Repair to pumps at pump house, Chloronome plant, RO plant, STP plant, STP septic tanks and comprehensive maint of RO water plant inclement/repair/replacement of unserviceable parts and replacement of membranes etc at AF Stn Najafgarh
Repair and maintenance of existing RWH pits by replacing filter media and other civil works at various locations in East Delhi STP SPS under EE(C) Plant S E.
Repair and maintenance of existing RWH pits by replacing filter media and other civil works at various locations in South Delhi STP SPS under EE(C) Plant S E.
Restoration of drainage system including construction of road in front of Administrative block in Yamuna Vihar STP
Renovation and repairing of PST No.02 and strengthening of MS Structure at Sector 25 Rohini STP
Cleaning of STP/ETP in monsoon season required at LBS Hospital and the miscellaneous repair work required at the Biomedical waste Block and Electrical STP/ETP room renovation under sub division II in Lal Bahadur Shsatri Hospital Khichripur, Delhi
Irrigation of MCD Park in Yamuna Vihar Ward of Shahdara North Zone by Treated Water from DJB STP Yamuna Vihar Delhi Sub Head Civil works for underground water tank and booster pump and main pump room at DJB STP
Irrigation of MCD Park in Yamuna Vihar Ward of Shahdara North Zone by Treated Water from DJB STP Yamuna Vihar Delhi Sub Head Civil works for underground water tank and booster pump and main pump room at DJB STP
Repairing of Air Circuit Breaker (L and T make) installed in LT Panel of Aeration Tank at Yamuna Vihar STP Ph-I.
Improvement and Strengthening of effluent channel from 45 MGD STP to Pump House Okhla
Painting of rising mains and bridges from all sps under STP kondli PH IV
Providing Comprehensive Annual Maintenance Contract and Manpower Services for STP Plant at Police Colony New Ashok Nagar
Repair and Replacement and Sewer Cleaning works at STP Plant installed at DPA Jharoda Kalan, Campus I.
Providing Online Monitoring System for STP installed at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, New Delhi
Provision of Safety Arrangement below Overhead Conveyor at In-house STP facility at LPG Bottling Plant, Tikrikalan
Repairing of damaged/ defective Beta Blowers no. 1 and 2 at STP Dhaka Complex, University of Delhi
Providing and laying HDPE pipe from Municipal Sewer Line to Singapore Park STP at Chandra Gupta Marg
BIO CULTURE FOR STP, FLUSH TYPE PIANO SWITCH 15AMP SINGLE POLE ONE WAY, FLUSH TYPEPIANO SWITCH 5AMP SINGLE POLE ONE WAY, SWITCH SOCKET COMBINATION 2 IN 1 15AMP, SWITCH SOCKET COMBINATION 2 IN 1 5AMP, TUBE 20W, BLEACHING POWDER, XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) BOQ Title BOQ BID
Repairing Operation and routine maintenance of STP
Providing and fixing of starters for 40 HP Motors of Aeration Unit-2 at STP Sector 25 Rohini
Deployment of staff for operation and minor maintenance of E and M equipment at Rohini Sector -25 STP.
Renovation and repair of Mechanical Bar-Screen Jaal No.01 and allied works at Rohini Sector-25 STP
Repairing/renovation of rack classifier No.1 and conveyor belt of five bar screen with allied works at Yamuna Vihar STP Ph-II.
Removal of Grit/Floating material from adjoining roads of drying beds at Yamuna Vihar STP Phase-I under EE(Civil Plant) S/E
B Providing services of electricians and helpers for maintenance of electrical installations C Providing services of substation DG operators and helpers for substation and operations SH Repair and replacement of LED lumanairies in main ADM building
1. Providing of Online biological parameter monitoring system for 25 KLD ETP/STP Plant at Sushruta Trauma Centre,2.Operation of 25KLD ETP/STP installed at Sushruta Trauma Centre9,Metcalfe Road Delhi 3.SITC of Router and other allied accessories requ
Supply of cables of various sizes under the division of EE SDW IV Kondli STP
Procurement of chemicals for day to day operation of 45 MGD STP Ph IV Kondli
Repairing Strengthening, Desilting and painting of raw sewage influent channel of Kondli STP phase -IV
Renovation of mechanism system of screening no-01 and 02 at main inlet portion at STP sec.25 Rohini
Construction of damaged manholes of treated effluent line coming from Ghitorni STP opposite Empire Estate Sultanpur on M.B. Road
Dehydration servicing of transformers no 01 and 02 Bharat Bijli make 1500 KVA installed at Rohini Sector 25 STP
Electrification System of Newly Constructed Offices at Kondli STP under EE(SDW)-IV
Renovation and repairing centre mechanism of primary settling tank no. 01 at Sector 25 Rohini STP
Hiring of tipper as rate contract for 2 months at 45 MGD STP Ph IV Kondli
Hiring of JCB as rate contract for one year for 45 MGD KONDLI STP Ph IV
Operation and Maintenance of 5 m3/hr, 15 m3/hr RO and STP (265KLD) at Mukundpur staff quarter.
ARM OF 300 KLD CAPACITY STP FOR THE YEAR 2023-24 AT 22ND BN ITBP POLICE NEW DELHI
Laying of D.I. pipe line from STP E2, Vasant Kunj to waterbody (khasra no.660) at Rangpuri Village.
Operation of In house Statutory Testing and painting (STP) of LPG Cylinders at Madanpur Khadar LPG Bottling Plant
SITC OF 200 KLD STP PLANT AND 150 KLD ETP PLANT AT SHIVAGIRI SREE NARAYANA GURU ASHRAM, KERALA
AR and MO to Aruna Asaf Ali Govt. Hospital, Rajpur Road New Delhi SH Enclosing and barricading STP.
AR AND MO to Aruna Asaf Ali Govt Hospital Rajpur Road New Delhi SH Enclosing and barricading STP
Covering for DG Set, STP and Electrical Equipments in VBP House, RAfi Marg, New Delhi (SH: Civil Work)
Repairing servicing of 03 nos. existing hydraulic trolleys of capacity 05 ton lift at Rohini Sector-25 STP Re-invite
REPAIR MAINT OF STP CLEANING OF TANK AIR BLOWERS PUMPS CONTROL VALVES CONTROL ELECTRIC PANELS FILTER MEDIA FLOW METER MS PIPE AND ALLIED WORKS OF STP IN THE AREA OF AGE U WATER SUPPLY NO II UNDER GE U WS DELHI CANTT 10
SITC of CCTV camera at different location within the premises of STP Rithala ph-1.Re-invited
Repairing Lifting and lowering of propeller fan no.-08 at aeration tank no.-01 at Rohini Sector-25 STP Re-invite
Improvement of De-watering arrangement for Raw and Return sludge pump house and allied works at Rohini Sector 25 STP Reinvite
Comprehensive Operation and Maintenance of 9 MGD STP Chilla for 5 years and SITC of disinfection system at Chilla STP for fecal coliform treatment as per the DPCC guideline i.e. FC lessthan 230 MPN per100 ml