Loading…
Loading…
10,868 results • Best match
Construction of link road Gehra Sumari G.P. Bharari to Baroun SH Improvement / widening of road at RD 0/030 to 0/095, C/o Breast Edge wall Left side at RD 0/037 to 0/055 and Right side at RD 0/043 to 0/055 and V-shape drain at RD 0/00 to 0/104 Un
Repair of restoration of rain damages of internal road Green Avenue Colony Rakkar Tehsil and Distt.Una (SH Laying of CC Paver blocks in various internal road Mohal Tabba (Deposit work)
Metalling and Tarring on approach road to helipad at Dhameuli Km.1-0 to 2-0 Deposit job no 2
A/R and M/O on link road to Village Vashishat
Restoration rain damage link road New Nalagarh to Nikkuwal road.
Improvement of curve on link road to tibtain colony road
Co link road Sansog to Koftu km 0.0 to 3.0
CO Link road Oddi Mundadhar Garnu Km 0.0 to 1.600
Co Link Road Prounthi To Jhal KM 0.00 to 1.500
Restoration of rain damages on link road to village Battar
RM of link road Km 0 00 to 1 200
Re-carpeting of link road Rakhghansot to Seri Jhandiyan road.
C/o Link road to S.C. Bass Gharoti, G.P. Baruna.
Improvement of link Road to Timco Steel Company, G.P. Bhatian.
Link road from Shiv Mandir New Nalagarh to Village Gaguwal
C/o Link road to S.C. Bass Gharoti, G.P. Baruna.
Restoration on link road km 0 00 to 2 00
R/R damages on link road Badoh Workshop to Bhattianwala
AMP works on Chiwa link Road km 0.0 to 4.800
Protection work to Gaushala Mahadev to Link road to Gaushala.
Restoration on link road at RD 1510 to 1 600
RR Damages to link road village jiskoon km 00 80
Restoration of Rain Damages on link road to village Nal
Construction of approach road to plot No. 79-C, EPIP Phase-I, Jharmajri, Teh. Baddi, Distt. Solan (HP).
Construction of approach road and culvert for Ind. Sheds at Phase-I, Ind. Area Hatli, Distt. Chamba (HP).
Construction of approach road to Plot No. 1 to 4 at Ind. Area Bal Bihal Distt. Hamirpur (HP).
R O rain damages on approach road leading towards Marlyn Park at Tutikandi ward No 10 Balance work
R O rain damages on approach road leading towards Marlyn Park at Tutikand ward No 10 Balance work
C/O Widening of road near Ram Bhag park ward no 3 M.C. Manali Distt. Kullu ( H.P.) (SH- foot path and boundary wall )
Construction of parking widening of road village Bhakhrai near Meenu General Store in ward No 25 (Balance work) under Shimla Smart City Mission
Construction of Parking by widening of road from Pari Mahal Chowk to Rani Ground in ward No 27 under Shimla Smart City Mission
Construction of Jhamol Nallah to Dhar road Km 0/000 to 2/375 SH Widening of road at narrow stretches at various RDs.
R R Damage Rohru Arhal Bashla Sh widening of road at 9 465 9 575 9 765 9 855 9 930 10 240
P/M of link road Banuri to Bharmat 0/00 to 2/500 under PMGSY (HP0411VR009112302) (AMP 2022-23) Phase-I (SW- P/L 30 mm thick bitumen concrete with paver finisher at RD 1/00 to 2/00 and Thermoplastic strips)
P/M of link road Nanahar to Gount 0/00 to 1/500 under PMGSY (HP0403VR008012102) (AMP 2022-23) Phase-I (SW- P/L 30 mm thick bitumen concrete with paver finisher at RD 0/300 to 1/00 and Thermoplastic strips)
Job 2 Periodical maintenance on link road to Village Khad Km 0-0 to 1-0 VR023, Panjawar Bathri road to village Bhoolgarh Km 0-0 to 0-550, 1-240 to 1-410,1-660 to 1-800 VR134 Under Incentive Scheme PMGSY
P/M of link road Ghar to Ramnagar 0/00 to 4/00 under PMGSY road (HP0402VR004419303) (AMP 2022-23) Phase-I (SW- P/L 30 mm thick bitumen concrete with paver finisher at RD 3/00 to 4/00 and Thermoplastic strips)
C/O 2 Span (16 M each RCC T-beam bridge over Bhatoli Khad at RD 3/355 on link road Reru Jhiriwala Aduwal Janduri (T05) from Km 0/0 to 8/205 under PMGSY-III (Batch II) HP.11-168 A
Periodical renewal on link road from km. 10/300 of NH-707 to Chhachheti (PMGSY road) Under Annual Maintenance Plan for the year 2025-26. (SH-Providing and laying 25mm thick Bituminous Concrete in km. 5/0 to 6/0 including profile correction).
P/M of link road Ghar to Ramnagar 0/00 to 4/00 under PMGSY road (HP0402VR004419303) (AMP 2022-23) Phase-I (SW- P/L 30 mm thick bitumen concrete with paver finisher at RD 2/00 to 3/00 and Thermoplastic strips)
Annual Maintenance Plan for PMGSY (Additional Kms.) for the year 2024-25 on link road Berthin Sargal in Km. 0/0 to 2/0 (SH- Providing and laying 25MM thick Mix Seal Surfacing on road and Providing and Laying Interlocking Paver Block).
Performance based financial incentive 2019-20 (During the year 2020-21) for periodic maintenance etc. (PMGSY roads) on link road to village Gujjar Basti Julakhari in Km. 0/0 to 1/140 (SH-Providing and laying 30mm thick bituminous concrete (VR-0186)
Construction of link road from koti to Rubi jubbar (SH Preparation of FRA case in all respect
Improvement of road and berms from Plot No 38 towards Salico Trading Co, Parwanoo
Improvement of road and drain from main road to suman mehta house WN6 NPBP
Providing and laying 25mm thick Mix Seal Surfacing in Km 0/000 to 1/000
Providing and laying 25mm thick Mix Seal Surfacing in Km 0/000 to 1/000
Providing and laying 25mm thick mix seal surfacing in Km 1/000 to 2/000
Repair and Restoration of Rain Damages link road Daulatpru to Behra road Km. 0.0 to 5.075, link road Gagret Daulatpur road Km. 11.500 to 13.300 and link road Gagret Daulatpur road to Adarsh colony mohalla Lohara Kumhran Trali and mohalla Guga Panga
AMP on Link road from Dabsai to Kallar Datyalan km 0/0 to 2/0 (VR-122) AMP on road Lahar to village chook km 0/0 to1/300 (VR-125)AMP on road from Sai Brahmna to Jassour km 0/0 to 2/0 (VR-121) AMP on road Chamned to Jhamerda km 0/0 to 0/700 (VR-112)