Loading…
Loading…
837 results • Best match
providing and supply installation testing and comm for ERP remote online monitoring software for integrating multiple PLC STP on single portal and monitoring their performance for 27 MLD STP SBR Technology including O and M Laddo Chakk at Pathankot
Construction of Boundary wall and other Civil Works at Kabristhan Adhera Road, Bypass road near STP kurali
Construction of Addl. T/F Plinth and Allied Civil Works at at 66 KV S/S STP
Survey, Soil testing, Design, Supply and construction, Installation, Commissioing of 13 MLD STP at Fazilka Distt. Fazilka
Desilating of Nalas from Kotu chowk to STP , Dismantling and Reconstruction of Rcc slab , screenings MC Kapurthala .
REPAIR AND MAINTENANCE OF STP AT BN HQ BHIKIWIND OF 71 BN BSF UNDER SHQ BSF AMRITSAR
O and M of MPS and 3 MLD STP at Phillaur South for the year 2022-23
Barricading dismantling, shifting and re-installation near Brahmaputra Hostel and near STP Main Gate at IIT Ropar
Providing and laying WBM, BM and PC on STP Road Railway line Ward No. 16 (2nd Invitation)
Design Fabrication Manufacturing Supply Erection Testing and Commissioning of STP Equipment at IOCL Bathinda LPG Bottling Plant
supply of outsourced employees from contractor for STP is one year (three sewer men, 4 pump operators)
Manning and Operation of STP-I and II, Sewage Pumping Installation and IPS at Faridkot Mil Stn
SPECIAL REPAIRS TO STP / IPS FOR MAP PHASE -I AND ITS CONNECTED ITEMS AT MILITARY STATION FARIDKOT
Road infront of Kabristan connecting STP ward no 34. Est Cost Rs. 13.9 lacs dt 13/14.07.2026
Operation and Maintenance of 6 MLD STP at Nawanshahar for the year 2026-27 01.04.2026 to 31.03.2026
Providing and Laying of HDPE Pipeline including all allied Civil Works with Material from STP, Gonsabad District Amritsar for Supply of Treated Water for Irrigation
Construction of collection sump at CETP, panel room, mixing tank at STP, panel room, force main DI pipe from CETP to STP, gravity line from mixing tank to Kala Singha drain including all mechanical, electrical and other works mentioned in DNIT.
DNIT for Construction of RCC cum Brick Masonry Pressure Type sewer, M.H. Chamber, Const. of RCC cum Brick Masonry Main Pumping Station and Const. of STP of 14 MLD Capacity including 05 Yrs O and M of STP at Faridkot
CONSTRUCTION OF STP CUM ETP OF CAPACITY 1 MLD BASED ON ANY SUITABLE SUSTAINABLE and PROVEN TECHNOLOGY INCLUDING DESIGN AND DRAWINGS WITH O and M OF STP CUM ETP FOR 60 MONTHS AFTER COMMISSIONING IN GURU NANAK DEV HOSPITAL AMRITSAR
Work of Running and maintenance of 300 KLD capacity portable STP based on MBR Technology and 300 KLD capacity portable STP based on MBBR technology installed in Ecocity1 New Chandigarh for the period 22-04-2023 to 31-03-2024
Providing and Fixing of G.O. Switch and (Sluice Valves, NRV, DI Specials and miscellaneous for MPS) at 5 MLD STP at Zone 2 and 4 MLD STP at Zone 1 and all other works contingent thereto at Sirhind Distt. Fatehgarh Sahib.
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Others; SEWAGE STP AND AC PLANT OPERATOR, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; HELPER
DNIT for Earth Filling, Construction of Roads and Boundary Wall at STP 4 MLD Kartarpur Town, Distt. Jalandhar
Providing and Fixing for Rehabilitation of 10.00 MLD STP at Samana District Patiala (Under Jal Hi Amrit Scheme).
