Loading…
Loading…
4,486 results • Best match
ETender No56EUDCVI202021 For straightening of tilted ABC line pole replacement of damage stay rod and jumper tightening of loose LT line in the area of substation Priyadarshini under EUDD Sitapur road Transgomti LESA under the Jurisdiction of SE EUDC
For Construction of various type HT/LT line and sub-stations against sanctioned packages under deposit scheme in the area of Engineering College and Vikas Nagar Sub-Division, Under the jurisdiction of Executive Engineer, EDD-Rahim Nagar, LESA, Trans
Removal of electric pole/line which is creating obstruction in widening of the under construction road connecting Parikrama Marg to Saketpuri Yojana petrol pump in Ayodhya and construction work of LT line through underground cable for the said line,
Regarding Erection of Pole in Long Span, Gaurding of Line and Fixing PVC Sheet on Steel Pole and Strengthening of 11 KV and LT line at Kanwar Marg in the area of EDSD I Medical under EDD IV, Meerut
Various electric works to installing Distribution Box on LT line Pole and replacing consumer service cable by armoured cable at various places under the area of SDO II, Chatikara (EUDD II, Vrindavan) in the area of SE, EUDC, Mathura
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION LT Line, Laying of ABC Conductor at Sarjunagar Bindra Nagar at shuklaganj 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under EDD-II, Unnao. aginest Package in Business Plan Year 2022-23.
For various type maintenance work repairing of HT LT line damage pole straightening of tilted pole in the area of Substation Subhas Park and ITI under EUDD Mahanagar against M and R head under EUDC VI Transgomti LESA Lucknow
For Erection of new pole replacement of damage PCC pole repairing of ST pole stay set and re sagging tightening of HT LT line against M and R head in the area of EUDD Sitapur road Transgomti LESA Lucknow.
QUANTUM OF WORKS INVOLVED IN DIFFERENT WORK ( REPLACEMENT OF OLD AND JARJAR WIRE OF 11 KV AND LT. LINE, PROVIDING NEW TRANSFORMER DUE TO OVELOADING, REPLACEMENT OF OLD AND JARJAR BATTERY AND CHARGER SET AND OTHER PROTECTION RELATED EQIPMENTS
Operation and Maintenance Of Electrical Systems/Electrical Installations - Erection of 33 11 KV line strengthening LT Line strengthening and construction of new 11kv line and installation of new additional 16 25 100 kva DT work on Semi Turnkey basis ..
For Cutting and chopping of tree branches falling on HT/LT Line and LT substation in the area of 33/11 KV S/S Subhas park under E.E. EUDD Mahanagar, Transgomti LESA, Lucknow under EUDC-VI, Transgotmi LESA, Lucknow.
Installation of Additional (05Nos.) 11/0.4KV, 250KVA Transformer for reducing the load of overloaded 400KVA Transformer and construction of associated 11KV and LT line at different places in the area of UEDD-VII, Varanasi under Business Plan 2018-19
Installation of Additional (03Nos.) 11/0.4KV, 250KVA Transformer for reducing the load of overloaded 400KVA Transformer and construction of associated 11KV and LT line at different places in the area of UEDD-IV, Varanasi under Business Plan 2018-19
Installation of Additional (03Nos.) 11/0.4KV, 250KVA Transformer for reducing the load of overloaded 400KVA Transformer and construction of associated 11KV and LT line at different places in the area of UEDD-II, Varanasi under Business Plan 2018-19
Facility Management Services - Lump Sum Based - Industrial; Handling of HT armoured cables for providing power supply to HEMMs in mine and dismantling fixing of light fitting at LV Rs 33KV substations alongwith repairing of LT line providing power t..
Construction/ Mentinance of 11 KV/LT line and Wooden X Arms are replacement Other Associate work under Business Plan Scheem at various place at 11 KV Feeder Faroli at 33/11 KV S/s Bhopatpur under EDD-III, Hathras.
RE-SAGGING OF 33KV HT LINE AND GUARDING OF HT LINE IN THE GEOGRAPHICAL AREA 33/11KV S/S MAHARAJGANJ UNDER EDSD AND EDD- MAHARAJGANJ, RAEBARELI.
