Loading…
Loading…
10,868 results • Best match
REPAIR TO INTERNAL ROAD FURNITURE ITEMS AND SIGN BOARDS AT DGRE RDC MANALI.
REPAIR TO INTERNAL ROAD FURNITURE ITEMS AND SIGN BOARDS AT DGRE RDC, MANALI
Construction of link road Dadh to Gujrehra Km 0/00 to 1/750 under PMGSY four Tehsil Palampur Distt. Kangra (HP) (SW- Preparation of DPR and CBR Test)
SPECIAL REPAIR TO INTERNAL ROAD WITH CEMENT CONCRETE ROAD AT FSD KULLU (Second call)
SPECIAL REPAIR TO INTERNAL ROAD WITH CEMENT CONCRETE ROAD AT FSD HAMIRPUR (Second Call)
Periodic Renewal and Periodic Maintenance on Chhat Sandyar road km 0/00 to 3/300 (Under PMGSY Incentive for the year 2025-26 SH Providing and laying 25mm thick Bituminous Concrete including repair of road and Five year routine maintenance in
Construction of Retaining Wall at approach Road to Mahasu Peak at Entry gate No. 1 Lambidhar (Kufri) Theog Division
Construction of Retaining wall at Hurla Bridge Approach Road of Parbati-H.E. Project (Stage-II) (Package No-C-838)
Construction of Boundary wall and approach road to pump house Phase-III at Ind. Area Tahliwala Distt. Una (HP).
Construction of boundary wall and approach road to Pump House Phase-III at Ind. Area Tahliwala Distt. Una (HP).
construction of retaining wall, approach road including entry gate of Angling Hut at Mahseer Farm Machhial Distt Mandi HP
Construction of boundary wall and approach road to Pump House Phase-IV at Ind. Area Tahliwala Distt. Una (HP).
Underground laying of OFC Optical fiber Cable in conduit along the approach road to intake site of Kashang HEP
CO 80 mtr span double Lane Curved Motrabel Bridge including Approach road over river Beas at Patlikuhal Naggar road
Restoration of rain damages on link road from Sunehar to Mundla Km 0/000 to 3/000 in Distt Kangra (HP) (SH-Construction of road side drain in Km 1/300 to 1/380) (Left Side)
(SH P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/060), Rural Road Dehrian Upper Tiara (HP0406VR136) km. 0/0 to 1/0 (SH P/L 25mm thick bituminous concrete in km. 0/0 to 1/0) and Rural Road Link road to Harizan Basti Tarkhankar (HP
CO Karalash Kanchi to Parmasri Dhar Baram Bai Khorsu Gat Road km 00 to 200 SH Widening of road at RD 0315 to 0570
Widening of road near Buttle House Chitkara Park (SH Construction of Retaining wall at RD 0 0 to 0 021) in ward No 3
Widening of road and Prov. and Laying inter lock paver blocks in ward no.10 from Ajay Sood house to SS Panwar house Solan
Widening of road including construction of Pedestrain from Perci Villa to Brior Villa along with NH under Smart city Shimla project, Shimla Re-invite
SH Providing and Laying Tack coat 30mm Bituminious concrete and thermoplastic layer on PMGSY roads 1 Hamirpur to Baru road Km 0/0 o 1/0 HP0306VR002910101
P/F 80 mm ISI Mark thick tiles on internal roads of HBC Colony, Phase 1 and 2 #502 and near #437 Sai mandir, #310 street, Baddi
CONSTRUCTION OF 3.80 KM INTERNAL ROADS (ROAD COMMUNICATION) FOR DIVERSION OF SERI NALLAH AWAY FROM ATAL TUNNEL, ROHTANG UNDER PROJECT YOJAK IN THE STATE OF HIMACHAL PRADESH
MT link road from Upper Thana to Kut Chatrer to Alsahan
AMP on Link Road to Village Rohtan km 0.00 to 3.00
RR Damages on link road Deothi to Arshata 0.0 to 1.500
Construction of link road Bageri to Bindal Km 0.0 to 3.00
C.O link road from Prounthi to Roita KM 0.00 to 1.500
Balance work of link road to Harijan Basti, Kanwali, G.P. Joghon.
Restoration of rain damages on Link road Village Ghandoral (Under PDNA)
Restoration of rain damages on Link road to Thana via Turan
Construction of link road to Sidh Mandir Dhamandri Distt. Una (HP).
RR Damages on Link Road to village Virgarh 0.0 to 1.0
Construction of Link road from Labana Basti to Kalamghatta village Dollan
Repair Restoration on link road from Lagghat to Jai Nagar road
Providing and laying 25mm thick Mix Seal Surfacing in Km 0/000 to 1/000
Providing and laying 25mm thick Mix Seal Surfacing in Km 0/000 to 1/000
Providing and laying 25mm thick Mix Seal Surfacing in Km 0/000 to 1/000
Annual Surfae and Maintenance on various roads under Division No. III at Benmore Sub Division. (SH Providing and laying renewal coat with bitumen concerete at approach road from U.S. Club to block-4 parking, approach road to new M.H. No. 1 2 6 Rd 0.0
Recarpeting of link road connected to national highway Nichli sandholi to Uparli Sandholi Dadima Sandoli AND C/o link road from VMT to House of Baldev Ram AN C/o link road from Warehouse Malpur to Chakka Bye pass to Sandholi,G.P. Haripur Sandholi
C/o 2 Span (22.0 M each) RCC T-beam bridge over Retar Khad at RD 5/160 on link road from Palli Ratar Thala Rajwean Chanobari (T-15) road from 0/0 to 6/220 under PMGSY-III Batch -11) HP.11-167 A
Annual Periodical Maintenance plan on link road to to village Goshal Km. 0/00 to 0/800 (VR 122) for the year 2025-26 (PMGSY). (SH Providing and laying 20 mm Premix carpet and thermoplastic edge line in Km 0/00 to 0/800).
C/O 22.00 meter single span RCC T-Beam bridge over Mooring Nallah at Km. 10/445 on Link road main road to Bhilali Trilokinath Lobber Udaipur road Km. 0/000 to 13/970 under PMGSY-III Batch-I Package No.HP-07-158 C
Annual Maintenance Plan for the year 2020-2021 (PMGSY) (i)on link road to Village Lakhanoo road km. 0/0to 1/645(VR0104) (ii)Toba Dharot road to Village Jhirian km. 2/0 to 2/665)(VR0105) (SH- Providing and laying 30mm thick bituminous concrete)
C/O RCC T-beam bridge 3 span(19.75 M each)over Kotla Kalan khad at RD 4/935on link road from Baroona to Phalahi (T-08) from Km 0/00 to 5/00 under PMGSY-III (Batch-II) Package No. HP.11-166 A
Periodical renewal coat 30mm thick bituminous concrete with paver thermoplastic center line and zebra crossing on link road Suri to Khuwari Pattian km 00 to 0250 0310 to 0610 0620 to 1040 1080 to 2420 2430 to 3350 HP1202VR0072 under PMGSY for the yea
balance work of bridge portion including wing wall) Scheme under leftout (missing) Bridge under PMGSY
Construction of link road from Panog to Ajroli Km 0/0 to 3/00
Periodic Renewal and Periodic Maintenance on link road to village Kotlu Brahamana km 0-00 to 3-00 Doon to Kotlu Brahmana SH Providing and laying 25mm thick bituminous concrete including repair of road and five year routine maintenance in Km. 0 -00
Widening and Strengthening of road from opposite Abbott Pharma gate going up till Treeoise Resort and meeting Dharmapur Ghared road.