Laying RMC on road connecting Mahavir Jain Colony and from STP pully towards garbage Dump W No.17
Supply only water disinfectant chemicals for treatment of water and for STP at Mil Stn Abohar and Fazilka
Detailed estimate for construction of 10m roads at Dairy Complex, Abohar near STP (SBD Term and Conditions Attached)
O and M of MPS and 20 MLD STP at Palahi Road Phagwara (North) (from 01.07.2022 to 31.03.2023)
Survey soil testing design supply and construction installation commissioning of 5 MLD STP at Raman Mandi Distt Bathinda
Supply, erection, testing and commissioning of EEL-2, 200 KVA power transformer and allied works at STP Moga
Operation and Maintenance of 50 MLD STP (SBR Technology) at Village- Bhattian, Ludhiana for period of 60 months
Construction of Boundary wall, earth filling and site development of STP and water works area at IFP, Chanalon
PROVN OF STP CONNECTION OF BRANCH LINE WITH MAIN SEWAGE LINE TO THE QTR AT AF STN ADAMPUR
Providing additional 200mm dia Pipe line for carrying treated water from 2.75 MLD STP at Doraha (Zone-I)
P/L of sewer pump set motors and repair of existing motor at STP Shivalik Enclave MC Kharar
Repair of 2 nos of Manhole on 72 inch dia Sewer line Connecting to STP Basti Peer Dad
Construction of shed , boundary wall, room for SWM facility at Jamsher road near STP Pholriwwal, Cantt constituency, Jalandhar
P/F DB Paving from Disposal Kacha Qila to STP and upto h/o Balvir Singh Ex-MC
Replacement of Electro Mechanical components and Three year Operation and Maintenance of Existing 4.5 MLD STP at Bathinda
Co Cement Concrete Road for Mega Girls Hostel Phase II to Road Junction near STP at NIT Jalandhar
Const. of 4 MLD Capacity STP including O and M for a period of Sixty months after stabilization period of three months or more, Balance works of MPS along with O and M of MPS for 60 months at Goraya Distt. Jalandhar
Providing and Laying of High-Density Polyethylene (HDPE) Pipeline including all allied Civil Works with Material from STP, Batala (District Gurdaspur) for Supply of Treated Water for Irrigation
Const. of MPS for old city area, Const. of 1MLD STP for area beyond Bein and 4MLD STP for old city area based on any suitable, sustainable and proven technology including other appurtenant works on turnkey basis as per DNIT including OandM
Const of MPS and STP of 2 MLD Capacity including OandM for a Period of 60 months along with OandM of MPS for 60 months after commissioning of STP at village Jalal Bhulana for new developed colonies in the villages opposite RCF Kapurthala
Providing Inst. and Comm. of Online Continuous Monitoring System probe type at the outlet of STP complete in all respect as per requirement of CPCB or PPCB and all other works contingent thereto at 25 MLD STP (SBR Technology) at Mandi Gobindgarh
Work of Running and maintenance of 300 kld capacity portable STP based on MBR technology and 300 KLD capacity portable STP based on MBBR Technology installed at Ecocity 1 New Chandigarh for the period of 01-04-2024 to 31-03-2025
E/A of Existing 10 MLD STP Bari haveli Ropar to 16.00 MLD STP and all other works contingent thereto based on any suitable sustainable proven biological Technology including other appurtenant works on turnkey basis as per DNIT Including O M of extend
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Others; SEWAGE INSTALLATION STP AND AC PLANTS OPERATOR, Manpower Outsourcing Services - Minimum wage - Unskilled; Others; HELPER
Special Repair of STP of capacity 1.5 MLD at Nagar Panchayat Maloudh and Operation and Maintenance of three Months
REPAIR/ REPLACEMENT OF STP, LIGHTENING PROTECTION, CRANE AND OTHER ALLIED WORKS AT MIL STN SURANUSSI UNDER AGE (I) SURANUSSI