MS Jugal Kishor AND NDBCG Sage city LLP Village Makdoompur Kaithi Bijnour, Lucknow for shifting of 11 KV HT Line for Project Sage city against deposit scheme (Package No. 152/22-23) under Jurisdiction Of EDD, CESS-I, Cis Gomti, Lesa, Lucknow
Preventive and Break Down Maintenance of different 400 KV,220 KV,132 KV Voltage Transmission Lines under ETC-I, Panki, Kanpur
Annual Maintenance of 220 KV and 132 KV Transmission Lines for the period of 12 months, under Electy. Trans. Division-Fatehpur
Annual Maintenance of 220 KV and 132 KV Transmission Lines for the period of 12 months, under Electy. Trans. Division-Fatehpur
Preventive and Break Down Maintenance of different 400 KV/220 KV/132 KV Voltage Transmission Lines under ETC-II, Panki, Kanpur
REPAIR/MAINT OF INTERNAL ELECTRIC WIRING, LIGHT FITTING AND FIXTURES SUBMAIN WIRING, COOLING/HEATINGAPPLIANCES AND LT SUPPLY/ DISTRIBUTION SYSTEM OF LT LINE AND ALLIED WORKS OF EXTERNAL ELECTRIFICATION, DG SET IN PTS UNIT OLD AND NEW CAMPS AREA SARS
Carrying out various electric works on Turn key Basis for shifting of 11 KV, LT line, Transformer with other associated infrastructure due to Road Widening Between Chatikara Radhakund (Under Full Deposit scheme) in the area of EE, EUDD II Mathura
Work of line shifting including construction of 11 KV line LT line and installation of transformers of various capacities under Nivesh Mitra Portal, Jhatpat Portal MP Fund MLA Fund and DepositScheme under EDD Kachhwa under Deposit Scheme year 2025-26
Providing state Throw and outdoor cable jointer along with jointing kit and attending and repairing of faults of damaged 11 KV underground cables by Cable Fault Locator in the area of EUDD-(Technical) 11 KV and LT Line Network, Moradabad.
Int. Electrification 20No C Type shop, 01 Nos APF, 02NoRes.Quarter, 01No Office build. and 01 No Check post, Cons.of LT Line, S/F of LED street light, 02No Highmast, 01No. Watercooler,Cons. of Tubewell with 1 HP Sub.pump at SMY Unchahar.
QUANTUM OF WORKS INVOLVED IN construction of new 11 KV/LT line and LT S/s for G/S to different consumers (For load upto 50 KW) and different works under the full deposit scheme under the area of E.D.S.D.
For various type maintenance work repairing of HT LT line damage pole straightening of tilted pole and Guarding of line in the area of Substation Faizullaganj under EUDD Sitapur road against M and R head under EUDC VI Transgomti LESA Lucknow
EDD-Ist, sub-divisional officer under Chandauli, EDSD-IIIrd, work of straightening crooked and bent poles of 33/11 KV and LT line coming under Chakia area, work of installing spacers, replacement of damaged insulator crossarm The work of doing.
Maintenance of 11 KV Deva and Takrohi Feeder emanating from 33/11 KV S/S Chinhut works include Resagging of Loose HT/LT Line along with Re-Jumpering, gaurding, restrengthening, replacement/ maintenance/regrouting of damage Pole under EUDD-Chinhut, LE
Repairing of LT Line, S/F of LED Street Light, PolePainting, Replacement of H.P.S.V. Fitting in LED Light Fitting of HighMastLight 16 Mtr. 3No MainPanel, Cabling, Repairing of Tubewell and S/Fof 15 HP submersible pump etc.work at NMY Dibiyapur
Add. BP 2023-24 in EDD-I, Chandauli work plan of Rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated ABC cable dilapidated wire installed on LT line. on semi turn-key basis.
For Construction of HT and LT line and substation Shifting of line and pole in the area of sub division Nirala Nagar against Deposit head FY2022 2023 under EUDD Mahanagar in the jurisdiction of SE EUDC VI Trans Gomti LESA Lucknow
Add. BP 2023-24 in EDD-III, Sakaldiha work plan of Rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated ABC cable dilapidated wire installed on LT line on semi turn-key basis
QUANTUM OF WORKS INVOLVED IN Instllation New Transformer and new LT Line, ABC Conductor requried in area of Rashmilok and Gagni kheda shuklagan Unnao. 33/11 KV Sub Station Shuklaganj, EDSD-I Shuklaganj under E.D.D-II, Unnao. aginest Pakage No. 73
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection, shifting of 11 KV/LT line under full deposit scheme in the area of E.D.S.D.-III, Miyaganj under Electricity Distribution Division-V, Hasanganj, Unnao.
