutting, Passing places, CD Work, Side Drain and Parapets under PMGSY, (Batch - I, 2018-19) Package No. HP-02-314
P/M of link road from Palampur to Bandla Tea Estate road via Sainik Rest House and Sushma Hospital under (Rural Road) (HP 0402 VR003019301) (AMP 2023-24) (SH- Providing and laying 30 MM thick B.C. with Paver finisher in Km 0/00 to 1/00)
Repair of internal road at IVRI residential colony Palampur Kangra (HP).
A/R and M/O Link Road Nakroh to Tundkhari Km 0/0 to 5/540, Link Road to Village Nakroh Km 0/0 to 2/270, Link Road Amlehar to Bhaderkali via Rampur Kuthera Km 0/0 to 5/565, Link Road Sunkali to Gokul Nagar km 0/0 to 2/165, Link Road to Harijan Basti
Widening of road from Kainth Estate to Durga Bhawan Ram Nagar Ward No 12 RD 0 150 to 0 250 mtr
Widening of road leading from Bharari Bazar to Tara Bari RD 0 0 to 0 400 in ward No 1 Bharari
Improvement of Pumpe House to Bral Teer at RD 000 to 1500 SH Widening of road at RD 000 to 0960
Widening of road from Lower Lab to Kalyana RD 0 425 to 0 433 50 mtrs in Kanlog ward No 34
R R Damages to Dhara Narpa Pokta road km 0 0 SH Widening of road at RD 1 135 1 225
Widening of road from AG Chowk to AG Office main entrance in Gorton Castle under RBB Section Shimla dg/ 2024-25
Improvement/widening of road from Tunnel 103 infront of SSB Training Centre to Tutikandi By Pass Road under Shimla Smart City
Improvement/widening of road from Tinnel 103 infront of SSB Training Centre to Tutikandi By Pass road under Shimla Smart City
SH C/O C.C. Retaining wall at RD. 0/010 to 0/110 approach road and parking ).
Strengthening of road from Jyoti Lab to VSGM Colony via Coca- Cola at I.A. Baddi (1.900 Km).
Strengthening of road from near Auro Spin colony gate and Vardhman Chowk to Affy Pharma Bridge (Restoration)