Work of Repair and Replacement of Damaged Poles, Jointing Kit, Damaged/New Earthing of T/F and poles, Repair of Damaged Plinth/Fencing and Guarding of lines etc. under the Jurisdiction of EUDD-(Technical), 11 KV and LT Line Network, Moradabad
Extension/repairing of LT Line, S/F of LED light on High Mast/ Pole, Inter. Electri. in diff. type Build., APF, Gate light and S/F of 02 Nos. water cooler and its related works. at NMY Nanpara Distt. Bahraich.
Internal Electrification work in 10 no. B type shops and 20 nos. C type shops, Construction of LT line against the newly constructed B type and C type shops and S/F of LED street lights at NMY Chandpur (Bijnaur)
QUANTUM OF WORKS FOR REPLACEMENT OF OLD and JARJAR 11 KV GI WIRE, LT LINE and NEW EARTHING MEDIUM AT DIFF. SITES UNDER THE BUSINESS PLAN YEAR 2025-26 (9.20 Cr) UNDER THE AREA OF EDD-IV BANGARMAU UNNAO.(10WORK).
For the Guarding work, replacement of bare conductor and fixing of Pole in 11 KV Line and LT Line at various place under business plan work in the area of EE, EUDD-III, Mathura in the jurisdiction of SE, EUDC, Mathura.
For construction of 11 KV/LT line and installation of 400 KVA 11/0.4 KV Transformer for Giving Supply to Inland Waterways Authority of India at Ravidas Ghat In the area of UEDD-IV, Varanasi under Deposit Scheme 2023-24
Janpad Amroha me NH-24 se menanpur agraula, soharka hote huye hasanpur dayawali khalsa marg (Anya Jila marg-49) ke Ch 0.000 se Ch. 14.200 tak marg se chaurikaran evam sudhrikaran karya hetu (HT/LT Line par) Pole Shifting ka karya
QUANTUM OF WORK FOR SHIFTING OF 11 KV LT LINE OF MADARNAGAR FEEDER LUCKNOW BANGARMAU BILLAHUR MARG STATE HIGHWAY CHANNEL 85.520 TO 97.900 KM DUE TO ROAD WIDENING UNDER THE AREA OF EDSD I BANGARMAU UNDER THE EDD IV BANGARMAU UNNAO.
for Construction of 11KV line, LT line by ABC conductor and installation of 04 Nos. 11/0.4 KV 400 KVA Sub Station in the area of 33/11 KV S/S Ramnagar, Varanasi under Deposit Scheme 2022-23 WITH GST
Construction work of 11 KV/LT line, feeder separation work, work of increasing the capacity of transformers and line reinforcement etc. with a view to provide fixed hours power supply to the extended urban area under EUDD-I/III, Muzaffarnagar
QUANTUM OF WORKS INVOLVED FOR (INCREASING CAPACITY OF DISTRIBUTION TRANSFORMER, INSTALATION OF NEW TRANSFORMER, BIFRECATION OF 11 KV FEEDER, LAYING OF 11 KV XLPE CABLE, RECONDUCTRING OF ABC LT LINE, SHIFTINGH OF 11 KV LINE/POLE FROM GARDEN TO ROAD
Replacement of old jarjar and rusted weasel conductor by ABC and new pole due to and span in LT line at Saiyadwada of 250 KVA T/F Kila Bazar, Safipur of 11 KV Safipur feeder, at EDD-IV, Bangarmau, Unnao.
QUANTUM OF WORKS INVOLVED IN CONSTRUCTION OF NEW 11 KV / LT LINE AND LT S/S FOR G/S TO DIFFERENT CONSUMERS AND DIFFERENT WORKS UNDER THE FULL DEPOSIT SCHEME UNDER THE AREA OF EDSD-IInd UNDER THE EDD-I UNNAO